A Quick Checklist for Subcontractors
January 26, 2017 —
Christopher G. Hill – Construction Law MusingsAfter the last two weeks’ analyses of a couple of big construction decisions that came out recently, I thought I’d keep this week’s post practical and short for those that are not construction lawyers. So without further ado, here is a short checklist of the top things (aside from calling their local experienced construction attorney) a construction subcontractor should do or look for when reviewing a construction contract from a general contractor (and for a couple of these that a general contractor can look for in its prime contract).
- ALWAYS get a copy of the Prime Contract between the Owner and the General Contractor. This contract will contain terms that will “flow down” to you through the incorporation clause that almost every subcontract contains. You can’t do much to change these terms, but you will need to know them as the job progresses.
- READ every provision of the subcontract. I know this sounds simple, but not all subcontracts hide the red flags in the same places. Remember the details of a subcontract can sink you later if you aren’t prepared.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Don’t Spoil Me: Oklahoma District Court Rules Against Spoliation Sanctions
January 08, 2024 —
Kyle Rice - The Subrogation StrategistIn Okla. Farm Bureau Mut. Ins. Co. v. Omega Flex, Inc., No. CIV-22-18-D, 2023 U.S. Dist. LEXIS 197755, the United States District Court for the Western District of Oklahoma (the District Court) determined spoliation sanctions were not warranted after a home was demolished for repair following a joint scene examination.
The insurer, Oklahoma Farm Bureau Mutual Insurance Company (Insurer) provided a policy of insurance to Michael and Sondra Diel (the Diels). On July 11, 2020, the Diels’ home was struck by lightning and their attic caught fire. Following the loss, Insurer retained both counsel and fire origin and cause experts to inspect the Diels’ property. Insurer’s counsel informed in-house counsel for Omega Flex, Inc. (Omega Flex) via a letter dated July 14, 2020, that a preliminary investigation indicated the fire may have been caused by an Omega Flex product—specifically, TracPipe Corrugated Stainless Steel Tubing (CSST). Insurer’s counsel invited Omega Flex to inspect the property, noting: “It is anticipated that the loss will exceed $300,000” and stating that any inspection “must be completed during the next two weeks.
At that time, the homeowner will proceed with demolition to rebuild.” (Emphasis added).
Read the court decisionRead the full story...Reprinted courtesy of
Kyle Rice, White and WilliamsMr. Rice may be contacted at
ricek@whiteandwilliams.com
Judge Tells DOL to Cork its Pistol as New Overtime Rule is Blocked
November 23, 2016 —
Evelin Y. Bailey – California Construction Law BlogEarlier this year we informed you that the federal Department of Labor intended to raise the minimum salary for individuals classified as executive, administrative, and professional (“white collar”) exempt employees. The result? About 4.2 million workers classified as exempt would become eligible for overtime pay on December 1, 2016, the effective date of the new rule. Businesses would need to pay $47,476 starting on December 1, 2016 to maintain the exempt status of workers.
However, a combination of business groups and states sued to invalidate the regulation, requesting expedited and emergency injunctive relief.
On November 22, 2016, a federal district court in Texas granted the emergency motion for a preliminary injunction barring the DOL from enforcing its new overtime rule. The injunction will remain until the resolution of this legal challenge to the rule.
Read the court decisionRead the full story...Reprinted courtesy of
Evelin Y. Bailey, California Construction Law BlogMs. Bailey may be contacted at
ebailey@wendel.com
How Long Does a Civil Lawsuit Take?
August 14, 2018 —
Bremer Whyte Brown & O’MearaHow long does a civil lawsuit take?
One common question among parties to a civil lawsuit, whether a plaintiff or defendant, is how long will it take to reach a resolution? The answer is tricky. The time it takes to resolve a civil lawsuit is highly dependent on various factors including the complexity of the matter and the parties’ willingness to settle.
At the outset, parties to a civil case may resolve the matter at any time by mutual agreement (i.e., settlement). In that case, the parties draft a Stipulation and Order outlining the terms of the agreed settlement and submit the document to the judge for approval. Absent of any glaring inequity in the terms of the Stipulation, the judge will typically approve of the parties’ settlement, and the matter will be deemed resolved (either in whole or in part, depending on the case, the terms of the settlement and indemnity agreement).
Read the court decisionRead the full story...Reprinted courtesy of
Bremer Whyte Brown & O’Meara
New Illinois Supreme Court Trigger Rule for CGL Personal Injury “Offenses” Could Have Costly Consequences for Policyholders
March 09, 2020 —
Michael S. Levine & Kevin V. Small - Hunton Insurance Recovery BlogThe Illinois Supreme Court’s recent decision in Sanders v. Illinois Union Insurance Co., 2019 IL 124565 (2019), announced the standard for triggering general liability coverage for malicious prosecution claims under Illinois law. In its decision, the court construed what appears to be a policy ambiguity against the policyholder in spite of the longstanding rule of contra proferentem, limiting coverage to policies in place at the time of the wrongful prosecution, and not the policies in effect when the final element of the tort of malicious prosecution occurred (i.e. the exoneration of the plaintiff). The net result of the court’s ruling for policyholders susceptible to such claims is that coverage for jury verdicts for malicious prosecution – awarded in today’s dollars – is limited to the coverage procured at the time of the wrongful prosecution, which may (as in this case) be decades old. Such a scenario can have costly consequences for policyholders given that the limits procured decades ago are often inadequate due to the ever-increasing awards by juries as well as inflation. Moreover, it may be difficult to locate the legacy policies and the insurers that issued such policies may no longer be solvent or even exist. A copy of the decision can be found
here.
The Sanders case arose out of the wrongful conviction of Rodell Sanders in 1994 by the City of Chicago Heights (the “City”). Mr. Sanders sought recompense for, among other things, malicious prosecution through a federal civil rights action against the City. In September 2016, Mr. Sanders obtained a consent judgment for $15 Million; however, at the time of the wrongful conviction, seventeen years earlier, the City’s only applicable insurance policy provided just $3 million in coverage. The City contributed another $2 million towards the judgment and, in exchange for Mr. Sanders’s agreement not to seek the $10 million balance from the City, assigned its rights under the policies for the 2012 to 2014 period.
Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth and
Kevin V. Small, Hunton Andrews Kurth
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Small may be contacted at ksmall@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Rhode Island Examines a Property Owner’s Intended Beneficiary Status and the Economic Loss Doctrine in the Context of a Construction Contract
March 18, 2019 —
Shannon M. Warren - The Subrogation StrategistIn Hexagon Holdings Inc. v. Carlisle Syntec, Inc. No. 2017-175-Appeal, 2019 R.I. Lexis 14 (January 17, 2019), the Supreme Court of Rhode Island, discussing claims associated with allegedly defective construction, addressed issues involving intended beneficiaries to contracts and the application of the economic loss doctrine. The court held that, based on the evidence presented, the building owner, Hexagon Holdings, Inc. (Hexagon) was not an intended third-party beneficiary of the subcontract between the general contractor (A/Z Corporation) and the subcontractor, defendant McKenna Roofing and Construction, Inc. (McKenna). In addition, the court held that, in the context of this commercial construction contract, the economic loss doctrine applied and barred Hexagon’s negligence claims against McKenna.
Approximately nine years after Hexagon entered into a contract with A/Z Corporation for the construction of a building, Hexagon filed suit against A/Z Corporation’s roofing installation subcontractor, McKenna, and the manufacturer of the roofing system. Hexagon alleged that the roof began to leak shortly after McKenna installed it. Notably, Hexagon did not sue A/Z Corporation.
Read the court decisionRead the full story...Reprinted courtesy of
Shannon M. Warren, White and WilliamsMs. Warren may be contacted at
warrens@whiteandwilliams.com
Court Addresses When Duty to Defend Ends
August 24, 2020 —
Anthony L. Miscioscia & Margo E. Meta - White and WilliamsThere are certain generally held principles regarding an insurer’s duty to defend. One of these principles is that an insurer has a duty to defend its insured if the complaint states a claim that potentially falls within the policy’s coverage. However, there is a lack of consistency regarding the point at which the insurers’ duty to defend ends. When the only potentially covered claim has been dismissed, must the insurer continue to defend?
Certain jurisdictions, such as Hawaii and Minnesota, have held that an insurer’s duty to defend continues through an appeals process, or until a final judgment has been entered, disposing of the entire case. Commerce & Industry Insurance Company v. Bank of Hawaii, 832 P.2d 733 (Haw. 1992); Meadowbrook, Inc. v. Tower Insurance Company, 559 N.W. 2d 411 (Minn. 1997).
Earlier this week, the U.S. District Court for the Eastern District of Pennsylvania took a different approach to this question in Westminster American Insurance Company v. Spruce 1530, No. 19-539, 2020 U.S. Dist. LEXIS 106534 (E.D. Pa. June 17, 2020) – holding that the trial court’s dismissal of the only potentially covered claim was sufficient to terminate Westminster’s duty to defend.
Reprinted courtesy of
Anthony L. Miscioscia, White and Williams and
Margo E. Meta, White and Williams
Mr. Miscioscia may be contacted at misciosciaa@whiteandwilliams.com
Ms. Meta may be contacted at metam@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Potential Extension of the Statutes of Limitation and Repose for Colorado Construction Defect Claims
April 27, 2020 —
David M. McLain – Colorado Construction LitigationOn January 27th, Senator Robert Rodriguez introduced SB 20-138 into the Colorado Legislature. The bill has been assigned to the Senate Judiciary Committee and has not yet been scheduled for its first hearing in that committee. In short, Senate Bill 20-138, if enacted, would:
- Extend Colorado’s statute of repose for construction defects from 6+2 years to 10+2 years;
- Require tolling of the statute of repose until the claimant discovers not only the physical manifestation of a construction defect, but also its cause; and
- Permit statutory and equitable tolling of the statute of repose.
Colorado’s statute of repose for construction defect claims are codified at C.R.S. § 13-80-104. In 1986, the Colorado Legislature set the statute of repose period at 6+2 years. For the last 34 years, Colorado’s statute of repose for owners’ claims against construction professionals has been substantially the same, to wit:
(1) (a) Notwithstanding any statutory provision to the contrary, all actions against any architect, contractor, builder or builder vendor, engineer, or inspector performing or furnishing the design, planning, supervision, inspection, construction, or observation of construction of any improvement to real property shall be brought within the time provided in section 13-80-102 after the claim for relief arises, and not thereafter, but in no case shall such an action be brought more than six years after the substantial completion of the improvement to the real property, except as provided in subsection (2) of this section.
(2) In case any such cause of action arises during the fifth or sixth year after substantial completion of the improvement to real property, said action shall be brought within two years after the date upon which said cause of action arises.
Read the court decisionRead the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & RoswellMr. McLain may be contacted at
mclain@hhmrlaw.com