Elon Musk's Boring Co. Is Feuding With Texas Over a Driveway
July 25, 2022 —
Sarah McBride - BloombergWhile Elon Musk is publicly making a big deal about moving to Texas and cozying up to the governor, behind the scenes his tunnel-building venture, Boring Co., is wrangling with local authorities in the state over a host of seemingly mundane permitting issues.
Since Boring bought land last May to create a research and development center in Bastrop, Texas, a rural area outside Austin, the company has put workers up on mobile homes at the site without authorized sewage facilities, failed to get air and stormwater permits and built a driveway without first getting official approval, according to documents obtained by Bloomberg News through a public records request.
The company’s dealings with Bastrop are yet another illustration of how Musk’s businesses often push the boundaries of or simply ignore regulations that bind other companies. In recent years his Tesla Inc. restarted production at its Fremont plant in defiance of pandemic rules to stay closed, Boring tried to build a tunnel in Los Angeles without going through an environmental review process and the US Securities and Exchange Commission is examining the disclosure of Musk’s stake in Twitter Inc.
Read the court decisionRead the full story...Reprinted courtesy of
Sarah McBride, Bloomberg
Hawaii Supreme Court Construes Designated Premises Endorsement In Insured's Favor
April 01, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe Hawaii Supreme Court held that a Designated Premises Endorsement provided coverage for injury and damage that occurred away from a listed location if the injury or damage arose out of the ownership, maintenance or use of the designated premises. C. Brewer and Co., Ltd. v. Marine Indemn. Ins. Co., 2015 Haw. LEXIS 62 (Haw. March 27, 2015). [Disclosure: our office represents C. Brewer].
The case involves coverage for the former owner (C. Brewer) of land under the Kaloko Reservoir. The Reservoir was fronted by an earthen dam. The Dam burst in March 2006, killing seven people and causing extensive property damage downstream.
In 1977, the State of Hawaii and C. Brewer entered an agreement requiring C. Brewer to, among other things, restore and expand the irrigation system that provided water to sugar cane fields in Kilauea, Kauai. C. Brewer formed the Kilauea Irrigation Company (KIC) to satisfy obligations to the State, revitalize the System, and sell System water to local farmers for irrigation.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Beam Fracture on Closed Mississippi River Bridge Is at Least Two Years Old
May 31, 2021 —
Jim Parsons - Engineering News-RecordThe Arkansas Dept. of Transportation (ARDOT) has terminated the employee responsible for inspecting the Interstate-40 Mississippi River bridge after two-year-old drone footage revealed the presence of a tie-beam fracture that forced
last week’s emergency shutdown.
Reprinted courtesy of
Jim Parsons, Engineering News-Record
ENR may be contacted at ENR.com@bnpmedia.com
Read the full story...
Read the court decisionRead the full story...Reprinted courtesy of
The Requirement to State a “Sum Certain” No Longer a Jurisdictional Bar to Government Contract Claims
November 13, 2023 —
Marcos R. Gonzalez - ConsensusDocsThe Boards of Contract Appeals, Court of Federal Claims, and the Federal Circuit have long held that the elements of a claim under the Contract Disputes Act (“CDA”) to be jurisdictional. Those requirements are as follows:
(a) Claims generally.–
(1) Submission of contractor’s claims to contracting officer.–Each claim by a contractor against the Federal Government relating to a contract shall be submitted to the contracting officer for a decision.
(2) Contractor’s claims in writing.—Each claim by a contractor against the Federal Government relating to a contract shall be in writing.
(3) Contracting officer to decide Federal Government’s claims.–Each claim by the Federal Government against a contractor relating to a contract shall be the subject of a written decision by the contracting officer.
Read the court decisionRead the full story...Reprinted courtesy of
Marcos R. Gonzalez, Peckar & Abramson, P.C.Mr. Gonzalez may be contacted at
mgonzalez@pecklaw.com
OSHA’s Multi-Employer Citation Policy: What Employers on Construction Sites Need to Know
September 09, 2019 —
Phillip C. Bauknight - Construction ExecutiveMulti-employer worksites are a frequent occurrence in the construction industry as employees from various companies often occupy the same site while a project is being completed. While the need for employees from different companies may be necessary to perform the various tasks required by a project, the presence of multiple employers, and their employees, on the same worksite can result in an increased risk of safety hazards.
Companies performing construction work should be, and generally are, aware of OSHA’s ability to issue citations for workplace safety violations. What many companies may not know, however, is that OSHA’s ability to cite employers is not limited to workplace conditions that are unsafe only to that employer’s direct employees. Rather, OSHA also has the ability to cite an employer, and often does issue such citations, for conditions that could result in injury or death to another company’s employees.
The policy which provides OSHA with this citation ability is CPL 02-00-124 and is called the Multi-Employer Citation Policy (the “Policy”). Under the language of the Policy, OSHA has the ability to cite multiple employers for violations of the Occupational Safety and Health Act for the same hazardous workplace condition. Critically, responsibilities under the Policy do not depend on the employer’s job title but are determined by the employer’s role.
Reprinted courtesy of
Phillip C. Bauknight, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Bauknight may be contacted at
pbauknight@fisherphillips.com
Court Confirms No Duty to Reimburse for Prophylactic Repairs Prior to Actual Collapse
October 28, 2015 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn Grebow v. Mercury Insurance Company (No. B261172, filed 10/21/15), a California appeals court held that coverage for collapse in a homeowners policy does not extend to prophylactic repairs undertaken to mitigate damage before actual collapse of the structure.
In Grebow, the insureds had a general contractor inspect the rear deck of their house because of recurring watermarks. The contractor discovered severe decay in the steel beams and poles supporting the second floor of the house. He opined that they could not support the upper portion of the house, and that a large portion of the house would fall. A structural engineer agreed, blaming decay and corrosion. The insureds were advised not to enter the top part of the house, and they contracted for repairs. They also made a claim to Mercury, which denied coverage. The insureds ultimately spent $91,000 out of pocket having the home remediated.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Texas “Loser Pays” Law May Benefit Construction Insurers
June 07, 2011 —
CDJ STAFFUnder a new law, Texas HB 274, the Texas Supreme Court will be making rules for motions to dismiss and to expedite suits of less than $100,000. The law also contains two “loser pays” provisions. If a lawsuit is found dismissed for having “no basis in fact or law,” the losing side must pay attorney costs. The other provision caps award of attorney fees if plaintiffs reject settlement offers. Texas Lawyer quotes Houston attorney Mike Gallagher as saying this will affect “the practice of everyone who handles significant lawsuits.”
Gregory Marcum, whose practice includes construction defect litigation, plans to contact insurance companies, as the new law may save them money. “It will definitely be a factor in the defense strategy for handling a case.” He notes that “any insurance carrier would want that done.”
Marcum notes that the offer-of-settlement rules only apply when cases go to trial. “Almost all cases settle.”
Read HB 274
Read the full story…
Read the court decisionRead the full story...Reprinted courtesy of
Insurance Policies Broadly Defining “Suits” May Prompt an Insurer’s Duty to Defend and Indemnify During the Chapter 558 Pre-Suit Notice Process
May 30, 2018 —
Daniel Garcia - Gordon & Rees Construction Law BlogIn Altman Contractors, Inc. v. Crum & Forster Specialty Insurance Company, No. SC16-1420, 2017 WL 6379535 (Fla. Dec. 14, 2017), the Florida Supreme Court addressed whether the notice and repair process set forth in chapter 558, Florida Statutes, constitutes a “suit” within the meaning of a commercial liability policy issued by Crum & Forster Specialty Insurance Company (“C&F”) to Altman Contractors, Inc. (“Altman”). The Court found that because the chapter 558 pre-suit process is an “alternative dispute resolution proceeding” as included in the definition of “suit” in the policy by C&F to Altman, C&F had a duty to defend Altman during the chapter 558 process, prior to the filing of a formal lawsuit.
Chapter 558, titled “Construction Defects,” sets forth procedural requirements before a claimant may file a construction defect action. It requires a claimant to serve a written notice of claim on the applicable contractor, subcontractor, supplier, and/or design professional prior to filing a construction defect lawsuit. The legislature intended for Chapter 558 to be an alternative dispute resolution mechanism in certain construction defect matters allowing an opportunity to resolve the claim without further legal process.
Read the court decisionRead the full story...Reprinted courtesy of
Daniel Garcia, Gordon & Rees Scully MansukhaniMr. Garcia may be contacted at
daniel.garcia@grsm.com