California Court of Appeal Adopts Horizontal Exhaustion Rule
June 28, 2013 —
Tred Eyerly, Insurance Law HawaiiIn a long running suit regarding thousands of asbestos bodily injury claims brought against Kaiser Cement and Gypsum Corporation, the California appellate court held that the excess carrier's indemnity obligation did not attach until all collectible primary policies were exhausted. Kaiser Cement and Gypsum Corp. v. Ins. Co. of the State of Pennsylvania, 215 Cal. App.4th 210 (Cal. Ct. App. April 8, 2013).
Kaiser manufactured a variety of asbestos-containing products from 1944 through the 1970's. Truck Insurance Company provided primary insurance to Kaiser from 1964 to 1983, through four CGL policies covering 19 annual policy periods. The policy in effect from 1974 to 1981 contained a $500,000 "per occurrence" liability limit. Kaiser was insured by three other primary carriers between 1947 and 1987. ICSOP issued a first layer excess policy to Kaiser from 1974 through 1976.
Kaiser tendered numerous claims for bodily injury to Truck. By October 2004, Truck's indemnity payments exceeded $50 million and included at least 39 claims that resulted in payments in excess of $500,000. For claims alleging bodily injury in 1974, Kaiser selected Truck's 1974 policy to respond to each of the claims.
Read the court decisionRead the full story...Reprinted courtesy of
Tred EyerlyTred Eyerly can be contacted at
te@hawaiilawyer.com
Subcontractors Have a Duty to Clarify Ambiguities in Bid Documents
August 19, 2015 —
Craig Martin – Construction Contractor AdvisorSeveral months ago, I wrote about an escalator subcontractor that sued a general contractor, demanding payment for work completed based on approved shop drawings. The trial court agreed with the subcontractor, but the general contractor appealed. Ten months later, the Court of Appeals reversed, finding that the subcontractor had a duty to bring to the general contractor’s attention major discrepancies or errors they detect in the bid documents.
“The subcontractor failed to disclose ambiguities in the plans and must suffer the peril.”
Construction Difficulties
The subcontractor installed 32 inch escalators throughout the project, but the plans called for 40 inch escalators. The general contractor and subcontractor could not reach agreement on how the dispute should be resolved. The subcontractor sued the general to get paid for replacing the escalators and the general sued to subcontractor for concessions it had to pay to the owner.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at
cmartin@ldmlaw.com
Surety’s Several Liability Under Bonds
March 20, 2023 —
David Adelstein - Florida Construction Legal UpdatesWhen a payment or performance bond is issued on behalf of its bond-principal, the surety is jointly and severally liable with its bond-principal. This means the surety has several liability under the bond, i.e., you don’t need to pursue the principal of the bond to pursue liability under the bond, which is a separate written intrument. Thus, if you are claiming damages of $500,000, by way of example, you can sue both the principal and surety under the bond, you can ONLY sue the principal under the bond (which is rarely practical), or you can ONLY sue the surety under the bond (which, oftentimes, is very practical). In many instances where I am pursuing a bond claim on behalf of a client, particularly a payment bond claim, I only sue the surety and do not sue the bond-principal unless there are certain strategic reasons in doing so. This is because of the surety’s several liability under the bond and there may be solvency issues with the principal or contractual reasons that, strategically, make much more sense to exclude the principal from the action.
In MJM Electric, Inc. v. National Union Fire Ins. Co. of Pittsburgh, PA, 2023 WL 2163087 (M.D.Fla. 2023), an electrical subcontractor was hired to perform electrical work by the prime contractor. The prime contractor had a payment bond. The project was delayed for two years. The electrical subcontractor claimed the prime contractor failed to compensate it for significant delays and out of scope work.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Bad Faith Claim for Investigation Fails
January 07, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe insurer prevailed in summary judgment, disposing of the insured's bad faith claim based upon the investigation of the loss. Nino v. State Farm Lloyds, 2014 U.S. Dist. LEXIS 163993 (S.D. Tex. Nov. 24, 2014).
The insured filed a claim with State Farm for damage resulting from a hailstorm on March 29, 2012. An independent adjuster, Charles Crump, conducted an investigation on behalf of State Farm. Crump inspected the roof, where he noted prior repair to the roof, and found no covered damage to the roof as the result of the 2012 hailstorm. Crump found minimal damage to other parts of the house, totaling $2,311.75, which resulted in no payment after the deduction. Crump provided the insured with a printed copy of his damage estimate.
The insured then hired a public adjuster who found damage totaling $31,991.72, including $10,051.22 in roof repairs.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
No Coverage For Wind And Flood Damage Suffered From Superstorm Sandy
July 27, 2020 —
Tred R. Eyerly - Insurance Law HawaiiThe court found that the policy's anti-sequential clause barred coverage for damage caused by Hurricane Sandy. Estate of Doerfler v. Fed. Ins. Co., 2020 N.J. Sup. Unpub. LEXIS 920 (May 14, 2020).
The insureds held identical homeowners policies from Chubb and Federal Insurance Company. Damage resulting from flood was not covered. The policies' "surface water exclusion" stated,
[W]e do not cover any loss caused by: flood, surface water, waves, tidal water, overflow of water from a body of water . . . or spray from any of these even if driven by wind.
The insureds also had separate flood insurance policies, insuring the structure of each home for $250,000.
Superstorm Sandy created wind gusts as high as eighty miles per hour. A severe storm surge caused tides to rise between nine and eleven feet. The storm surge caused surface water to flood onto plaintiffs' properties and their homes ultimately collapsed.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
FIFA Inspecting Brazil’s World Cup Stadiums
March 26, 2014 —
Beverley BevenFlorez-CDJ STAFFRepresentatives from FIFA have returned to Brazil to conduct inspections of the World Cup stadiums, according to the San Francisco Chronicle. Even though Brazil had told FIFA they would have all twelve done by the end of 2013, only nine are finished. Furthermore, “infrastructure work in many of the 12 host cities remains far from completed.”
“This is the last occasion for the organizers to take stock of the operational preparations before the respective FIFA World Cup installations begin to be implemented in all 12 host cities,” FIFA said in a statement, as quoted in the San Francisco Chronicle.
Read the court decisionRead the full story...Reprinted courtesy of
Appraiser Declarations Inadmissible When Offered to Challenge the Merits of an Appraisal Award
March 14, 2018 —
Valerie Moore and Christopher Kendrick - Publications & InsightsIn
Khorsand v. Liberty Mutual Fire Ins. Co. (No. B280273, filed 2/27/18), a California appeals court affirmed an appraisal award favorable to a homeowners insurer, ruling that it was improper to admit as evidence in opposition to a petition to confirm the award a declaration from the policyholders’ appraiser, except for the limited purpose of showing improprieties in the appraisal, bias, partiality or other improper conduct.
The homeowners had a pipe leak and submitted a claim. The insurer responded to an estimate from the owners’ adjuster by retaining an expert and paying an undisputed amount that was significantly less. Eleven months later the owners had upper deck damage and submitted another claim. Relying on the same expert, the insurer paid another undisputed amount significantly less than the owner’s estimate. The owners requested appraisal but the insurer denied the request, contending that the dispute was over coverage and outside the scope of appraisal.
The owners’ petition for appraisal was granted, with the court ordering separate listing of items the insurer disputed regarding coverage or causation. The appraisal panel issued an award stating that total damage was $132,293, of which $96,530 was contested by the insurer. The insurer filed a petition to confirm the award, which was granted despite the fact that the owners’ appraiser had refused to sign it.
Reprinted courtesy of
Valerie Moore, Haight Brown & Bonesteel LLP and
Christopher Kendrick, Haight Brown & Bonesteel LLP
Ms. Moore may be contacted at vmoore@hbblaw.com
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Design-Assist, an Ambiguous Term Causing Conflict in the Construction Industry[1]
December 02, 2019 —
John P. Ahlers - Ahlers Cressman & Sleight PLLC“Design-Assist” is one of the recent cost-saving trends being touted for construction projects and, in particular, construction projects utilizing alternative procurement methods. If an internet search for the term, “design-assist” is made, the result will be numerous construction industry articles and white papers lauding “design-assist” as a recent cost-saving trend in construction procurement. From a legal perspective, however, the term “design-assist” is notably absent from court opinions and most state licensing laws. With the exception of the ConsensusDocs, few standard form contracts even include the term “design-assist” in their text.
The ConsensusDocs agreement provides examples of the Constructor’s obligations to perform “assisting activities” (the term “design-assist” is not used) and states that, notwithstanding the performance of such “assisting activities” by the Constructor, the responsibility of the design remains with the Designer unless otherwise stated in the Contract:
- Article 4.5 DESIGN PROFESSIONAL’S RESPONSIBIITIES The Designer shall furnish or provide all design and engineering services necessary to design the Project in accordance with the Owner’s objectives … the Designer shall draw upon the assistance of Constructor and others in developing the design, but the Designer shall retain overall responsibility for all design decisions….
- Article 4.6 CONSTRUCTOR’S RESPONSIBILITIES [T]he Constructor shall assist the Designer in the development of the Project Plan and Project Design but shall not provide professional services which constitute the practice of architecture or engineering unless the Constructor needs to provide such services in order to carry out its responsibilities … or unless specifically called for by the Contract Documents.
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers Cressman & Sleight PLLCMr. Ahlers may be contacted at