Congratulations to Partners Nicole Whyte, Keith Bremer, Peter Brown, Karen Baytosh, and Associate Matthew Cox for Their Inclusion in 2022 Best Lawyers!
September 13, 2021 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPBremer Whyte Brown & O’Meara, LLP is proud to announce Partners Nicole Whyte, Keith Bremer, Peter Brown, and Karen Baytosh have been selected by their peers for inclusion in the 2022 Edition of The Best Lawyers in America, and Associate Matthew Cox has been included in the Second Edition of Best Lawyers: Ones to Watch. Each person is being recognized for their diligent work in the areas of Family Law, Construction, Commercial, and Personal Injury Litigation.
Best Lawyers is the most respected peer-review publication in the history of the legal profession. Acknowledgment in both The Best Lawyers in America and Best Lawyers: Ones to Watch edition is widely regarded by both clients and legal professionals as a significant honor, bestowed on a lawyer by his or her peers.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
Renovate or Demolish Milwaukee’s Historic City Hall?
July 02, 2014 —
Beverley BevenFlorez-CDJ STAFFMilwaukee, Wisconsin’s City Hall, which according to the New York Times is “one the largest of its kind in the country,” is “slowly sinking.” However, residents are debating whether it is worth the millions to renovate—especially considering that despite $76 million spent in 2006 to restore the building’s exterior, a terra cotta urn fell into the street in 2011 resulting in a lawsuit against the contractor.
The main problem with the building is that “old wooden pilings that support the base of City Hall, timbers anchored deep into the marshy soil more than a hundred years ago, are decaying,” the New York Times reported. “So far, the northeast corner of the aging structure has ‘settled’ 2.16 inches over the past three decades — a small change, but serious enough to raise concerns about the possibility of more structural problems.”
However, proponents of renovation mention the building’s rich history. In 1895 when the City Hall was built, it was “the third-tallest structure in the country at the time, behind the Philadelphia City Hall and the Washington Monument.” The German Renaissance Revival building features a 400-foot clock tower, which “is most fondly remembered for its role in the opening credits of the sitcom ‘Laverne & Shirley.’”
“Buildings like this are salvageable,” Dennis Barthenheier, a contractor who has used concrete to reinforce the pilings of nearly two dozen sinking structures in downtown Milwaukee, told the New York Times. “But it’s not a cheap date.”
Read the court decisionRead the full story...Reprinted courtesy of
Hilti Partners with Canvas, a Construction Robotics Company
April 03, 2023 —
Aarni Heiskanen - AEC BusinessHilti announced a strategic partnership with Canvas, a construction robotics company that has developed a robotic drywalling solution. The partnership allows Canvas to scale globally.
Hilti launched its
Jaibot, the world’s first semi-autonomous ceiling-drilling robot, in 2020. As part of the partnership, Hilti will assume the manufacturing responsibilities for future Canvas systems. They will be based on the Jaibot platform, giving Canvas a reliable and scalable global supply to meet the huge demand for its finishing robots.
The partnering companies share a common vision: that robotic tools will unlock vastly untapped potential and drive a new era of productivity and safety for skilled trade workers.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
A Compilation of Quirky Insurance Claims
August 13, 2014 —
Beverley BevenFlorez-CDJ STAFFProperty Casualty 360 showcased five “nutty claims stories” based upon recollections by several insurance professionals.
Number four, subtitled, “The Case of the Soaked Survivalists,” described a claim by an elderly couple who “made a $350,000 water-damage claim after heavy rains and an inadequate sump pump ruined what they described as thousands of ‘valuable items’ in their storage area.” However, a claims adjuster discovered during the investigation that the area in question was actually a bomb shelter built during the Cold War era, and the so-called valuable items were actually “soap, toothpaste, canned goods, and more.” The insurer ended up settling for about $200,000.
Read the court decisionRead the full story...Reprinted courtesy of
Revisiting the CMO; Are We Overusing the Mediation Privilege?
November 19, 2021 —
Michael T. Kennedy Jr. - BERDING|WEILOne of the most common features in construction defect cases is the Case Management Order (“CMO”) or Pre-Trial Order (“PTO”) to govern pre-trial and mediation procedures. CMOs and PTOs arose in the days when the HOA would sue the developer, the developer would cross-complaint against the subcontractors, and each defendant and cross-defendant might have 2 or 3 insurance carriers defending, each of whom may retain their own panel counsel. In a large case there may have been 20 parties and 30 defense attorneys. In order to avoid the cost and chaos of all of those parties propounding their own discovery, and in order to prepare these cases for mediation well before trial and the associated costs, it became standard practice in California to include provisions in the CMO to stay all discovery until just before trial.
Plaintiff would provide a Defect List or Statement of Claims and the parties experts would meet and exchange information as part of the mediation process. All of the information exchanged would be subject to mediation privileges and inadmissible at trial. The benefit of this practice was that the parties (and carriers) would avoid the cost of formal discovery and allow the experts to discuss compromised scopes of repair to help settle the case while being able to take a more aggressive position at trial. The disadvantages are that each party uses its privileged initial expert reports to stake out negotiating positions more extreme than what they would put on at trial, with each side losing credibility with the other in assessing the value of the case, and for those cases that did not settle, the parties would be faced with having to do all of the depositions and discovery in the last 60 days, or delaying trial, or both.
Over the last 10 or 15 years with the advent of wrap-up insurance policies, these cases now usually involve 2 sides instead of 20; only the HOA and the developer remain in the case. However, old habits die hard, and the standard CMO/PTO hasn’t evolved with other aspects of these cases. The practice of staying all discovery and exchanging information only under mediation privileges remains, and as a result insurance carriers don’t receive the admissible evidence that they need to determine coverage and evaluate the real settlement value of the case until just before trial. On the plaintiff’s side, if most of the experts’ work is done under the guise of mediation privilege, those costs may not be recoverable. Outside the context of mediation, costs incurred in investigation of the defects and preparation of a scope and cost of repair are recoverable.
This reflexive claim of mediation privilege over all information exchanged during the case has outlived its usefulness. The CMO can and should remain to regulate formal discovery and to help the parties prepare for mediation, but regulated discovery should be opened early in the case. In California, the SB800 process already provides for the exchange of admissible information during the prelitigation right to repair process. Continuing that exchange during the early litigation allows the parties to continue to prepare for mediation, but waiving privileges had advantages for both sides.
A senior claims manager once commented that Plaintiff’s mediation-protected Statement of Claims “might as well be a stack of blank paper” for all of its usefulness to the carrier in assessing the value of the case. If the Plaintiff and it expects are free to inflate their claims early in the case without having to worry about every supporting those claims in front of a jury, they have little or no credibility. And if those claims are inflated or not “real,” not only can the carrier not properly assess the verdict range and settlement value of the case, but it may also be hampered in making a coverage determination. Simply put, if the exchange of real information through formal discovery is put off until just before trial, the defense cannot be ready to settle until then. Worse, the cost of defense goes through the roof in the last 60 days before trial as the lawyers’ scramble to take all of the depositions and to all of the other work that had been stayed for the previous year or two.
The Plaintiff is faced with the same question of credibility of defense experts where they are free to take a “low ball” negotiating position without having to support that position through cross-examination in front of the jury. Just as the carrier behind the defense attorney needs the Plaintiff’s “real” evidence to assess the claim, so does the HIOA Board of Directors behind the Plaintiff’s counsel. Additionally, in California as in most states, the cost of experts’ preparation for mediation may not be recoverable as costs or damages, but investigation of the defects and preparation of the scope and cost of repair is recoverable.
The biggest challenge is resolving construction defect claims for both sides is how to resolve these cases quickly while keeping costs under control. Practices that worked 20 years ago are no longer applicable with changes in insurance, and in light of some of the bad habits that arise when all of the information exchanged was confidential.
The CMO/PTO process can still be useful to regulate the discovery and mediation schedule given the volume of documents and other information to be exchanged but exchanging “real” information in a form that may come into evidence at trial should foster earlier resolution, resulting in cost savings for the parties. The CMO can provide for the parties to respond to controlled discovery, and the exchange of expert reports and potentially depositions can and should be done earlier in the case, well before the eve of trial. The parties can then assess the true value of each case and prepare for more substantive mediation without waiting until they are on the figurative courthouse steps.
Construction defect cases have a pattern, and it is tempting for busy lawyers to just put each case through the same algorithms that they have used for years. However, these cases have evolved and those of us handling these cases need to reevaluate our approach to these cases. Taking aggressive negotiating positions that no longer have any credibility with the other side has become counterproductive, and the exchange of real evidence earlier in the case would better serve our clients and carriers.
BERDING|WEIL is the largest and most experienced construction defect and common interest development law firm in California. For more information, please visit https://www.berding-weil.com
Read the court decisionRead the full story...Reprinted courtesy of
Michael T. Kennedy Jr., BERDING|WEILMr. Kennedy may be contacted at
mkennedy@berdingweil.com
White and Williams Celebrates 125th Anniversary
March 04, 2024 —
White and Williams LLPWhite and Williams LLP, a global-reaching law firm headquartered in Philadelphia, PA, is celebrating its 125th Anniversary. Since its founding in 1899, the Firm has grown to two hundred lawyers with offices in Connecticut, Delaware, Maryland, Massachusetts, New Jersey, New York, Rhode Island, and Pennsylvania.
“We are proud to celebrate our 125th anniversary. We are grateful to all of our clients for the trust that they place in our firm to handle their important litigation and transactional matters. The partnership we enjoy with our clients is special and a source of great pride to all of us at White and Williams. We are deeply committed to the success of our clients' goals and objectives,” stated Tim Davis, Managing Partner. “We look forward to celebrating this historic milestone with our clients, attorneys, staff and alumni throughout 2024,” added Davis.
Read the court decisionRead the full story...Reprinted courtesy of
White and Williams LLP
Hawaii Federal District Court Remands Coverage Dispute
June 15, 2020 —
Tred R. Eyerly - Insurance Law HawaiiAccepting the insured's amended complaint, the federal district court of Hawaii remanded the coverage action to state court. Hale v. Lloyd's, London, 2020 U.S. Dist. LEXIS 9061 (D. Haw. Jan. 17, 2020).
Hale purchased a policy for his home in Hilo, Hawaii, from Defendant Pyramid Insurance Centre. The policy was memorialized by a Lloyd's Certificate issued by Defendant Lloyd's. On September 19, 2017, Hale entered Chapter 7 Bankruptcy. Included in the bankruptcy proceeding was Hale's home and a secured home mortgage loan now owned by Defendant Specialized Loan Servicing, LLC. The Bankruptcy Court issued a discharge order on January 18, 2018.
On May 9, 2018, Hale's home was destroyed, being covered with lava from the Kilauea volcano eruption. Hale filed a claim with Lloyd's based upon the loss of his home. The claim was denied. Subsequently, however, Lloyd's issued a check for the full amount of the policy. Both Hale and Specialized Loan were listed as payees on the check.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Insurer Has Duty to Defend Sub-Contractor
July 25, 2022 —
Tred R. Eyerly - Insurance Law HawaiiInterpreting Connecticut law, the federal district court had that the insured sub-contractor was entitled to a defense. County Wide Mech. Servs. LLC v. Regent Ins. Co., 2022 U.S. Dist. LEXIS 86726 (D. Conn. May 13, 2022).
The underlying plaintiff, The Saybrook at Haddam, entered a contract with PAC Group to serve as general contractor for construction of an addition to The Saybrook's facility. PAC Group sub-contracted with County Wide Mechanical Services to install the HVAC system.
The HVAC system was put into service on November 14, 2014. In October 2019, The Saybrook filed the underlying action against PAC group, County Wide, and others. The underlying complaint alleged that there had been at least seven "critical failures" of the HVAC system. As a result, The Seabrook had to replace multiple compressors and several circuit boards, valves, and other components. Further, the entire system had to be replaced. The underlying complaint alleged breach of contract against PAC Group and County Wide. In addition to the alleged breach of contract between The Saybrook and County Wide, the Saybrook also alleged it was a third-party beneficiary of PAC Group's contract with County Wide regarding installation of the HVAC system. PAC Group cross-claimed against County Wide, asserting one count of contractual indemnification and one count of breach of contract under the PAC Group's contract with County Wide.