Is Ohio’s Buckeye Lake Dam Safe?
March 12, 2015 —
Beverley BevenFlorez-CDJ STAFFAccording to Columbus Business First, a report by the U.S. Army Corps of Engineers that “assessed the structural integrity of the Buckeye Lake Dam [located in Ohio] and found serious problems that present significant risks to the public.”
Problems arose, allegedly, from “construction of homes [and] pools and patios that have been built into the earthen embankment.” The U.S. Army Corps of Engineers report stated (according to Columbus Business First) “there was a potential for an eight-foot wave of water, mud and debris that would inundate an area as far as Hebron, more than two miles away.”
Read the court decisionRead the full story...Reprinted courtesy of
Shoring of Ceiling Does Not Constitute Collapse Under Policy's Definition
November 12, 2019 —
Tred R. Eyerly - Insurance Law HawaiiDespite the need to shore up the ceiling, the building was not in a state of collapse under the language of the policy. Ravinia Vouge Cleaners v. Travelers Cas. Ins. Co. of Am., 2019 U.S. Dist. LEXIS 123594 (N.D. Ill. July 24, 2019).
Ravinia Cleaners held a property policy issued by Travelers for the building from which it operated its dry-cleaning business. On February 2, 2015, there was heavy snowfall. On February 4, Ravinia reported to Travelers a leak coming from the ceiling. A temporary "shoring " was placed on the ceiling. Ravinia reported to Travelers that there was damage to the roof on February 25, 2015. Travelers hired an engineer who observed a buckling truss and roof displacing downward. The inspector recommended that the building be vacated and not occupied until adequate shoring was in place.
Travelers denied coverage because the building was in a state of imminent collapse which was caused by the weight of ice and snow, and defective construction of the truss system. The policy excluded damage relating to a "collapse of a building." Collapse was defined by the policy as "an abrupt falling down or caving in of a building or any part of a building," such that the building could not be occupied for its intended purpose. There were exceptions to the exclusion, however, if the cause of the collapse was: (1) weight of snow; or (2) use of defective materials or methods in construction if the collapse occurred after construction. The policy also excluded damage from a building being in a state of imminent collapse unless the damage was caused by: (1) weight of snow; or (2) use of defective materials or methods in construction if the collapse occurred during construction.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Thank You!
February 28, 2022 —
Garret Murai - California Construction Law BlogI would like to thank the Construction Law Subsection of the Los Angeles County Bar Association for awarding me today (on 2/22/22 nonetheless) the 2022 James Acret Award for Outstanding Achievement in Construction Law Legal Writing.
The nominating committee of the subsection includes a veritable Who’s Who of construction law attorneys including Donna Kirkner (Chair), Michael J. Bayard, Theresa C. Tate, Aaron J. Flores, Marilyn Klinger, Marion Hack, John D. Hanover, James C. Earle, L. Adam Winegard, Bernard S. Kamine and Ashley B. Jordan.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Motion to Dismiss Insureds' Counterclaim on the Basis of Prior Knowledge Denied
September 04, 2018 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer unsuccessfully moved to dismiss portions of the insureds' counterclaim based upon prior knowledge. Hudson Spec. Ins. Co. v. Talex Enter., 2018 U.S. Dist. LEXIS 105598 (S. D. Miss. June 25, 2018).
The insureds' building collapsed in McComb, Mississippi. Pubic utilities were damaged and traffic disrupted. The City sued the insured, alleging that the building collapsed because there was too much water gathered on its roof. The City further alleged that the insureds knew too much water was on the roof because they had been told by someone hired to clean the drain that it was clogged and by a contractor that the roof was so damaged that it could not safely be repaired.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
U.S. Architecture Firms’ Billing Index Faster in Dec.
February 05, 2015 —
Bloomberg News(Bloomberg) -- Billings at U.S. architecture firms grew at a higher rate in December, according to the American Institute of Architects.
Billings at architecture firms, tracked by the Work-on-the-Boards survey, measured 52.2 in December compared to 50.9 a month earlier. The inquiry index, which tracks a firm’s capacity to take on additional work, moved to 58.2.
Read the court decisionRead the full story...Reprinted courtesy of
Bloomberg News
Surveys: Hundreds of Design Professionals See Big COVID-19 Business Impacts
April 27, 2020 —
Bruce Buckley & Debra K. Rubin - Engineering News-RecordAs more states, counties and cities call on non-essential businesses to shut down to help ease the effects of the coronavirus pandemic, design professionals already see major workload impacts from the economic slowdown, according to three new association surveys of members and one of CEOs by a financial consulting firm.
Reprinted courtesy of
Bruce Buckley, Engineering News-Record and
Debra K. Rubin, Engineering News-Record
Ms. Rubin may be contacted at rubind@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Breaking with Tradition, The Current NLRB is on a Rulemaking Tear: Election Procedures, Recognition Bar, and 9(a) Collective Bargaining Relationships
September 09, 2019 —
Keahn Morris, John Bolesta & James Hays - Construction and Infrastructure Law BlogIn its 84-year history, the National Labor Relations Board (NLRB, Board or Agency) has promulgated a very small number of rules pursuant to the Administrative Procedures Act, relying, instead, on individualized adjudications to establish the Board’s legislative policies. However, breaking with that long tradition, the current Board now appears to be on the verge of a formal rulemaking jag for on May 22, the Board released its “Unified Agenda” of anticipated regulatory actions which, in addition to proceeding with rulemaking regarding joint employer standards, announced the Board’s intention to consider formal rulemaking in a number of critical areas. Consistent with that wide-ranging Agenda, on August 12, the Board published a Notice of Proposed Rulemaking (NPRM) over the objection of Democratic appointee, Lauren McFerran, that would amend the Agency’s rules and regulations governing the filing and processing of election petitions in three very important ways. This NPRM, therefore, deserves attention.
The first possible amendment will modify the Board’s administrative election blocking charge practice by establishing a regulation-based vote and impound procedure to be used when a party, typically a union facing possible decertification, files an unfair labor practice (ULP) charge and, based thereon, seeks to block the holding of an election.
The second possible amendment will modify the Board’s current recognition bar case law by codifying prior Board case doctrine and creating a regulation-based requirement of notice of voluntary recognition to affected employees and a 45-day open period within which affected employees may call for an election before that voluntary recognition will be allowed to operate as a bar to employees raising later questions concerning the union’s representative status (QCR).
Reprinted courtesy of Sheppard Mullin attorneys
Keahn Morris,
John Bolesta and
James Hays
Mr. Morris may be contacted at kmorris@sheppardmullin.com
Mr. Bolesta may be contacted at jbolesta@sheppardmullin.com
Mr. Hays may be contacted at jhays@sheppardmullin.com
Read the court decisionRead the full story...Reprinted courtesy of
GA Federal Court Holds That Jury, Not Judge, Generally Must Decide Whether Notice Was Given “As Soon as Practicable” Under First-Party Property Damage Policies
November 01, 2021 —
Edward M. Koch & Lynndon K. Groff - White and WilliamsInsurance policies covering first-party property damage often require insureds to notify insurers of a loss “as soon as practicable.” Where an insured may or may not have given notice “as soon as practicable,” the issue arises as to who should determine whether the insured complied with this requirement: the judge or the jury?
On October 6, 2021, the United States District Court for the Middle District of Georgia addressed this issue in Vintage Hospitality Group LLC v. National Trust Insurance Company, Case No. 3:20-cv-90-CDL, 2021 U.S. Dist. LEXIS 192651 (M.D. Ga. Oct. 6, 2021). In Vintage Hospitality, a July 2018 hailstorm damaged the roof of a hotel owned by the policyholder. The policyholder did not discover leaks from the hotel roof until two months later, in September 2018. The policyholder, not realizing that the hailstorm had caused the leaks, unsuccessfully attempted to repair the leaks. Eventually, in February 2020—19 months after the hailstorm and 17 months after the policyholder discovered the leaks—the policyholder hired a construction company to evaluate the roof. It was not until then that the policyholder learned that the hotel had sustained hail damage from the July 2018 storm. The policyholder notified its July 2018 first-party property damage insurer a few days later.
Reprinted courtesy of
Edward M. Koch, White and Williams and
Lynndon K. Groff, White and Williams
Mr. Koch may be contacted at koche@whiteandwilliams.com
Mr. Groff may be contacted at groffl@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of