Wilke Fleury Attorneys Awarded Sacramento Business Journal’s Best of the Bar
September 30, 2019 —
Dan Egan, Steve Williamson & David Frenznick - Wilke FleuryWilke Fleury congratulates attorneys Dan Egan, Steve Williamson and David Frenznick on their inclusion in the Sacramento Business Journal 2019 Best of the Bar!
The Sacramento Business Journal annually honors the region’s top attorneys after a rigorous process of selection. To be awarded the Best of the Bar, attorneys are nominated by fellow attorneys and then vetted by a panel of peers.
Reprinted courtesy of Wilke Fleury attorneys
Dan Egan,
Steven J. Williamson and
David A. Frenznick
Mr. Egan may be contacted at degan@wilkefleury.com
Mr. Williamson may be contacted at swilliamson@wilkefleury.com
Mr. Frenznick may be contacted at dfrenznick@wilkefleury.com
Read the court decisionRead the full story...Reprinted courtesy of
Code Changes Pave Way for CLT in Tall Buildings and Spark Flammability Debate
May 13, 2019 —
Sam Barnes - Construction ExecutiveAlthough nothing new, the debate over which is better as a building material—wood or concrete—intensified in December following the preliminary approval of new codes for cross-laminated timber and mass timber in tall structures.
The discussion among industry professionals has been less about CLT’s structural capabilities and more about its perceived flammability, with either side offering decidedly different perspectives. Comparatively new to the United States, CLT and mass timber products are constructed of several layers of pressed lumber board stacked in alternating directions.
In December, the International Code Council released the unofficial voting results on several code change proposals, including passage of the entire package of 14 tall mass timber codes. The proposals were presented by the ICC’s Ad Hoc Committee on Tall Wood Buildings, comprised mostly of engineers, architects, building and fire code officials, fire service, materials and testing lab representatives.
Reprinted courtesy of
Sam Barnes, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Wisconsin Court Applies the Economic Loss Doctrine to Bar Negligence Claims for Purely Economic Losses
August 17, 2020 —
Rahul Gogineni - The Subrogation StrategistIn Mech. Inc. v. Venture Elec. Contrs., Inc., No. 2018AP2380, 2020 Wisc. App. LEXIS 170, the Court of Appeals of Wisconsin, District Two, considered whether a party may bring a negligence claim for purely economic damages. In upholding the lower court, the appellate court found that a party is barred by the Economic Loss Doctrine from bringing a negligence claim for purely economic damages.
Both parties involved in this action were subcontractors on a building project at the Great Lakes Research Facility for the University of Wisconsin-Milwaukee. As a result of Venture Electrical Contractors, Inc. (Venture) not paying for requested work, Mechanical, Inc. (Mechanical) sued Venture for $11,961.31. Venture, in turn, countersued in negligence for $1.1 million for costs incurred due to delays and untimely performance. Mechanical sought dismissal of the negligence claim based upon the Economic Loss Doctrine. Finding that the Economic Loss Doctrine applies to purely economic losses, the trial court dismissed Venture’s negligence claim. Venture appealed to the Court of Appeals of Wisconsin.
Read the court decisionRead the full story...Reprinted courtesy of
Rahul Gogineni, White and Williams LLPMr. Gogineni may be contacted at
goginenir@whiteandwilliams.com
New Change Order Bill Becomes Law: RCW 39.04.360
July 08, 2024 —
Brett M. Hill - Ahlers Cressman & Sleight PLLCA new statute (RCW 39.04.360) became effective on June 6, 2024, and it applies to extra work performed by contractors and subcontractors on public and private projects in Washington State. The intent of the original bill was to allow contractors and subcontractors to get paid sooner for undisputed additional work. The statute does not apply to private residential projects of 12 units or less. The statute allows for recovery of interest for contractors/subcontractors at 1% per month (12% per year) on the value of the additional work if the statute is violated.
Here are the requirements of the new statute:
- Public and private owners must issue a change order for the undisputed amount of additional work performed by a contractor, subcontractor, or supplier no later than 30 days after the work is satisfactorily completed and the change is requested by the contractor.
- General contractors, and subcontractors with lower-tier subs, must issue a change order to their subcontractors impacted by the change within 10 days after receipt of the approved change order from the owner/upper-tier contractor.
Read the court decisionRead the full story...Reprinted courtesy of
Brett M. Hill, Ahlers Cressman & Sleight PLLCMr. Hill may be contacted at
brett.hill@acslawyers.com
Savannah Homeowners Win Sizable Judgment in Mold Case against HVAC Contractor
August 10, 2017 —
David R. Cook Jr. - Autry, Hanrahan, Hall & Cook, LLPTwo Savannah homeowners filed a complaint against a local air conditioning contractor and its insurer, asserting claims of professional negligence and fraud. The couple alleged that in March 2009, the contractor replaced the duct system of their home’s air conditioning unit. The following June, the couple discovered mold growth on the vent covers. They hired an independent contractor who upon inspection concluded that the duct system, which contained holes, gaps, loose connections and insufficient mastic, had been defectively installed in violation of the applicable city ordinances, resulting in excessive moisture and mold contamination throughout the residence. The homeowners alleged that they grew ill with respiratory problems as a result and were subsequently forced to vacate the residence and abandon their personal belongings. Their complaint sought to recover repair costs, moving costs, expenses associated with rental property, costs of living, costs related to the replacement of personal property, medical expenses, punitive damages, attorney’s fees, and costs of litigation.
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook, Autry, Hanrahan, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
Because I Haven’t Mentioned Mediation Lately. . .
November 23, 2020 —
Christopher G. Hill - Construction Law MusingsAny regular reader of Construction Law Musings knows that I am both a great believer in mediation and a certified Virginia mediator. After the last few weeks in which I participated in mediation by Zoom, a Judicial Settlement Conference (read, court-ordered mediation with a retired judge), and will be participating in another mediation in person next week, it seems as if others believe in the process as well.
After all of this mediation activity, all of which related to construction project-related disputes, I am more convinced than ever that almost every construction case should at least be submitted for mediation. The list below gives my reasons for saying this:
- The parties are in control. In litigation or arbitration, the parties present their evidence to a third party or parties with no familiarity with the “boots on the ground” reality of the construction project at issue. This third party gives a cold review of what evidence court rules allow them to consider and gives a final ruling that one side “wins” and the other side “loses.” This decision has monetary consequences for the losing party, not the least of which is a large attorney fee bill after potentially several years of legal wrangling. With mediation, those closest to the project, the parties, can say what they want, present what they feel to be the best case, and work for a solution. The solution can be flexible and allow the two sides to reach a business decision that is at least better than a large monetary judgment against one of the parties that is only further enforceable in court.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Brad Pitt’s Foundation Sues New Orleans Architect for Construction Defects
September 25, 2018 —
David Suggs – Bert L. Howe & Associates, Inc.Brad Pitt’s foundation has sued its architect of New Orleans projects alleging “defective design work led to leaks and other flaws in homes built for residents of an area that was among the hardest hit by Hurricane Katrina,” reported Insurance Journal.
The Make It Right Foundation claims damages of more than $15 million caused by architect John C. Williams. According to Insurance Journal, “The foundation paid Williams’ firm millions of dollars to produce architectural drawings for more than 100 homes under the program, which was supposed to provide Lower 9th Ward residents with sustainable and affordable new homes.”
This lawsuit against the architect is apparently in response to a class-action lawsuit by New Orleans attorney Ron Austin against Pitt’s Make It Right Foundation. Austin’s lawsuit “accused the charity of building substandard homes that are deteriorating at a rapid pace,” Insurance Journal reported.
The 39 homes involved in a previous suit regarding the manufacturer of TimberSIL are excluded from the lawsuit against Williams.
Read the court decisionRead the full story...Reprinted courtesy of
Mark Van Wonterghem To Serve as Senior Forensic Consultant in the Sacramento Offices of Bert L. Howe & Associates, Inc.
March 01, 2012 —
CDJ STAFFSacramento, CA — Bert L. Howe and Associates, Inc., is pleased to announce that Mark Van Wonterghem - General Contractor, has joined the firm as Senior Forensic Consultant. Mark will be responsible for leading the firm’s expansion in the newly formed Sacramento headquarters.
His focus will continue to be working with construction practice groups and claims professionals in the Sacramento and Bay Area markets. He will utilize the resources of the Construction Experts Group at Bert L. Howe & Associates in furthering the litigation support needs attendant to the firm’s Northern California clientele.
Mr. Van Wonterghem possesses extensive consulting and testimony experience. Through 32 years of experience in the construction industry he leverages extensive practical experience with multiple trades including concrete foundations, walls and flatwork, structural wood and steel framing, finish carpentry, drywall, lath & plaster/stucco, window & door installations, deck coating systems, metal and membrane flashings and above/below grade waterproofing. This trade experience encompasses both the commercial and residential construction sectors and has been vital in his ability to provide concise explanation of construction industry standards, as well as trade-specific standards of care.
Mr. Van Wonterghem has broad experience with all types of building construction ranging from concrete and steel commercial construction to high-end custom residential construction.
In connection with the Construction Experts Group at BHA, Mr. Van Wonterghem provides construction consulting and litigation support services to a wide variety of recognized construction claims professionals, owners, and publicly traded builders.
The firm’s Sacramento offices are located at the Gateway Oaks III office complex, 2520 Venture Oaks Way, Suite 435, Sacramento, CA 95833. Mr. Van Wonterghem can be reached via e mail at mvanwonterghem@berthowe.com or at (800) 783-1822.