Tred R. Eyerly - Insurance Law HawaiiThe Tenth Circuit affirmed the district court's grant of summary judgment to the insurer on the insured's claims for collapse and bad faith. Christopher M. Wolpert Saddletree Holding, LLC v. Evanston Ins. Co., 2024 U.S. App. LEXIS 10377 (10th Cir. April 30, 2024).
On May 7, 2019, Saddletree filed a claim with Evanston for damages sustained to its building which was used as a community events center. After a winter of heavy snowfall, Saddletree discovered that the building's steel support columns had buckled two or more inches and the roof had deflected downward approximately six inches.
Evanston retained an engineer to inspect the building. The engineer determined that the damage was the result of the building's inadequate "design and/or construction." Evanston disclaimed coverage under the policy's exclusion for damage caused by "hidden or latent defects" or "any quality in property that causes it to damage or destroy itself."
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Punchlist: The News We Didn’t Quite Get To – May 2016
May 12, 2016 —
Garret Murai – California Construction Law BlogIf you’re a solar contractor make sure you don’t get burned. The California Contractors State License Board (“CSLB”) is taking a closer look at solar contractors as the industry grows in the Golden State. Only contractors holding a Class “A” Engineering, Class “B” General Contractor, or Class C-46 Solar license can perform solar construction and installation.
The CSLB has clarified that C-39 Roofing contractors can install installation as part of an overall roofing job. The CSLB considers such insulation work as “incidental and supplemental” under Section 831 of the California Code of Regulations and does not require a separate C-2 Insulation and Acoustical contractor license.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Be Careful with Continuous Breach and Statute of Limitations
January 21, 2019 —
Christopher G. Hill - Construction Law MusingsIf you are a construction attorney like me (or anyone that takes cases to court), you deal with statutes of limitation on a daily basis. These statutes seem pretty simple. A party has “X” amount of time in which to file its lawsuit after accural of the cause of action. In a breach of contract suit, the accrual is the date of breach. Easy, right? Wrong, at least in some circumstances.
Take for example, the case of Fluor Fed. Sols., LLC v. PAE Applied Techs., LLC out of the 4th Circuit Court of Appeals. In this unpublished opinion the Court looked at “continuous breach” versus “series of separate breaches.” The basic facts are that in 2000 Flour entered into a contract with PAE whereby PAE requested and claims to have received consent from Flour to a 2.3% administrative cost cap on Flour’s work on an Air Force contract. Flour claimed that it did not agree to this cap. In 2002, Flour begain billing PAE for its costs plus the 2.3% administrative markup and billed in this fashion for the first full year. However, in subsequent years and for the next 11 years, Flour billed PAE at a higher markup rate than the 2.3%. PAE disputed the increased markup and paid Flour at the 2.3% rate. Flour periodically protested but made no move to court until it filed suit in March of 2016. After a bench trial, the district court found that Flour had agreed to the cap and found for PAE.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Kentucky Supreme Court Creates New “Goldilocks Zone” to Limit Opinions of Biomechanical Experts
July 24, 2023 —
Aimee E. Muller - Lewis BrisboisLexington, Ky. (June 26, 2023) – In a recent decision, the Kentucky Supreme Court placed stricter limitations on the opinions that biomechanical engineers may offer at trials in Kentucky courts. Specifically, the published opinion issued in Renot v. Securea, Supreme Ins. Co., 2023 Ky. LEXIS 163, recognizes a new space for the testimony of biomechanics experts – “The Goldilocks Zone.”
Where is the Goldilocks Zone?
The Goldilocks Zone is a perfect place in which the proffered testimony is neither too specific such that it wanders into the realm of medical causation, nor too general such that it fails to help a lay jury. Specifically, a biomechanical engineer’s expert testimony must be limited to the forces generated by the subject collision, the generally anticipated responses of a hypothetical person’s body to those forces, and the range of typical injuries resulting from such forces. Moreover, following Renot, a biomechanical engineer’s proffered opinions no longer may enter into the realm of diagnosing a specific medical condition associated with a traumatic injury. Instead, the question of whether a trauma actually caused or exacerbated a plaintiff’s injuries falls solely within the purview of a medical doctor.
Read the court decisionRead the full story...Reprinted courtesy of
Aimee E. Muller, Lewis BrisboisMs. Muller may be contacted at
Aimee.Muller@lewisbrisbois.com
No Coverage for Installation of Defective Steel Framing
June 26, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe California Court of Appeal affirmed the trial court's holding that the insurer had no duty to defend claims arising out of the insureds' installation of defective steel framing in an apartment building. Regional Steel Corp. v. Liberty Surplus Ins. Corp., No. B245961(Cal. Ct. App. May 16, 2014) [decision here].
Regional Steel was a subcontractor for providing reinforced steel to the columns, walls, and floors of an apartment building under construction. Regional used 90 degree and 135 degree seismic hooks as approved by the general contractor, JSM Construction, Inc. The City building inspector issued a correction notice, however, requiring the exclusive use of the 135 degree hooks. Levels one through three had defective tie hooks and required repair. JSM refused to pay Regional's invoices and withheld $545,000. JSM had to make repairs that required opening up numerous locations in the concrete walls, welding reinforcements to the steel placed by Regional, and otherwise strengthening the inadequate installation.
Regional sued JSM for the withheld payment. JSM cross-claimed, asserting breach of contract and breach of express and implied warranties.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Delay Leads to Problems with Construction Defects
November 27, 2013 —
CDJ STAFFThe Bardwells bought a new home in the Philadelphia area in 2000. Now, thirteen years later they’ve learned that their house has been slowly rotting away due to moisture trapped beneath the stucco. And they’re not alone. The O’Days bought a home for about $1 million, and it now needs about $200,000 in repairs. All the stucco has been removed and their home is being rebuilt. Monica Bardwell said that “everything was rotted,” and “there was not a piece of good wood to be salvaged.”
Other area homeowners are finding similar problems. Wendy Meyer had her home inspected by Kevin Thompson. Mr. Thompson said, “I shouldn’t be able to take a piece of plywood like that and crush it in my hands completely disintegrated.”
Mr. Thompson described it as due to “faulty construction,” which he estimated accounted for such damage “95 percent of the time.” The Pennsylvania Builders Association says that diligent homeowners can head off problems with maintenance. “Make sure water isn’t continually on the outside of the stucco,” said Brent Sailhamer of the PBA. “Make sure there are no large cracks where water can seep behind the stucco.”
For those who bought their homes as far back as the Bardwells, it’s already too late to sue anyone. Pennsylvania construction defect law allows 12 years for lawsuits.
Read the court decisionRead the full story...Reprinted courtesy of
Comply with your Insurance Policy's Conditions Precedent (Post-Loss Obligations)
May 31, 2021 —
David Adelstein - Florida Construction Legal UpdatesI am of the opinion that if your property insurer requests a sworn proof of loss, furnish one with the assistance of counsel (preferably). Ignoring the insurer’s request or refusing to comply with insurer’s request is NOT value-added; it is simply placing you at a disadvantage based on the insurer’s argument that you, as the insured, materially breached the policy. I generally find no value having to confront this expected argument. Instead, I find value making an effort to comply with post-loss obligations including the insurer’s request to submit a sworn proof of loss. Working with counsel can help you comply with post-loss obligations (conditions precedent) while not weakening the value or merits of your claim.
By way of example, in Edwards v. Safepoint Ins. Co., 46 Fla. L. Weekly D1086a (Fla. 4th DCA 2021), the insured did not provide its property insurer with the requested sworn proof of loss. The insurer moved for summary judgment that the insured’s failure to submit the sworn proof of loss was a material breach of the policy that rendered the policy ineffective. The trial court agreed and granted summary judgment. The Fourth District Court of Appeal affirmed explaining “[a] total failure to comply with policy provisions made a prerequisite to suit under the policy may constitute a breach precluding recovery from the insurer as a matter of law. If, however, the insured cooperates to some degree or provides an explanation for its noncompliance, a fact question is presented for resolution by a jury.” Edwards, supra, quoting Haiman v. Federal Ins. Co., 798 So.2d 811, 812 (Fla. 4th DCA 2001).
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Another Exception to Fraud and Contract Don’t Mix
January 18, 2021 —
Christopher G. Hill - Construction Law MusingsHere at Construction Law Musings, we’ve discussed the fact that, in Virginia, the “economic loss rule” generally renders claims of fraud and construction contracts like oil and water. This is true in most states, including Florida.
What this means is that as a general rule where any party is supposed to perform under a contract, and fails to do so, the Virginia courts will dismiss a fraud claim out of a desire to avoid turning any breach of contract (read “broken promise”) case into a claim for fraud. As you have likely gathered by the title of this post, there are exceptions. One is a properly plead Virginia Consumer Protection Act (“VCPA”) claim.
Another, found in a recent Loudoun County, VA Circuit Court opinion in Madison v. Milton Home Systems Inc., is so called fraud in the inducement (in other words, inducing a person to enter the contract under false pretenses). In Madison the Court analyzed several counts based upon a modular home contract and so called “performance agreement” guarantying that the home would be installed by the manufacturer in the event that it’s installer failed to perform.
Read the court decisionRead the full story...Reprinted courtesy of