BERT HOWE
  • Nationwide: (800) 482-1822    
    hospital construction building expert Seattle Washington condominiums building expert Seattle Washington production housing building expert Seattle Washington Subterranean parking building expert Seattle Washington high-rise construction building expert Seattle Washington townhome construction building expert Seattle Washington multi family housing building expert Seattle Washington industrial building building expert Seattle Washington condominium building expert Seattle Washington office building building expert Seattle Washington casino resort building expert Seattle Washington custom homes building expert Seattle Washington retail construction building expert Seattle Washington housing building expert Seattle Washington parking structure building expert Seattle Washington low-income housing building expert Seattle Washington Medical building building expert Seattle Washington custom home building expert Seattle Washington structural steel construction building expert Seattle Washington landscaping construction building expert Seattle Washington tract home building expert Seattle Washington institutional building building expert Seattle Washington
    Seattle Washington architect expert witnessSeattle Washington building envelope expert witnessSeattle Washington building consultant expertSeattle Washington stucco expert witnessSeattle Washington structural concrete expertSeattle Washington consulting architect expert witnessSeattle Washington roofing construction expert
    Arrange No Cost Consultation
    Building Expert Builders Information
    Seattle, Washington

    Washington Builders Right To Repair Current Law Summary:

    Current Law Summary: (SB 5536) The legislature passed a contractor protection bill that reduces contractors' exposure to lawsuits to six years from 12, and gives builders seven "affirmative defenses" to counter defect complaints from homeowners. Claimant must provide notice no later than 45 days before filing action; within 21 days of notice of claim, "construction professional" must serve response; claimant must accept or reject inspection proposal or settlement offer within 30 days; within 14 days following inspection, construction pro must serve written offer to remedy/compromise/settle; claimant can reject all offers; statutes of limitations are tolled until 60 days after period of time during which filing of action is barred under section 3 of the act. This law applies to single-family dwellings and condos.


    Building Expert Contractors Licensing
    Guidelines Seattle Washington

    A license is required for plumbing, and electrical trades. Businesses must register with the Secretary of State.


    Building Expert Contractors Building Industry
    Association Directory
    MBuilders Association of King & Snohomish Counties
    Local # 4955
    335 116th Ave SE
    Bellevue, WA 98004

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Kitsap County
    Local # 4944
    5251 Auto Ctr Way
    Bremerton, WA 98312

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Spokane
    Local # 4966
    5813 E 4th Ave Ste 201
    Spokane, WA 99212

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of North Central
    Local # 4957
    PO Box 2065
    Wenatchee, WA 98801

    Seattle Washington Building Expert 10/ 10

    MBuilders Association of Pierce County
    Local # 4977
    PO Box 1913 Suite 301
    Tacoma, WA 98401

    Seattle Washington Building Expert 10/ 10

    North Peninsula Builders Association
    Local # 4927
    PO Box 748
    Port Angeles, WA 98362
    Seattle Washington Building Expert 10/ 10

    Jefferson County Home Builders Association
    Local # 4947
    PO Box 1399
    Port Hadlock, WA 98339

    Seattle Washington Building Expert 10/ 10


    Building Expert News and Information
    For Seattle Washington


    Colorado’s Need for Condos May Spark Construction Defect Law Reform

    No Coverage For Construction Defects Under Alabama Law

    2018 Super Bowl US. Bank Stadium in Minneapolis

    Biden’s Solar Plans Run Into a Chinese Wall

    The Anatomy of a Construction Dispute Stage 3- The Last Straw

    OSHA Updates: New Submission Requirements for Injury and Illness Records

    Waiver of Subrogation Enforced, Denying Insurers Recovery Against Additional Insured in $500 Million Off-Shore Oil Rig Loss

    Court of Appeals Expands Application of Construction Statute of Repose

    COVID-19 Likely No Longer Covered Under Force Majeure

    What is the Implied Warranty of Habitability?

    State Farm Too Quick To Deny Coverage, Court Rules

    BWB&O Partner Tyler Offenhauser and Associate Lizbeth Lopez Won Their Motion for Summary Judgment Based on the Privette Doctrine

    Iowa Tornado Flattens Homes, Businesses and Wind Turbines

    Fifth Circuit Holds Insurer Owes Duty to Defend Latent Condition Claim That Caused Fire Damage to Property Years After Construction Work

    Super Lawyers Recognized Five Lawyers from Hunton’s Insurance Recovery Group

    A Primer on Suspension and Debarment for Federal Construction Projects

    New York’s 2022 Comprehensive Insurance Disclosure Act: Significant Amendments to the C.P.L.R.

    Jarred Reed Named to the National Black Lawyers’ “Top 40 Under 40” List for Second Consecutive Year

    Expect the Unexpected (Your Design Contracts in a Post-COVID World)

    White House Proposal Returns to 1978 NEPA Review Procedures

    Happenings in and around the 2015 West Coast Casualty Seminar

    Subcontractors Found Liable to Reimburse Insurer Defense Costs in Equitable Subrogation Action

    ICE Said to Seek Mortgage Role Through Talks With Data Service

    Third Circuit Vacates Judgment for Insurer on Alleged Construction Defect Claim

    Construction Employment Rose in 38 States from 2013 to 2014

    Is Everybody Single? More Than Half the U.S. Now, Up From 37% in '76

    New Jersey Supreme Court Holding Impacts Allocation of Damages in Cases Involving Successive Tortfeasors

    Champagne Wishes and Caviar Dreams. Unlicensed Contractor Takes the Cake

    Tejon Ranch Co. Announces Settlement of Litigation Related to the Tejon Ranch Conservation and Land Use Agreement

    Valerie A. Moore and Christopher Kendrick are JD Supra’s 2020 Readers’ Choice Award Recipients

    Arizona Supreme Court Confirms Eight-Year Limit on Construction Defect Lawsuits

    Security on Large Construction Projects. The Payment Remedy You Probably Never Heard of

    One Way Arbitration Provisions are Enforceable in Virginia

    Review the Terms and Conditions of Purchase Orders- They Could be Important!

    Governmental Immunity Waived for Independent Contractor - Lopez v. City of Grand Junction

    Federal Court Holds That Other Insurance Analysis Is Unnecessary If Policies Cover Different Risks

    Although Property Damage Arises From An Occurrence, Coverage Barred By Business Risk Exclusions

    Read Carefully. The Insurance Coverage You Thought You Were Getting May Not Be The Coverage You Got

    Navigating the Hurdles of Florida Construction Defect Lawsuits

    Rights Afforded to Employees and Employers During Strikes

    Insurance Policy Provides No Coverage For Slab Collapse in Vision One

    "Ordinance or Law" Provision Mandates Coverage for Roof Repair

    New York Climate Mobilization Act Update: Reducing Carbon Emissions and Funding Solutions

    Hovnanian Increases Construction Defect Reserves for 2012

    Update Regarding McMillin Albany LLC v. Super Ct.

    Construction Warranties: Have You Seen Me Lately?

    ¡AI Caramba!

    WSHB Expands into the Southeast

    LA Blazes Bolster Case for Wildfire-Tech Investment, VC Clerico Says

    Coverage for Injury to Insured’s Employee Not Covered
    Corporate Profile

    SEATTLE WASHINGTON BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 7,000 construction defect and claims related expert witness designations, the Seattle, Washington Building Expert Group provides a wide range of trial support and consulting services to Seattle's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.

    Building Expert News & Info
    Seattle, Washington

    Florida Enacts Property Insurance Overhaul for Benefit of Policyholders

    July 05, 2023 —
    Fort Lauderdale, Fla. (June 13, 2023) – On June 1, 2023, Governor Ron DeSantis signed into law CS/SB 7052 (the Act), increasing consumer protection and insurer accountability in Florida. The newly enacted and amended statutes under CS/SB 7052 bolster policyholder protections and impose greater insurer oversight, including heightened penalties for insurer misdeeds in the state under a new law that will take effect on July 1, 2023 (this legal alert does not address all of the statutory revisions associated with the Act). As House Speaker Paul Renner noted, “The insurance legislation signed by Governor DeSantis today . . . not only empowers homeowners, but also cultivates market-driven competition, ultimately leading to lower costs.” Statutory Revisions Regarding Insurance Coverage The Act prohibits authorized insurers from cancelling or nonrenewing a property insurance policy for a residential property or dwelling that was damaged by any covered peril until the earlier of: (a) when the property has been repaired; or (b) one year after the insurer issues the final claim payment. The Act also expands current law prohibiting authorized insurers from cancelling or nonrenewing a residential property insurance policy until 90 days after repairs are completed for damages resulting from a hurricane or wind loss that is the subject of a state of emergency declared by the Governor and for which the Office of Insurance Regulation (OIR) has issued an emergency order. See Fla. Stat. §627.4133(2)(d)(1)(a) and (b) (Notice of cancellation, nonrenewal, or renewal premium). Reprinted courtesy of Laura Farrant, Lewis Brisbois and Bradley S. Fischer, Lewis Brisbois Ms. Farrant may be contacted at Laura.Farrant@lewisbrisbois.com Mr. Fischer may be contacted at Bradley.Fischer@lewisbrisbois.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    HOA Coalition Statement on Construction-Defects Transparency Legislation

    May 12, 2016 —
    FOR IMMEDIATE RELEASE Contact: Bill Ray / 303-885-1881 DENVER—The Homeownership Opportunity Alliance—a broad coalition of business groups, builders, elected officials and affordable housing advocates—provided the following statements on reports that there will be no construction-defects transparency legislation this session: “We are disappointed that negotiations broke down today and that event was immediately turned into an effort to use the media to score political points. The Homeownership Opportunity Alliance has worked on this issue for three years, and we are committed to finding a resolution that will address Colorado’s housing needs, especially through the development of attainable condominiums,” said Tom Clark, Chief Executive Officer of the Metro Denver Economic Development Corporation. “We understand the importance of this issue for our state, for working families, for first-time homebuyers and for anyone along the housing spectrum who is struggling to find a home. That's why we will remain committed to working on this issue.” The Homeownership Opportunity Alliance’s diverse coalition includes more than 50 organizations from across Colorado. The coalition also includes individual mayors and 14 different communities that have passed local ordinances to address attainable condominium development. Read the court decision
    Read the full story...
    Reprinted courtesy of David M. McClain, Higgins, Hopkins, McLain & Roswell, LLC
    Mr. McClain may be contacted at mclain@hhmrlaw.com

    Will a Notice of Non-Responsibility Prevent Enforcement of a California Mechanics Lien?

    March 05, 2015 —
    The “Notice of Non-Responsibility” is one of the most misunderstood and ineffectively used of all the legal tools available to property owners in California construction law. As a result, in most cases the answer to the above question is “No”, the posting and recording of a Notice of Completion will not prevent enforcement of a California Mechanics Lien. The mechanics lien is a tool used by a claimant who has not been paid for performing work or supplying materials to a construction project. It provides the claimant the right to encumber the property where the work was performed and thereafter sell the property in order to obtain payment for the work or materials, even though the claimant had no contract directly with the property owner. When properly used, a Notice of Non-Responsibility will render a mechanics lien unenforceable against the property where the construction work was performed. By derailing the mechanics lien the owner protects his property from a mechanics lien foreclosure sale. Unfortunately, owners often misunderstand when they can and cannot effectively use a Notice of Non-Responsibility. As a result, the Notice of Non-Responsibility is usually ineffective in protecting the owner and his property. The rules for the use of the Notice of Non-Responsibility are found in California Civil Code section 8444. Deceptively simple, the rules essentially state that an owner “that did not contract for the work of improvement”, within 10 days after the owner first “has knowledge of the work of improvement”, may fill out the necessary legal form for a Notice of Non-Responsibility and post that form at the worksite and record it with the local County Recorder in order to prevent enforcement of a later mechanics lien on the property. What commonly occurs however is that early in the process the owner authorizes or even requires its tenant to perform beneficial tenant improvements on the property. This authorization is often set forth in a tenant lease or other written document. The dispositive factor for determining whether the Notice of Non-Responsibility will be enforceable though is that the owner knows that these improvements will be made to the property and intends that they be made, usually long before the work begins. Indeed, the owner has usually negotiated these very terms into the lease contract. The owner then mistakenly believes that once work on the property commences it has 10 days to post and record a Notice of Non-Responsibility and thereby protect itself from a mechanics lien. The usual error is two-fold. First, the statute states that the Notice is available when the owner “did not contract for the work of improvement”. The fact though is that the owner did contract for the work of improvement. It did so through the lease contract. This is true even though the owner’s contract was not with the contractor or supplier directly. Secondly, the 10 day period to post and record the Notice begins when the owner first “has knowledge” of the work of improvement. This knowledge was of course gained when the lease was negotiated and signed, providing knowledge typically many days before the work has begun. Thus, the 10 day period can also seldom be met. The Notice of Non-Responsibility will therefore fail both rules because the owner has in fact contracted for the improvement and because he does not act within 10 days of gaining this knowledge. The next event in the typical scenario occurs when the tenant does not pay its contractor. The contractor then has nothing to pay its subcontractors. Material suppliers also go unpaid. Mechanics liens are then recorded by the unpaid claimants, followed by foreclosure actions within ninety days thereafter. Owners will typically point to the Notice of Non-Responsibility they posted and recorded, claiming its protection. Claimants then in turn point to the lease or other evidence that the owner knew of the pending improvements and contracted in some way that the improvements be performed, often also more than 10 days before they posted the Notice. Judges generally agree with the unpaid mechanics lien claimants and the Notice of Non-Responsibility is deemed ineffective. The fact that the Court does not enforce the Notice of Non-Responsibility under these circumstances is not an unfair result. Since the owner authorized the work to be performed and it received a substantial benefit in the form of those improvements, it is not unfair that the owner should pay for those benefits. It would be inequitable for the owner to obtain the benefit of the improvements which it authorized but for which it did not pay, while allowing those who provided the benefit to go unpaid. Moreover, without such a system in place the door would be open to owners setting up sham “tenants” who would enter into contracts to have work performed, only to disappear when the work is completed, leaving the contractor without a source of payment. The system in place as described above prevents such duplicity. Owners would do well to arm themselves with proper knowledge of when the Notice of Non-Responsibility will and will not protect them and then responsibly use the Notice of Non-Responsibility. For the legal eagles among you, the following cases illustrate the view of the courts, consistent with the above: Baker v. Hubbard (1980) 101 Cal.App.3d 226; Ott Hardware v. Yost (1945) 69 Cal. App.2d 593 (lease terms); Los Banos Gravel Co. v. Freeman (1976) 58 Cal.App.3d 785 (common interest); Howard S. Wright Construction Co. v. Superior Court (2003); 106 Cal.App.4th 314 (participating owner). William L. Porter of Porter Law Group, Inc. located in Sacramento, California may be contacted at (916) 381-7868 or bporter@porterlaw.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Blog Completes Seventeenth Year

    January 07, 2025 —
    Insurance Law Hawaii reaches the end of its seventeenth year this month. We began posting long ago, in December 2007. We seek to keep readers apprised of developments in insurance-related cases from Hawaii and across the country. Coverage issues surrounding the Maui fires have been top of mind this year. We will continue posting on important coverage developments in the next year. Read the court decision
    Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    A License to Sue: Appellate Court Upholds Condition of Statute that a Contracting Party Must Hold a Valid Contractor’s License to Pursue Action for Recovery of Payment for Contracting Services

    June 21, 2017 —
    California Business & Professions Code section 7031(a) requires a party to have contractor’s license in order to maintain an action for compensation for services performed for which a contractor’s license is needed. In Phoenix Mechanical Pipeline, Inc. v. Space Exploration Technologies Corp., No. B269186 (2017 WL 2544856) (Cal. Ct. App. June 13, 2017), the Court of Appeal for the Second Appellate District considered the scope of this statute in denying, in part, Phoenix Mechanical Pipeline, Inc.’s (“Phoenix Pipeline”) appeal of a trial court ruling granting Space Exploration Technologies Corporation’s (“SpaceX”) demurrer to Phoenix Pipeline’s second amended complaint, without leave to amend. Phoenix Pipeline filed the underlying lawsuit for, among other claims, breach of contract and breach of the duty of good faith and fair dealing arising from an agreement with SpaceX for Phoenix Pipeline to perform various plumbing, concrete removal and electrical services. Phoenix Pipeline alleged SpaceX paid for such services from 2010 to October 2013, but failed to pay Phoenix for services performed from October 2013 to August 2014, totaling just over $1,000,000. According to Phoenix Pipeline, this work was performed pursuant to a series of invoices, which constituted individual agreements between SpaceX and Phoenix Pipeline. Reprinted courtesy of Omar Parra, Haight Brown & Bonesteel LLP and Jesse M. Sullivan, Haight Brown & Bonesteel LLP Mr. Parra may be contacted at oparra@hbblaw.com Mr. Sullivan may be contacted at jsullivan@hbblaw.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    “To Indemnify, or Not to Indemnify, that is the Question: California Court of Appeal Addresses Active Negligence in Indemnity Provisions”

    April 05, 2017 —
    In California, it is well-established that the extent of a party’s obligation under an indemnity agreement is an issue of contractual interpretation, and it is therefore the intent of the parties that should control. What is the parties’ intent, then, when a subcontractor (indemnitor) agrees to indemnify the general contractor (indemnitee) “except to the extent the claims arise out of the general contractor’s active negligence or willful misconduct”? Does this mean the general contractor is barred entirely from recovering any indemnity if its active negligence contributed to the injury? Not according to the First Appellate District of the California Court of Appeal, which recently held that an actively negligent general contractor may still recover indemnity for the portion of liability attributable to the fault of others. Oltmans Construction Co. v. Bayside Interiors, Inc., No. A147313, 2017 WL 1179391, at *1 (Cal. Ct. App. Mar. 30, 2017). In Oltmans Construction, an employee of O’Donnell Plastering, Inc. (“O’Donnell”), a sub-subcontractor of Bayside Interiors, Inc. (“Bayside”), which was a subcontractor to Oltmans Construction Company (“Oltmans”), sustained injuries when he fell through a skylight opening in the roof of a building under construction. The employee filed suit against Bayside, Oltmans, and the building’s owner, arguing Oltmans negligently cut and left unsecured the skylight opening. Oltmans subsequently filed a Cross-Complaint against Bayside and O’Donnell, contending it was entitled to indemnification under the governing agreements. Reprinted courtesy of Steven M. Cvitanovic, Haight Brown & Bonesteel LLP and Omar Parra, Haight Brown & Bonesteel LLP Mr. Cvitanovic may be contacted at scvitanovic@hbblaw.com Mr. Parra may be contacted at oparra@hbblaw.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    The Law Clinic Paves Way to the Digitalization of Built Environment Processes

    February 11, 2019 —
    The Law Clinic offers legal advice on digitalization to built environment innovators and experimenters and in the process helps lawmakers find the pain points in legislation. In April 2018 the Finnish Ministry of the Environment launched an experimental legal service for real estate and construction professionals, municipalities, and lawmakers. The cost-free service is like a helpdesk for anyone who has questions about real estate and construction laws and regulations and their interpretation as it applies to new digital processes. The Law Clinic is part of the national KIRA-digi project, which includes 138 experiments, many of which need legal advice for their execution. Read the court decision
    Read the full story...
    Reprinted courtesy of Aarni Heiskanen, AEC Business
    Mr. Heiskanen may be contacted at aec-business@aepartners.fi

    Court Upholds $68M Jury Award Over 2021 Fatal Fall in Philadelphia

    January 28, 2025 —
    A Pennsylvania Supreme Court judge has reaffirmed a $68.5-million jury verdict in a wrongful death case brought by the wife and child of an immigrant siding-installation worker who fell to his death while working on a small Philadelphia apartment project in late 2021. Read the court decision
    Read the full story...
    Reprinted courtesy of Richard Korman, Engineering News-Record