Massachusetts Court Holds Statute of Repose Bars Certain Asbestos-Related Construction Claims
April 17, 2019 —
Timothy J. Keough & Rochelle Gumapac - White and Williams LLPIn Stearns v. Metropolitan Life Insurance Company, the Massachusetts Supreme Judicial Court (SJC) addressed whether the six-year statute of repose for improvements to real property applies to long-tail tort claims, such as those caused by exposure to asbestos. Reasoning that the language of § 2B is clear, unambiguous and unequivocal, the SJC held that Mass. Gen. Laws. c. 260 § 2B does in fact bar all tort claims arising out of a deficiency or neglect in the design, planning, construction or general administration of an improvement to real property filed after the expiration of the six-year repose period. Additionally, the court affirmed that the time limitations imposed by the statute of repose may not be tolled for any reason six years after either the opening of the improvement for use or the owner taking possession of the improvement for occupation upon substantial completion, whichever may occur first.
Reprinted courtesy of
Timothy J. Keough, White and Williams LLP and
Rochelle Gumapac, White and Williams LLP
Mr. Keough may be contacted at keought@whiteandwilliams.com
Ms. Gumapac may be contacted at gumapacr@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Seattle’s Audacious Aquarium Throws Builders Swerves, Curves, Twists and Turns
January 08, 2024 —
Nadine M. Post - Engineering News-RecordPatrick Nation describes the reinforcing steel for the main tank of the 50,000-sq-ft Seattle Aquarium Ocean Pavilion as a “monster” job for CMC Rebar. In his mind, it was like bending 496 tons of bars “on a golf ball.” In reality, the operation was more like weaving a giant steel basket. Ironworkers had to painstakingly hand-thread the reinforcing steel for the doubly curved and slanted concrete walls of the 350,000-gallon saltwater exhibit—one bar at a time—to create the dense latticework for the 41-ft-tall basket.
Reprinted courtesy of
Nadine M. Post, Engineering News-Record
Ms. Post may be contacted at postn@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Another TV Fried as Georgia Leads U.S. in Lightning Costs
June 26, 2014 —
Kelly Gilblom – BloombergGeorgia tops a shocking list: most likely place to have property damaged by lightning.
Georgia residents were reimbursed for $56 million of lightning-related damage in homes last year tied to more than 11,000 claims, according to a top-10 list from the Insurance Information Institute. Texas ranked second at $54.2 million.
Once lightning is “in the wiring, it’s electrifying anything connected to that,” John Jensenius, a lightning-safety specialist at the National Weather Service, said today in a phone interview. “Televisions, and even things like microwaves, they all have little chips in them so they all can get fried pretty easily.”
Lightning cost insurers $5,869 per claim in the U.S. last year, more than double the average in 2004, as homeowners added electronics such as computers and high-definition televisions. Still, the total expense for the industry declined 8.4 percent nationwide in that span, to $673.5 million in 2013, because better lightning-protection systems and fewer storms decreased the frequency of claims, the industry group said.
Read the court decisionRead the full story...Reprinted courtesy of
Kelly Gilblom, BloombergMs. Gilblom may be contacted at
kgilblom@bloomberg.net
Continuing Breach Doctrine
May 28, 2024 —
David Adelstein - Florida Construction Legal UpdatesHave you ever heard of the “continuing breach” doctrine? Probably not. It is not a doctrine commonly discussed. It’s a doctrine used to try to argue around the statute of limitations.
In an older Southern District Court of Florida case, Allapattah Services, Inc. v. Exxon Corp., 188 F.R.Ed. 667, 679 (S.D.Fla. 1999), the court explained: “Under this [continuing breach] doctrine, a cause of action for breach of a contract does not begin to accrue upon the initial breach; rather, on contracts providing serial performance by the parties, accrual of a breach of contract cause of action commences upon the occurrence of the last breach or upon termination of the contract.”
Recently, this doctrine came up in an opinion by Florida’s Fifth District Court of Appeal. In Hernando County, Florida v. Hernando County Fair Association, Inc., 49 Fla.L.Weekly D947b (Fla. 5th DCA 2024), a plaintiff appealed the trial court’s dismissal with prejudice of its breach of contract claim based on the statute of limitations. The plaintiff claimed the defendant breached the contract by its failure to substantially redevelop property. The trial court dismissed based on the statute of limitations. However, the complaint alleged the defendant’s failure to comply “with numerous other intertwined, ongoing, and continuing contractual duties and obligations.” Hernando County, supra. The Fifth District reversed based on the continuing breach doctrine: “Where the nature of the contract is continuous, statutes of limitations do not typically begin to run until termination of the entire contract.” Id. quoting and citing Allapattah Servs., Inc.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Dot I’s and Cross T’s When It Comes to Construction Licensure Requirements
February 21, 2022 —
David Adelstein - Florida Construction Legal UpdatesIt should serve as no surprise that making sure you are appropriately licensed is important. This includes complying with any state requirement that requires licensure, as well as complying with any local licensure requirement. Not doing so can result in the dispute centered on the lack of licensure, as opposed to leading facts relating to the substance of the dispute. In other words, you are dealing with a technicality that could have harsh implications. This lack of licensure issue recently played out in a dispute with a contractor and subcontractor in ABA Interior, Inc. v. The Owen Corp., 2022 WL 386103 (Fla. 4th DCA 2022), dealing with a local licensure requirement.
In this case, a subcontractor was hired by the general contractor for a commercial project in Palm Beach County. The subcontract contained the standard provision that the subcontractor would comply with all federal, state, and local laws and ordinances.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Ahlers Cressman & Sleight PLLC Recognized Among The Top 50 Construction Law Firms by Construction Executive
June 20, 2022 —
Scott R. Sleight - Ahlers Cressman & Sleight PLLCACS is proud to announce it has once again been ranked among The Top 50 Construction Law FirmsTM in the Construction Executive 2022 rankings. ACS is the highest ranked law firm in the US practicing out of a single office.
ACS specializes in delivering the highest quality construction law services. ACS prides itself on providing excellent services to clients in matters relating to contract documents, construction dispute resolution, and government contracts. If resolution efforts fail, ACS has the experience and ability to represent clients in high-stakes litigation. Since 2018, ACS has obtained three significant jury verdicts in favor of its general contractor clients, including awards of prevailing party attorneys’ fees and costs and expenses.
Founded in 2007, ACS’ vast knowledge and industry experience led our lawyers to hold many leadership positions. Three of our lawyers are past chairs of the Washington State Bar Association’s Construction Law Section, five of our lawyers have served as the Chair of the Associated General Contractors of Washington’s Legal Affairs Committee, and many of our lawyers are recognized as Super Lawyers and Rising Stars in Super Lawyers Magazine/Thomson Reuters. We have represented construction firms before the Supreme Court and the Court of Appeals in numerous precedent-setting cases, and have testified before the Legislature. ACS’ commitment to the construction industry shows in our results.
Read the court decisionRead the full story...Reprinted courtesy of
Scott R. Sleight, Ahlers Cressman & Sleight PLLCMr. Sleight may be contacted at
scott.sleight@acslawyers.com
Daily Construction Reports: Don’t Leave the Job Without Them
January 11, 2022 —
Patrick Barthet - Construction ExecutiveTrying to remember exactly what was done at a job site last week, last month or last quarter along with knowing who worked at the site is nearly impossible without a written, video or electronic record for reference. That’s why daily construction reports are so important.
Yet many contractors fail to create these reports. And those that do create them, may do it only at the beginning of a project or sporadically throughout the progress of a job, and generally only when they are reminded to do so. Daily reports only become truly effective when they are, in fact, done daily. Whether it is to help resolve a pending delay issue or clarify a job site access claim, or any number of other matters where what happened at the time is so critical, those daily construction reports should be completed daily.
Be Timely
The reason that daily reports are admissible in court (with corroborating testimony) is that they are interpreted as being recorded at or about the time the events in question occurred. Field managers should, therefore, write up these reports daily while the work is occurring or very soon thereafter to capture as accurate an account as possible. If these reports are not created until the end of the week or month, the information will not be as accurate and may not be as helpful in supporting a particular position.
Reprinted courtesy of
Patrick Barthet, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Barthet may be contacted at
pbarthet@barthet.com
Colorado Court of Appeals to Rule on Arbitrability of an HOA's Construction Defect Claims
November 20, 2013 —
W. Berkeley Mann, Jr. — Higgins, Hopkins, McLain & Roswell, LLCOn October 24, 2013 the Colorado Court of Appeals granted a rare interlocutory appeal in a multi-family residential construction defect case. The Court of Appeals accepted the case ofTriple Crown at Observatory Village Association, Inc. v. Village Homes of Colorado, Inc.(2013 WL 5761028) as an interlocutory appeal after the parties briefed and obtained rulings from the trial court that compelled the case to binding arbitration in lieu of a jury trial on all issues. The appellate decision of October 24, 2013 did not decide the merits of the case, but discussed the issues to be decided in the eventual merits decision. The significance of the issues presented and the interlocutory nature of this appeal both make this case worth watching for further appellate proceedings.
The core issue in this appeal was the applicability of Colorado’s Uniform Arbitration Act (C.R.S. § 13-22-201, et seq.), based on recorded Declarations filed by the developer. The Declarations mandated that the HOA arbitrate any design/construction disputes with the developer. Immediately prior to suit, the Association sought to amend the Declarations in order to avoid the arbitration process for these claims. The interlocutory appellate issues resulted from the trial court’s order compelling the arbitration over the objections of the Association.
The trial court’s decision was based on a reading of the Colorado Revised Non-Profit Corporation Act (“CRNPC,” at C.R.S. § 7-127-107), which was found applicable to the Association.
Read the court decisionRead the full story...Reprinted courtesy of
W. Berkeley Mann, Jr.W. Berkeley Mann, Jr. can be contacted at
mann@hhmrlaw.com