Two Architecturally Prized Buildings May be Demolished
January 17, 2014 —
Beverley BevenFlorez-CDJ STAFFThe historic Portland Public Services Building, designed by Michael Graves, may be demolished after a report showed that “the 32-year-old building needs more than $95 million worth of repairs,” Dezeen Magazine reported. The Portland, Oregon building “is credited with being one of the first major buildings of postmodernism.” According to The Oregonian, the Portland city commissioners have differing opinions as to how to proceed. Council member Amanda Fritz commented that she “doesn’t think the problems at The Portland Building are all that bad compared to other city facilities,” while council member Nick Fish stated, “There’s got to be a better option than putting another $100 million into a white elephant.”
Dezeen Magazine also reported that the former American Folk Art Museum in New York is scheduled to be demolished to make room to extend the Museum of Modern Art (MoMA). Glenn Lowry, the MoMA director, stated that the decision came after a six-month study: “The analysis that we undertook was lengthy and rigorous, and ultimately led us to the determination that creating a new building on the site of the former American Folk Art Museum is the only way to achieve a fully integrated campus.”
The decision is being criticized by “architects, conservationists, and critics” reported Dezeen Magazine. Architects Tod Williams and Billie Tsien designed the former American Folk Art Museum. Williams and Tsien stated, “Demolishing this human-scaled, uniquely crafted building is a loss to the city of New York in terms of respecting the size, diversity and texture of buildings in a midtown neighborhood that is at risk of becoming increasingly homogenized."
Read the full story at Dezeen Magazine re The Portland Building...
Read the full story at The Oregonian re The Portland Building...
Read the full story at Dezeen Magazine re American Folk Art Museum... Read the court decisionRead the full story...Reprinted courtesy of
ASCE Statement on Devastating Impacts of Hurricane Helene
October 07, 2024 —
Marsia Geldert-Murphey, P.E., President - American Society of Civil EngineersWASHINGTON, DC. – We are deeply saddened by the tragic loss of life across six states, in addition to the immeasurable damages caused by Hurricane Helene throughout the Southeast this past week. Hundreds of communities are without power. Citizens cannot move safely from one place to another. And in its wake, the storm has left many without drinking water and sewage services. As civil engineers, our first priority when we design and build the structures that connect us is the public's safety and well-being; we are heartbroken to see so many lives lost or upended by Hurricane Helene.
As someone who has experienced losing everything in a catastrophic flood event, I have seen first-hand the need for making communities more resilient, and the consequences of failing to do so. Although hurricanes have consistently been a threat in the U.S., particularly in the Southeast, extreme weather events and 500-year floods are increasing in regularity and our aging infrastructure systems were not built to withstand storms of this magnitude. Total prevention of loss of life or property damage can never be guaranteed, but Helene is a reminder of the importance of widespread adoption of up-to-date, modern building codes and standards.
We are thankful for the hard work of first responders, the military, and other organizations working around the clock to save lives and meet the immediate needs of people affected by this storm. As communities begin the long recovery process, civil engineers will be there to help communities rebuild the roads, bridges, dams, water systems, and other infrastructure damaged or destroyed by the storm.
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 160,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
Hawaii State Senate Requires CGL Carriers to Submit Premium Information To State Legislature
March 20, 2011 —
CDJ STAFFIn light of the decision in Hawaii’s Intermediate Court of Appeals in Group Builders, Inc.,v. Admiral Insurance Company, 231 P.3d 67(2010), Hawaii’s state senate is requesting that "every domestic and foreign insurance company that has ever issued commercial general liability policies in the State is requested to submit information to the Legislature on the total premiums received for their commercial general liability policies during the past ten years"
Read Full Text of Hawaii State Senate Resolution
Read the court decisionRead the full story...Reprinted courtesy of
Chinese Drywall Manufacturer Claims Product Was Not for American Market
October 22, 2013 —
CDJ STAFFTaishan Gypsum Co. Ltd. Claimed in a hearing at the Fifth Circuit Court of Appeals that when they sold about $8.5 million of contaminated drywall to Venture Supply Inc. of Virginia, that they had no awareness that the drywall would be sold in the United States. Joe Cyr, an attorney for Taisan told the court that “Venture Supply never said it was going to distribute the goods in Virginia.”
One of the judges on the three-judge panel, Judge Jennifer Walker Elrod, was skeptical of Taishan’s claim, asking, “it was packed and labeled for the Virginia market, isn’t that correct?” When asked by a judge if Taishan was trying to avoid accountability, Cyr said that Tiashan “has not said that it doesn’t want to be accountable for its drywall.” Taishan holds the position that claims against it should be arbitrated in the People’s Republic of China.
Read the court decisionRead the full story...Reprinted courtesy of
New York Team Secures Appellate Win on Behalf of National Home Improvement Chain
September 26, 2022 —
Lewis BrisboisNew York, N.Y. (August 12, 2022) - New York Appellate Partner Nicholas P. Hurzeler, with New York Partners John J. Doody and David M. Pollack, obtained a significant appellate victory on behalf of a national home improvement chain when a New York Appellate Division panel for the Second Department reduced a jury verdict by more than half.
In this matter, which was
covered by Law360, the plaintiff was a customer at one of the chain's stores when he was involved in a confrontation with a man and his wife as they exited the store. The chain's loss prevention official told police that the plaintiff had assaulted the female customer. As a result of the incident, the plaintiff was arrested, spent the night in jail, and was arraigned at the same courthouse where he worked as a staff attorney while wearing only an undershirt and jogging shorts. He also had to disclose his arrest on his judgeship nomination application. The charges against him were ultimately dropped after the chain's loss prevention official told prosecutors that surveillance video showed that the female customer’s assault claims were false.
The plaintiff subsequently sued the home improvement chain and its loss prevention official for allegedly causing his false arrest and interfering with his career goal of securing a New York state court judgeship. At the close of the trial in this case, the jury determined that the defendant was liable for battery and false imprisonment, and awarded the plaintiff $1.8 million for pain and suffering.
Read the court decisionRead the full story...Reprinted courtesy of
Lewis Brisbois
ICC/ASHRAE/USGBC/IES Green Model Code Integrates Existing Standards
December 04, 2018 —
Nadine M. Post - Engineering News-RecordThe release this month of the 2018 edition of the International Green Construction Code marks the first time two sustainability standards developers have joined to foster green buildings and streamline code adoption. The model IgCC is now integrated with ASHRAE’s standard for high-performance buildings. And to reduce green-standard confusion even further, the 2018-IgCC is aligned with the LEED rating system program.
Read the court decisionRead the full story...Reprinted courtesy of
Nadine M. Post, ENRMs. Post may be contacted at
postn@enr.com
Making the Construction Dispute Resolution Process More Efficient and Less Expensive, Part 2
July 16, 2014 —
Beverley BevenFlorez-CDJ STAFFJohn P. Ahler, on the Ahlers & Cressman PLLC blog, has posted the second part of his two-part series on Ways to Make the Construction Dispute Resolution Process More Efficient and Less Expensive. In this post, Ahler discussed “tips on how lawyers and stakeholders can make things move quicker in arbitration.” For example, Ahler looked at the arbitration clause in the initial contract, various options for arbitration, evidence decisions, and others.
Read the court decisionRead the full story...Reprinted courtesy of
Quick Note: October 1, 2023 Changes to Florida’s Construction Statutes
November 13, 2023 —
David Adelstein - Florida Construction Legal UpdatesEffective October 1, 2023, there were changes to Florida’s statutory scheme dealing with construction projects. This includes Florida’s Lien Law. A copy of these changes can be found below which identify additions in blue and deletions with strikethroughs. No different than before, if you have questions or concerns as to your statutory rights on a construction project, do the prudent thing, consult a construction lawyer. A construction lawyer can help you understand changes to the applicable statutory scheme or how the statutory scheme pertains to your rights. This is important because you want to make sure you understand statutory changes that apply to your work and rights.
A noteworthy change, bolded in blue below, is that there is now a basis to lien for a contractor performing construction management services “which include scheduling and coordinating construction and preconstruction phases for the construction project, or who provides program management services”:
Fla. Stat. s. 713.01 (8) “Contractor” means a person other than a materialman or laborer who enters into a contract with the owner of real property for improving it, or who takes over from a contractor as so defined the entire remaining work under such contract. The term “contractor” includes an architect, landscape architect, or engineer who improves real property pursuant to a design- build contract authorized by s. 489.103(16). The term also includes a licensed general contractor or building contractor, as those terms are defined in s. 489.105(3)(a) and (b), respectively, who provides construction management services, which include scheduling and coordinating preconstruction and construction phases for the construction project, or who provides program management services, which include schedule control, cost control, and coordinating the provision or procurement of planning, design, and construction for the construction project.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com