Georgia Supreme Court Addresses Anti-Indemnity Statute
October 21, 2019 —
David R. Cook - AHC Construction and Procurement BlogIn prior blog posts, we addressed Georgia’s anti-indemnity statute. One of the posts addressed the statute in the context of an electric utility easement near an airport. That case made its way to the Supreme Court Georgia, which provided some additional clarity to the statute. Milliken & Co. v. Georgia Power Co., — Ga. –, 829 S.E.2d 111 (2019).
When a plane crashed and several passengers and crew died or were injured, their representatives sued several defendants, including a nearby plant owner, Milliken & Company (“Milliken”), based on claims that transmission lines on Milliken’s property were too close to the runways, were too high, and encroached on the airport easements. Milliken cross claimed against Georgia Power Company (“GPC”). Milliken’s claim was based on an easement it granted to GPC, which required GPC to indemnify it for any claims arising out of GPC’s construction or maintenance of the transmission lines.
On appeal, the Supreme Court considered whether the clause was unenforceable under O.C.G.A. § 13-8-2(b). In general, “a party may contract away liability to the other party for the consequences of his own negligence without contravening public policy, except when such agreement it prohibited by statute.” Id. at 113 citing Lanier at McEver v. Planners & Eng’rs Collaborative, 284 Ga. 204, 205 (2008). As one such statute, O.C.G.A. § 13-8-2(b) applies when an indemnification provision (i) “relates in some way to a contract for construction, alteration, repair, or maintenance of certain property” and (ii) “promises to indemnify a party for damages arising from that own party’s sole negligence.” Id. at 114 (internal punctuation omitted).
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook, Autry, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
Ohio Supreme Court Rules That Wrongful Death Claims Are Subject to the Four-Year Statute of Repose for Medical Claims
January 16, 2024 —
Lewis Brisbois NewsroomCleveland, Ohio (January 2, 2024) - In a landmark 4-3 ruling, the Supreme Court of Ohio ruled on December 28 that wrongful death claims are subject to the four-year statute of repose contained in O.R.C. 2305.113(C) (“Medical Claim Statute of Repose”). Everhart v. Coshocton County Memorial Hospital, Slip No. 2023-Ohio-4670. Statutes of repose create an absolute bar to filing a lawsuit. When applicable, they bar plaintiffs from filing claims outside a specified time frame. The Medical Claim Statute of Repose creates a four-year window for commencing medical claims, which begins to run from “the occurrence of the act or omission constituting the alleged basis of the medical…claim.” O.R.C. 2305.113(C)(1). Medical claims commenced after the four-year period are barred.
The primary question before the Court was whether a wrongful death claim, which is separate and distinct from a medical negligence claim, can qualify as a “medical claim” within the context of the Medical Claim Statute of Repose. The Court answered in the affirmative. A wrongful death claim can qualify as a medical claim if the wrongful death claim “…arises out the medical diagnosis, care, or treatment, of any person.” O.R.C. 2305.113(E)(3). According to the majority, a wrongful death claim can fall within the broad definition of “medical claim” and, if it does, is subject to the Medical Claim Statute of Repose.
Read the court decisionRead the full story...Reprinted courtesy of
Lewis Brisbois
Even with LEED, Clear Specifications and Proper Documentation are Necessary
December 31, 2014 —
Christopher G. Hill – Construction Law MusingsA recent lawsuit filed in California over the proper documentation necessary for LEED certification (discussed in detail at the Green Building Law Update) emphasizes the fact that, no matter how detailed the LEED certification process seems to be, a mere reference to that process or a certain level of LEED certification is far from sufficient to assure a smooth project.
While I don’t practice in California and don’t have any idea how the lawsuit will turn out, the fact that there is litigation over even the basics of LEED like documentation shows the clear necessity to make sure that your specifications and contract documents are specific and clear from the beginning. Owners, General Contractors and Subcontractors need to remember this fact at all times and particularly in situations where, like in the instance of LEED, the “specification” seems to be set out by others.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, Law Office of Christopher G. Hill, PCMr. Hill may be contacted at
chrisghill@constructionlawva.com
South Carolina Supreme Court Finds that Consequential Damage Arise From "Occurrence"
October 10, 2013 —
Tred Eyerly — Insurance Law HawaiiThe South Carolina Supreme Court held that continuing damage that was part of a continuum of property damage constituted an "occurrence." Auto-Owners Ins. Co. v. Rhodes, 2013 S.C. LEXIS 248 (Sept. 25, 2013).
Rhodes hired Eadon to design, fabricate, and erect three outdoor advertising signs on Rhodes' property bordering an interstate highway. After the signs were erected, one fell across the highway, blocking both lanes of southbound traffic. The state Department of Transportation ordered Rhodes to remove the remaining two signs and revoked Rhodes' permit to maintain signs on the property.
Rhodes sued Eaton. Eaton's insurer, Auto-Owners, filed a declaratory judgment action to determine whether there was coverage under the CGL policy. The trial court found the sign falling on the interstate constituted an "occurrence" that resulted in damages beyond the defective work to property other than the defective work itself.
Read the court decisionRead the full story...Reprinted courtesy of
Tred EyerlyTred Eyerly can be contacted at
te@hawaiilawyer.com
Breach of an Oral Contract and Unjust Enrichment and Implied Covenant of Good Faith and Fair Dealing
December 23, 2023 —
David Adelstein - Florida Construction Legal UpdatesIn an ideal world, parties would have written contracts. In reality, parties should endeavor to ensure every transaction they enter into is memorialized in a written contract. This should not be disputed. Of course, written contracts are not always the case. Parties enter transactions too often whereby the transaction is not memorialized in a clean written agreement. Rather, it is piecemealing invoices, or texts, or discussions, or proposals and the course of business. A contract can still exist in this context but it is likely an oral contract. Keep in mind if there is a dispute, what you think the oral contract says will invariably be different than what the other party believes the oral contract says. This “he said she said” scenario gets removed, for the most part, with a written contract that memorializes the written terms, conditions, and scope.
A recent federal district court opinion dealt with the alleged breach of an oral contract. In Movie Prop Rentals LLC vs. The Kingdom of God Global Church, 2023 WL 8275922 (S.D.Fla. 2023), a dispute concerned the fabrication and installation of a complex, modular stage prop to be used for an event. But here lies the problem. The dispute was based on an oral contract and invoices. The plaintiff, the party that was fabricating the modular stage prop, sued the defendant, the party that ordered the stage prop for the event, for non-payment under various claims. The defendant countersued under various claims.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Colorado Rejects Bill to Shorten Statute of Repose
May 07, 2015 —
Jesse Howard Witt – Acerbic WittThe House State, Veterans, and Military Affairs committee voted today to postpone Senate Bill 15-091 indefinitely, effectively killing the bill for the 2015 session.
As originally drafted, the bill would have given Colorado the shortest statute of repose in the United States. Senate amendments softened the impact of the bill somewhat, but it still would have reduced the amount of time that the owners of single-family homes would have to discover construction defects. Proponents argued that this was necessary because Colorado’s harsh weather conditions make it difficult for construction to last longer than five years. Opponents countered that construction defect laws only provide relief when a builder has violated a code or standard, which is unrelated to the expected lifespan of a product.
One of the Representatives noted that states like Alaska have much harsher weather patterns yet allow homeowners to bring claims up to ten years after construction is complete. Another questioned whether the bill would do anything to encourage affordable housing, a topic that has generated substantial media attention in recent months.
Read the court decisionRead the full story...Reprinted courtesy of
Jesse Howard Witt, Acerbic WittMr. Witt welcomes comments at www.wittlawfirm.net
Planned Everglades Reservoir at Center of Spat Between Fla.'s Gov.-Elect, Water Management District
January 02, 2019 —
Miami Herald - Engineering News-RecordDec. 11 -- Florida's incoming governor stopped short of demanding South Florida water managers step down over a contentious land deal with sugar farmers, saying he would instead await a recommendation from his transition team. That doesn't mean their days may not be numbered.
Read the court decisionRead the full story...Reprinted courtesy of
Engineering News-RecordENR may be contacted at
ENR.com@bnpmedia.com
The Advantages of Virtual Reality in Construction
August 20, 2019 —
Spivey Lipsey - Construction ExecutiveVirtual realty provides an unparalleled spatial sense for visualization at a lower cost than full-scale replicas. Today, VR is being used heavily in preconstruction to align owner expectations and educate design team stakeholders. For those already employing BIM solutions, coordination can be made much more effective by leveraging existing design models with very little added cost.
As anyone who has tried a VR headset before can attest, the ability to accurately perceive spatial relationships in design cannot be replicated through traditional 2D media such as screens or paper. VR solutions also have the ability to iterate rapidly. These technologies are linked to BIM, providing real-time feedback as the design changes. This is in stark contrast to traditional full-scale mockups and offline renders, which are cumbersome and time-consuming to update with design changes.
Substantial benefits without a hefty price tag
Budget limitations and ROI are always a concern with emerging technology. Fortunately, VR comes cheaply with BIM production. These solutions are significantly less expensive than full-scale mockups and far more efficient when compared to longhand sequencing explanations and esoteric detailing of complex designs. Even the most elaborate VR setups are a fraction of overall construction cost, ranging from a few hundred to a few thousand dollars depending on the level of adoption.
Reprinted courtesy of
Spivey Lipsey, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of