Court Affirms Summary Adjudication of Bad Faith Claim Where Expert Opinions Raised a Genuine Dispute
July 06, 2020 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn 501 East 51st Street etc. v. Kookmin Best Ins. Co., Ltd. (No. B293605, filed 4/2/20, ordered pub. 4/16/20), a California appeals court affirmed summary adjudication and dismissal of a bad faith claim based on the genuine dispute doctrine.
501 East 51st Street Long-Beach-10, LLC (501) was the owner of a 10-unit apartment complex, insured by Kookmin Best. In 2017, an underground water main alongside the building burst which, according to 501, caused the building to move and crack. 501 made a claim and supplied a geotechnical report finding cracks in the foundation walls, cracks in the stucco and significant floor deformation and tilting near the water leak. The engineer’s opinion concluded that that “existing building distress was substantially contributed to by the water main break. The water introduced to the soil medium appears to have triggered differential foundation movement causing the stress features to develop.”
Kookmin retained its own engineers to investigate, who returned an opinion that the leak had exacerbated long-term pre-existing settlement which would continue. Under the policy, damage to the building caused by earth movement and settlement were excluded, but water damage resulting from an “accidental discharge” of water was covered. Kookmin then obtained an opinion from coverage counsel, who opined that only damage allocable to the water leak would be covered.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
The Anatomy of a Construction Dispute Stage 2- Increase the Heat
January 21, 2015 —
Christopher G. Hill – Construction Law MusingsLast week we discussed the groundwork and circumstances of a construction claim. This week’s post will discuss the next steps, hopefully short of full blown arbitration or litigation that you, as a construction company, can pursue presuming your claim has been properly preserved.
If your contract requires certain steps such as informal resolution attempts or other items, these are the first things that must be done while still preserving your rights to pursue all remedies available. Instituting such contractually required resolution steps can and should be the first “notch” on the dial of increased pressure on the Owner, General Contractor or possibly Subcontractor against whom you have a claim.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, Law Office of Christopher G. Hill, PCMr. Hill may be contacted at
chrisghill@constructionlawva.com
Voluntary Payments Affirmative Defense Does Not Apply in Contract Cases
July 16, 2023 —
David Adelstein - Florida Construction Legal UpdatesIn certain matters, there is an affirmative defense referred to as the “voluntary payments” defense. This defense states, “where one makes a payment of any sum under a claim of right with knowledge of the facts such a payment is voluntary and cannot be recovered.” Avatar Properties, Inc. v. Gundel, 48 Fla.L.Weekly D1272c (Fla. 6th DCA 2023) quoting City of Miami v. Keton, 115 So.2d 547, 551 (Fla. 1959). This voluntary payments defense could be construed as a “gotcha” defense, right? Unfair! You voluntarily made the payment with knowledge of the facts; therefore, you are s**t out of luck when it comes to recovering the potentially wrongful payment.
Well, guess what? This voluntary payments affirmative defense does NOT apply in contract disputes. This is codified by Florida Statute s. 725.04 which states: “When a suit is instituted by a party to a contract to recover a payment made pursuant to the contract and by the terms of the contract there was no enforceable obligation to make the payment or the making of the payment was excused, the defense of voluntary payment may not be interposed by the person receiving payment to defeat recovery of the payment.” Fla.Stat. s. 725.04. See also Avatar Properties, supra (explaining voluntary payment defense does not apply in contract cases and even in non-contract cases it doesn’t apply if payment made under coercion or compulsion).
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Connecticut Reverses Course for Construction Managers on School Projects
August 05, 2024 —
Anand Gupta - Construction Law Zone BlogOn June 6, 2024, Connecticut Governor Ned Lamont signed into law Public Act 24-151 (H.B. 5524) (Bill 5524). Bill 5524 authorized and adjusted bonds of the state and provisions related to state and municipal tax administration, as well as addressed school building projects. Notably, Bill 5524 removed the ban on construction managers self-performing work on public school construction projects, effective July 1, 2024. Allowing construction managers to self-perform certain portions of the work, such as general trades, subject to the standard bidding requirements, is a common industry practice that, theoretically, reduces total project costs by reducing the amount of subcontracted work. However, proponents of banning self-performance argue that construction managers have too much information to bid fairly and competitively.
Reprinted courtesy of
Anand Gupta, Robinson+Cole
Mr. Gupta may be contacted at agupta@rc.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Lewis Brisbois Ranks 11th in Law360’s Glass Ceiling Report on Gender Parity in Law Firms
October 11, 2021 —
Lewis BrisboisLewis Brisbois has ranked 11th in Law360’s 2021 Glass Ceiling report, moving up from 37th place in 2020. The report measures female presence and gender parity in law firms, this year evaluating 269 organizations.
As described in the Law360 Pulse article titled "Glass Ceiling Report: How Does Your Firm Stack Up?," the publication redesigned its report this year to evaluate female attorneys’ industry standing from a new angle by showing how the percentage of women across three levels within law firms compared with the potential marketplace of hires. This evaluation resulted in the firms’ "pipeline scores," which measure a firm’s percentage points above or below a set of benchmarks assembled with data from the American Bar Association and previous Law360 submissions.
Lewis Brisbois’ Los Angeles Co-Managing Partner Jana Lubert and Chief Strategy Officer Janet Eskow, the co-chairs of Lewis Brisbois' Women's Initiative, each expressed excitement about the report, along with resolve to further promote gender diversity. "We are proud that Lewis Brisbois has moved up in these rankings because we have focused diligently on hiring and retaining the best legal talent from a diverse pool of candidates nationwide," Ms. Lubert said. "At the same time, we recognize that there is more to be done to further improve gender equity and inclusion. We remain committed to this important goal, both as it pertains to Lewis Brisbois and to the entire legal industry," she added.
Read the court decisionRead the full story...Reprinted courtesy of
Lewis Brisbois
Presidential Memorandum Promotes Reliable Supply and Delivery of Water in the West
November 14, 2018 —
Anthony B. Cavender - Gravel2GavelIn a Memorandum dated October 19, 2018 and entitled Promoting the Reliable Supply and Delivery of Water in the West, the President has directed the Secretaries of the Interior and Commerce to work together to minimize “unnecessary regulatory burdens and foster more efficient decision-making” so that major federal water projects are constructed and operated in a manner that delivers water and power in an “efficient, cost-effective way.” More specifically, they will take steps to streamline the western water infrastructure regulatory processes and remove unnecessary burdens in accordance with the timetables set forth in the Memorandum.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Court of Appeal Puts the “Equity” in Equitable Subrogation
October 05, 2020 —
Garret Murai - California Construction Law BlogSubrogation as a concept is well understood in insurance circles. According to the Institute of Risk Management Institute’s glossary of insurance terms subrogation is “the assignment to an insurer by the terms of [a] policy or by law, after payment of a loss, of the rights fo the insured to recover the amount of the loss from one legally liable for it.” In other words, if an insurer comes out of pocket for something someone else broke, the insurer can turn to that responsible party for reimbursement of its out of pocket costs.
Typically, subrogation is, as stated in IRMI’s glossary of insurance terms, a matter of contract and the rights and responsibilities of parties are set forth within the terms of a policy. However, subrogation may, as stated in IRMI’s glossary, also be matter of law. And this is where equitable subrogation comes in.
“Equitable subrogation,” according to IRMI, is “the right of subrogation granted under common law when one party has made a payment on behalf of another and becomes entitled to whatever recovery rights the other party has against a responsible third party.”
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Clearly Determining in Contract Who Determines Arbitrability of Dispute
April 26, 2021 —
David Adelstein - Florida Construction Legal UpdatesAs you know from prior postings: “Arbitration provisions are creatures of contract and must be construed ‘as a matter of contract interpretation.’ ” Fallang Family Limited Partnership v. Privcap Companies, LLC, 46 Fla.L.Weekly D639e (Fla. 4th DCA 2021) (citation omitted). Thus, if you prefer to arbitrate potential disputes, instead of litigating potential disputes, you want to include an arbitration provision in your contract. While there are positives and negatives to arbitration, no different than litigation, these positives and negatives should be considered during the contract negotiation process when dealing with the dispute resolution process in the contract.
Generally, under the law, the arbitrability of a dispute is determined by the court. However, this can be deferred to the arbitrator with clear and unmistakable language in the contract.
By way of example, the American Arbitration Association includes a rule that allows an arbitrator to rule on the arbitrability of the dispute, i.e., the claims asserted are subject to the governing arbitration provision in the contract. Recent law has suggested that if the objective is to authorize an American Arbitration Association arbitrator to make this determination, the contract clearly and unmistakably needs to state this intent and generally referring to the American Arbitration Association rules is not good enough. For this reason, I have included in arbitration provisions language that specifically states, “In the event of any dispute as to the arbitrability of any claim or dispute, the parties agree that an appointed arbitrator within the American Arbitration Association shall make this determination.” I have also included in arbitration provisions the converse so that if there is a dispute as to the arbitrability of a claim or dispute, the court, and not the arbitrator, will make this determination.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com