Force Majeure Under the Coronavirus (COVID-19) Pandemic
March 08, 2021 —
Lindsay T. Watkins - Ahlers Cressman & Sleight PLLCAs COVID-19 disrupts work and life as we know it, the question many contractors have is what protections are available against the inevitable project impacts and delays? Generally, construction contracts require a contractor to timely perform work until project completion or potentially face damages (liquidated or actual) and possible termination. When events occur, however, that are beyond our control (such as a national pandemic), it is important to review and understand what contract provisions or avenues are available for potential relief.
1.
Review Your Contract For A Force Majeure Provision.
A
“force majeure” contract provision is commonly included in construction contracts, service agreements, purchase orders, etc. It typically covers events or conditions that can be neither anticipated nor controlled. These provisions, however, will vary greatly from contract to contract and may not include the language “force majeure” but rather may be included in general delay or impact clauses. For example, some common provisions include:
- Washington State Department of Transportation Clause (2018 Standard Specifications for Road, Bridge and Municipal Construction): The Contractor shall rebuild, repair, restore, and make good all damages to any portion of the permanent or temporary Work occurring before the Physical Completion Date and shall bear all the expense to do so, except damage to the permanent Work caused by: (a) acts of God, such as earthquake, floods, or other cataclysmic phenomenon of nature, or (b) acts of the public enemy or of governmental authorities; or (c) slides in cases where Section 2-03.3(11) is applicable; Provided, however, that these exceptions shall not apply should damages result from the Contractor’s failure to take reasonable precautions or to exercise sound engineering and construction practices in conducting the Work.
Read the court decisionRead the full story...Reprinted courtesy of
Lindsay T. Watkins, Ahlers Cressman & Sleight PLLCMs. Watkins may be contacted at
Lindsay.Watkins@acslawyers.com
Contractor Beware: Design-Build Firms Must Review Washington’s Licensing Requirements
October 16, 2018 —
John Krawczyk - Ahlers Cressman & Sleight PLLCDesign-build contracting is a method of project delivery where the contractor provides both architectural/design and building services to the owner. Yet rarely do firms perform both design and building work in equal measure. Rather, in many instances, firms perform the vast majority of their work on the building side while advertising and providing design services for smaller projects using in-house architects.
Regardless of the volume of design-build contracting a firm performs, any firms practicing this method of project delivery must be aware of Washington State’s registration requirement under RCW 18.08.420(1), and specifically the condition that a “designated architect” must serve as a partner, manager or director of the firm’s governing structure.
Read the court decisionRead the full story...Reprinted courtesy of
John Krawczyk, Ahlers Cressman & Sleight PLLCMr. Krawczyk may be contacted at
john.krawczyk@acslawyers.com
Building Growth Raises Safety Concerns
November 20, 2013 —
CDJ STAFFWith the resurgence of the construction industry, another trend is going up and it’s not good. The workplace fatality rate for the construction industry has increased for the first time since 2006, according to a new report from Marsh Risk Consulting, based on data from the U.S. Bureau of Labor Statistics.
The increase to 9.5 deaths per 100,000 workers is attributed to “an influx of new, inexperienced workers” and that “some contractors are stretching their hiring standards to meet project demands.”
Read the court decisionRead the full story...Reprinted courtesy of
Pandemic-Related Construction Materials Pricing Poses Challenges in Construction Lawsuits
September 20, 2021 —
Nick Stewart - Construction ExecutiveDuring the global pandemic the construction industry saw unprecedented inflation in the cost of building supplies as a result of a myriad of issues. On May 7, 2021, lumber prices hit a record high at $1,670.50 per thousand board feet. This was more than six times their pandemic low in April 2020. This significant price spike was related to closure of sawmills during the height of the pandemic, low supply, soaring demand to expand existing homes or purchase new construction, the western U.S. wildfires and tariffs.
More recently, lumber prices have fallen but they are still up nearly 100% from spring 2020. Some experts believe that the recent wildfires in the western United States and upcoming hurricane season will cause prices to jump back up in the upcoming months.
Additionally, since March 2020, steel prices are up roughly 200%. The increase in steel prices is a result of many of the same factors causing lumber pricing spikes. Many steel mills shut down production or drastically reduced production during the early days of the pandemic expecting a deep recession and/or to comply with restrictive government mandates. Despite these industry expectations, demand for steel -elated products like grills and home appliances soared. These household demands for steel-based products impacted the price of steel for construction projects. Prior to the pandemic, hot-rolled steel traded between $500 and 800 per ton but hit an all-time high of $1,825 per ton in early July 2021.
Reprinted courtesy of
Nick Stewart, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Stewart may be contacted at
nstewart@turnerpadget.com
Funding the Self-Insured Retention (SIR)
August 17, 2020 —
David Adelstein - Florida Construction Legal UpdatesUnlike a deductible, a self-insured retention (referred to an “SIR”) is, as the name suggests, a self-insured obligation of the insured before its insurer picks up coverage. The SIR needs to be exhausted by the insured (as the primary self-insurance component) before the carrier’s excess defense and indemnification obligations kick-in under the terms of the policy. However, an insured can generally exhaust an SIR by paying legal fees and costs associated with a claim.
Oftentimes, the language in the policy requires the SIR to be paid for by the named insured or an insured under the policy. This was an issue addressed by the Florida Supreme Court in Intervest Const. of Jax, Inc. v. General Fidelity Ins. Co., 133 So.3d 494 (Fla. 2014).
In this matter, a personal injury claimant asserted a claim against the contractor dealing with a residential home. The contractor hired a subcontractor to install attic stairs and the subcontract required the contractor to indemnify it. The owner of the house injured herself on the attic stairs and sued the contractor. The contractor, in turn, sought indemnification against the subcontractor that installed the attic stairs.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Safe Harbors- not just for Sailors anymore (or, why advance planning can prevent claims of defective plans & specs) (law note)
August 17, 2011 —
Melissa Brumback, Construction Law in North CarolinaHave you ever considered a “Safe Harbor Provision” for your Owner-Architect or Owner-Engineer contract? Maybe it is time that you do.
As you are (probably too well) aware, on every construction project there are changes. Some of these are due to the owner’s change of heart, value engineering concerns, contractor failures, and material substitutions. Some may be because of a design error, omission, or drawing conflict. It happens.
A “Safe Harbor Provision” is a provision that establishes an acceptable percentage of increased construction costs (that is, a percentage of the project’s contingency). The idea is that if the construction changes attributable to the designer is within this percentage, no claim will be made by the Owner for design defects.
Read the full story…
Reprinted courtesy of Melissa Brumback of Ragsdale Liggett PLLC. Ms. Brumback can be contacted at mbrumback@rl-law.com.
Read the court decisionRead the full story...Reprinted courtesy of
The Hidden Dangers of Construction Defect Litigation
March 28, 2012 —
David M. McLain, Colorado Construction LitigationDavid M. McLain, writing at Colorado Construction Litigation, has an interesting blog post republishing his article in Common Interests magazine, the monthly periodical of the Rocky Mountain Chapter of the Community Associations Institute. In his article, he touches on a number of pitfalls in construction defect litigation, including the potential conflicts of interests facing HOAs. He also considers the problems homeowners can face, including both “strong-arm tactics” taken by attorneys to compel homeowners to join the lawsuit, or situations in which the interests of the HOA do not match those of the homeowners. He writes:
There is also a conflict of interest with individual owners who attempt to opt out of the case. This can lead to shocking strong-arm tactics on the part of plaintiffs’ attorneys. In one instance, a plaintiffs’ attorney sent a letter to an individual homeowner that stated that as a 1/58th owner of the common elements, if he refused to go along with the suit, and there was ultimately a finding in favor of the HOA which was in any way limited by his refusal to participate, he would be personally liable for 1/58th of the HOA’s total damages. In another instance, a different plaintiffs’ attorney sent a letter to a homeowner who wanted the builder to perform warranty repairs, informing the owner that if he let the builder perform any repairs, the attorney would bill the HOA according to the fee agreement entered by the HOA board (without knowledge or consent of non-board members) and that the HOA would assess the homeowner for that expense. These are just two examples of conflicts which may arise between the HOA board and individual homeowners when the HOA pursues CD cases.
Another example of a conflict which will arise as a result of CD litigation occurs post-settlement. When an HOA settles for less than 100% of the amount necessary to fund all repairs outlined by its experts, plus attorneys’ fees and litigation costs, there will obviously be a shortfall in the amount necessary to fix the development. The HOA board must then choose to impose a special assessment to cover the shortfall or to make some, but not all, of the repairs outlined by its experts. In choosing the latter, the conflict arises with respect to which homes get fixed and which do not. In this situation, the HOA board has acted as the attorney-in-fact for the individual owners by bringing claims on their behalf, and has compromised those claims without their knowledge or consent.
Read the full story…
Reprinted courtesy of David M. McLain of Higgins, Hopkins, McClain & Roswell, LLC. Mr. McClain can be contacted at mclain@hhmrlaw.com.
Read the court decisionRead the full story...Reprinted courtesy of
Duty to Defend Construction Defect Case Triggered by Complaint's Allegations
August 20, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe subcontractor's insurer could not escape contributing to defense costs of its insured when coverage was possible based upon the underlying complaint's allegations. Seneca Ins. Co. v. James River Ins. Co., 2014 U.S. Dist. LEXIS 97156 (D. Ore. July 17, 2014).
The underlying action alleged construction defects in a 60-unit complex located in Seaside, Oregon. S.D. Deacon Corp. was the general contractor and contracted with the owners association to reconstruct portions of the building, including the curtain wall. Deacon subcontracted with Superwall Design, LLP for work on the curtain wall renovation.
At some point not specified in the underlying complaint, the Association notified Deacon of construction defects in the curtain wall renovation. Deacon investigated and concluded that the alleged property damage was the result of inadequate usage of materials, violations of state and local building codes, and violations of relevant industry standards relating to the work performed by Superwall. Deacon contended that the problems were caused by Superwall's faulty workmanship.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com