Christopher Flavelle & Henry Goldman - BloombergIt sounds like a Hollywood disaster movie.
A Category 5 hurricane churning in the mid-Atlantic suddenly veers northwest -- and heads straight for New York City.
The good news is that, for now, experts agree a Cat 5-sized deluge appears to be a meteorological impossibility in the U.S. Northeast, given today’s sea temperatures and weather patterns.
The bad news: A storm doesn’t need to pack the wallop of a Harvey or an Irma to knock out the region. Superstorm Sandy, whose wind speed was a relatively tame 80 miles per hour when it reached New Jersey, did $70 billion of damage in October 2012. Irma made landfall in Puerto Rico at 185 mph.
Reprinted courtesy of
Christopher Flavelle, Bloomberg and
Henry Goldman, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
No Coverage for Sink Hole Loss
June 18, 2019 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court found there was no coverage under the commercial property policy for loss suffered by the insured condominium association due to a sink hole. Bahama Bay II Condo. Ass'n. v. Untied Nat'l Ins. Co., 2019 U.S. Dist. LEXIS 67487 (M.D. Fla. April 11, 2019).
The plaintiff condominium association had thirteen buildings inside their complex. On December 9, 2016, a sinkhole appeared near Building 43. The building was vacated and declared unsafe. Plaintiff's board excused Building 43 owners from paying association dues.
Plaintiff submitted a claim to the insurer for benefits under the policy. The insurer inspected and accepted coverage for Building 43 under the policy's Catastrophic Ground Cover Collapse (CGCC) provision and issued a check for $290,000 for immediate repairs. The insurer denied coverage for Buildings 42, 44, and 45; repairs to the foundation of all buildings, the retaining wall and outdoor fences; land, landscaping, and patios, uncollected association dues, and condominium unit owner property.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Utility Contractor Held Responsible for Damaged Underground Electrical Line
October 11, 2017 —
Brett M. Hill - Ahlers & Cressman, PLLCThe Washington State Court of Appeals recently addressed an excavation contractor’s responsibilities under the Underground Utilities Damage Prevention Act (UUDPA), RCW 19.122. That statute was enacted in 2011 and imposed certain statutory duties on parties involved with projects requiring excavation.
In this case, Titan Earthworks, LLC contracted with the City of Federal Way to perform certain street improvements including installation of a new traffic signal. During the process of excavating for the traffic signal, Titan drilled into an energized underground Puget Sound Energy power line. PSE sought damages from Titan and Titan sued the City of Federal Way.
Read the court decisionRead the full story...Reprinted courtesy of
Brett M. Hill, Ahlers & Cressman, PLLCMr. Hill may be contacted at
bhill@ac-lawyers.com
What is Toxic Mold Litigation?
May 30, 2018 —
Vik Nagpal – Bremer Whyte BlogTo understand what Toxic Mold Litigation is, it is important to first identify and understand what toxic mold is. Mold is a fungus which is essentially everywhere, and certain types of mold, known as toxic mold, may cause severe personal injuries and/or property damage. Toxic mold refers to those molds capable of producing mycotoxins which are organic compounds capable of initiating a toxic response in vertebrates. Toxic mold generally occurs because of water intrusion, from sources such as plumbing problems, floods, or roof leaks.
It is this ageless life form that has spawned a new species of toxic tort claims and has had legal and medical experts debating the complex health implications that follow. Here is some information as to what toxic mold litigation is and when you should hire a lawyer for toxic mold.
Read the court decisionRead the full story...Reprinted courtesy of
Vik Nagpal, Bremer Whyte Brown & O'Meara LLPMr. Nagpal may be contacted at
vnagpal@bremerwhyte.com
Three-Year Delay Not “Prompt Notice,” But Insurer Not “Appreciably Prejudiced” Either, New Jersey Court Holds
November 04, 2019 —
Anthony L. Miscioscia and Timothy A. Carroll - White and Williams LLPIn Harleysville Preferred Insurance Company v. East Coast Painting & Maintenance, LLC, 2019 U.S. Dist. LEXIS 135295 (D.N.J. Aug. 12, 2019) (East Coast Painting), the U.S. District Court for the District of New Jersey held that an insurer, which received notice of a bodily injury accident three years after it happened, was not “appreciably prejudiced” by such late notice, even as the court acknowledged notice three years later did not satisfy the policy’s “prompt notice” condition. The court also held that the policy’s “Operational Exclusion,” which excluded coverage for bodily injury arising out of the operation of “cherry pickers and similar devices,” did not apply because the accident arose out of the use of a “scissor lift,” which is not a device similar to a cherry picker.
East Coast Painting arose out of a Queens, New York bridge-painting project, during which an employee of the insured, East Coast Painting and Maintenance LLC was injured while “standing on a scissor lift mounted to the back of a truck,” owned and operated by East Coast. The employee sued various project-related entities which, in turn, joined East Coast as a defendant. East Coast sought coverage under its business auto policy, and the insurer agreed to defend the insured under a reservation of rights. The insurer subsequently sought a declaration that it did not owe coverage based on, among other things, the policy’s “Operational Exclusion,” and the insured’s failure to satisfy the policy’s “prompt notice” condition. The insurer moved for summary judgment on both of those bases, but the court in East Coast Painting denied the motion.
As for the insurer’s “prompt notice” defense, the court in East Coast Painting concluded that, the insured’s notice to the insurer was not prompt because it did not receive notice until three years after the accident. But, the court added, the inquiry does not end there. “[T]his Court must determine whether [the insurer] was appreciably prejudiced by that delay.” Reviewing the facts, the court held that the insurer was not “appreciably prejudiced,” even though during the three-year delay the lift truck was “not properly maintained” or “in the same condition it was at the time of the Accident.” The court observed that the insurer had “ample other evidence with which it can defend itself,” such as experts who inspected the lift truck and opined about the cause of the accident.” [Emphasis added.] Further, “there are multiple contemporaneous accident reports,” “a list of the East Coast employees on site at the time,” “photographs of the lift truck and its location when [the employee] was injured,” and “depositions of [the employee] and others regarding the events at issue.” Thus, the court held, the insurer was not prejudiced and summary judgment was inappropriate.
Reprinted courtesy of
Anthony L. Miscioscia, White and Williams LLP and
Timothy A. Carroll, White and Williams LLP
Mr. Miscioscia may be contacted at misciosciaa@whiteandwilliams.com
Mr. Carroll may be contacted at carrollt@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Other Colorado Cities Looking to Mirror Lakewood’s Construction Defect Ordinance
October 22, 2014 —
Beverley BevenFlorez-CDJ STAFFThe Denver Post reported that some Colorado metro communities “say they are ready to take a hard look at modifying Colorado's law on builder defects, which they blame for hampering new condominium construction amid the buildout of the region's 122-mile commuter-rail system.” Lone Tree has “scheduled a study session for Tuesday to discuss drafting its own construction-defects ordinance while a city councilmember in Englewood has put in a request that the city take up the topic.” According to the Denver Post, “Brighton, Broomfield and Centennial…also want to give the issue more attention.”
Read the court decisionRead the full story...Reprinted courtesy of
Tarriffs, a Pandemic and War: Construction Contracts Must Withstand the Unforeseeable
May 16, 2022 —
Brett Moritz, Adrian Bastianelli III & Adam Handfinger - Construction ExecutiveSince the tariffs on steel and the first wave of the COVID-19 pandemic, the construction industry has been reeling from the impact of material shortages and price increases, labor shortages, breakdowns in the supply chain and the inflationary effect of these issues. Unfortunately, the war in Ukraine has only exacerbated the situation.
International conflicts can constrain supply, resulting in delays and price increases for contractors, subcontractors and suppliers. The disruption caused by the war is expected to be particularly acute due to the role that Russia and Ukraine play in the world economy and the effect of the economic sanctions that have been imposed on Russia by the United States and other countries. Russia controls approximately 10% of the global copper reserves and is estimated to produce about 10% of the world’s nickel supply. It also provides at least 30% of Europe’s oil and natural gas. Ukraine is a significant source of raw materials, such as iron. Thus, the war will cause significant shortages and price increases to the global construction industry. There are already reports of delays and cost increases for commodities such as nickel, aluminum, copper and—most importantly—steel, which have resulted in impacts to construction costs and schedules. Suppliers are especially sensitive to the volatile markets caused by these conditions. Some are insisting on automatic price increases in their purchase orders.
All of this, not to mention the anticipation of what may come next, points to the necessity for a new paradigm to achieve a successful project. It is more important today than ever that owners, contractors, subcontractors and suppliers reasonably address the economic and time impacts of these unforeseeable events in preparing contracts for future work and in administering existing contracts. Otherwise, the risk of a default on more than one level may put projects in jeopardy, to no one’s benefit.
Reprinted courtesy of
Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Can General Contractors Make Subcontractors Pay for OSHA Violations?
March 05, 2015 —
Craig Martin – Construction Contractor AdvisorOSHA has long held the opinion that general contractors may be held liable for subcontractor’s OSHA violations and the Eighth Circuit Court of Appeals, overseeing the Midwest, has agreed since 2009. To combat this risk, general contractors would be well served to incorporate targeted indemnity provisions into their subcontracts that require subcontractors to pay for all claims and costs associated with subcontractor caused OSHA violations.
OSHA’s Multi-Employer Policy
OSHA’s Multi-Employer Policy, a/k/a OSHA Instruction CPL 02-00-124, allows OSHA to cite multiple employers at a single worksite for creating a hazard, or for failing to prevent or correct a hazard, even if their own workers are not exposed to the hazard. A ‘‘controlling’’ or ‘‘correcting’’ employer is liable for hazards that it did not take ‘‘reasonable care’’ to detect and prevent.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at