Proposed Florida Construction Defect Act
January 09, 2015 —
Beverley BevenFlorez-CDJ STAFFMichael J. Furbush and Thomas P. Wert of Roetzel & Andress discussed Florida’s House Bill 87, which proposes to “substantially overhaul Florida’s Construction Defect Act, Chapter 558, requiring property owners to provide more detailed notice of the alleged defect and imposing sanctions on property owners who make frivolous claims.”
Representative Kathleen Passidomo sponsored the bill, which “requires claimants to provide additional details about the alleged defect in the notice of claim, including the specific location of each alleged defect, and the specific provisions of the building code, plans, or specifications that serve as the basis of the defect claim. The failure to include this information in the notice of claim would be considered prima facie evidence of a defective notice.”
Read the court decisionRead the full story...Reprinted courtesy of
The California Legislature Passes SB 496 Limiting Design Professional Defense and Indemnity Obligations
June 15, 2017 —
Mark Himmelstein & Jenny Guzman – Newmeyer & Dillion LLPSince 2008 when the California legislature limited subcontractor indemnity obligations, the design professional community has been shouting “what about us?” Well, the legislature finally responded and a new law that limits design professional’s defense and indemnity obligations to their percentage of fault goes into effect on January 1, 2018.
THE NEW LAW – SB 496
SB 496 amends California Civil Code section 2782.8 and states that indemnity agreements must be limited to the negligence, recklessness or willful misconduct of the indemnitee (i.e. no more Type I indemnity with design professionals). The amendment also provides that “in no event shall the cost to defend charged to the design professional exceed the design professional’s proportionate percentage of fault”, with a limited opportunity for reallocation in the event another defendant is judgment proof.
However, the duty to defend still remains and still arises at the time of the tender of the defense (both issues that were unsuccessfully targeted by the design professional lobbyists).
WHAT CAN BE DONE NOW?
Developers and Owners should strongly consider reviewing and revising the indemnity provisions in their consultant contracts to comply with the new legislation before the first of the year. This includes master agreements because project addenda entered into after January 1 are subject to the new law. The statute does not apply to current contracts, so these do not need to be amended.
Questions? Newmeyer & Dillion is happy to assist in navigating the process to ensure you are compliant prior to January’s deadline. Please let us know how we can help.
Mark Himmelstein is a partner focused in the areas of construction, real estate, business and insurance litigation. He has an in-depth experience in drafting and negotiating construction and real estate contracts. You can reach him at mark.himmelstein@ndlf.com.
Jenny Guzman is a litigation associate in the Newport Beach office, focusing her practice in the areas of business and real estate litigation and transactions. You can reach her at jenny.guzman@ndlf.com.
About Newmeyer & Dillion
For more than 30 years, Newmeyer & Dillion has delivered creative and outstanding legal solutions and trial results for a wide array of clients. With over 70 attorneys practicing in all aspects of business, employment, real estate, construction and insurance law, Newmeyer & Dillion delivers legal services tailored to meet each client’s needs. Headquartered in Newport Beach, California, with offices in Walnut Creek, California and Las Vegas, Nevada, Newmeyer & Dillion attorneys are recognized by The Best Lawyers in America©, and Super Lawyers as top tier and some of the best lawyers in California, and have been given Martindale-Hubbell Peer Review's AV Preeminent® highest rating. For additional information, call 949-854-7000 or visit http://newmeyeranddillion.com/
Read the court decisionRead the full story...Reprinted courtesy of
Washington Court of Appeals Upholds Standard of Repose in Fruit Warehouse Case
August 04, 2011 —
CDJ STAFFOn July 28, the Washington Court of Appeals ruled in Clasen Fruit & Cold Storage v. Frederick & Michael Construction Co., Inc. that more than six years had passed since a contractor had concluded work and so granted a summary dismissal of the suit.
Frederick & Michael Construction Co., Inc. (F&M) was contracted to construct several buildings for Clasen Fruit and Cold Storage. These were completed in March, 1999. The buildings suffered wind damage to the roofs in 2001, 2003, 2005, and 2006. In the first two incidents, F&M repaired the roofs with Clasen paying for repairs.
In 2005, Clasen hired Continuous Gutter to make repairs. The final incident was the collapse of the roof of one building. This was attributed to “excessive moisture in the roof’s vapor barriers.” At this point, Clasen demanded that F&M pay for repair and replacement costs. In 2008, Clasen sued F&M for damages for breach of contract and negligent design and construction of the roof.
The decision then covered the meanings, in Washington law, of “termination of services” and “substantial completion.” The panel concluded that construction was “substantially completed in 1997” and “relevant services” by 2001. “But Clasen did not sue until 2008, some seven years after termination of any roof related services.”
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
California Court of Appeal Holds That the Right to Repair Act Prohibits Class Actions Against Manufacturers of Products Completely Manufactured Offsite
February 06, 2019 —
Gus Sara - The Subrogation StrategistIn Kohler Co. v. Superior Court, 29 Cal. App. 5th 55 (2018), the Second District of the Court of Appeal of California considered whether the lower court properly allowed homeowners to bring class action claims under the Right to Repair Act (the Act) against a manufacturer of a plumbing fixture for alleged defects in the product. After an extensive analysis of the language of the Act, the court found that class action claims under the Act are not allowed if the product was completely manufactured offsite. Since the subject fixture was completely manufactured offsite, the Court of Appeal reversed the lower court’s decision. The court’s holding establishes that rights and remedies set forth in the Right to Repair Act are not available for class action claims alleging defects in products completely manufactured offsite.
In Kohler Co., homeowners instituted a class action against Kohler, the manufacturer of water pressure and temperature regulating valves that were installed into their homes during original construction. The class action was filed on behalf of all owners of residential dwellings in California in which these Kohler valves were installed as part of original construction. The complaint asserted, among other claims, a cause of action under the Act. Kohler filed a motion for anti-class certification on the ground that causes of actions under the Act cannot be certified as a class action. The trial court denied the motion with respect to the Act but certified its ruling for appellate review. Kohler filed a petition with the Court of Appeals, arguing that certain sections of the Act explicitly exclude class action claims under the Act.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and Williams LLPMr. Sara may be contacted at
sarag@whiteandwilliams.com
Orange County Home Builder Dead at 93
April 25, 2012 —
CDJ STAFFRandall E. Presley was a homebuilder in Southern California for more than thirty years, acting as head of Presley Development Company from 1956 until selling the firm to Lyon Homes in 1987. The two companies merged in 1991 as the Presley Cos. Mr. Presley saw the need in the 1950s to provide people in Southern California with low- to medium-priced quality homes.
His firm built more than 160 communities and was among the ten largest homebuilding firms in the country, expanding beyond California. Mr. Presley was 93 when he succumbed to pneumonia. He is survived by a wife, three children, seven grandchildren, and 11 great-grandchildren.
Read the full story…
Read the court decisionRead the full story...Reprinted courtesy of
Climate Disasters Are an Affordable Housing Problem
October 01, 2024 —
Juan Pablo Garnham & Arjuna Heim - BloombergWhen Maui was devastated by wildfires in August 2023, some residents were initially fortunate. The neighborhood of Makawao, for example, was spared the worst effects of the fire that engulfed Lahaina, 35 miles to the west.
Recently, though, we met a woman in that neighborhood who faces a different kind of threat: Her landlord has now demanded that she pay double her rent or face eviction. As housing advocates in the region, we’ve heard stories like this repeatedly, as residents report an acute fear of displacement and homelessness.
A year after the fires killed more than 100 people, displaced 12,000 and disrupted the economy of the island, the disaster lingers for many in Maui and Hawai'i. Rents across the island have increased sharply, offering a cautionary tale for the rest of the US about how climate change, a housing crisis and the lack of adequate public policies can multiply the suffering of a community already in pain.
Read the court decisionRead the full story...Reprinted courtesy of
Bloomberg
Lien Actions Versus Lien Foreclosure Actions
June 02, 2016 —
David R. Cook Jr. – AHHC Construction Law BlogThe lawsuits required to perfect and foreclose upon a lien have confused lien claimants and their attorneys for years. This confusion was recently demonstrated in a recent case entitled Founders Kitchen and Bath, Inc. v. Alexander, No. A15A1262, 2015 WL 6875026 (Ga. App. 2015).
In the case, the trial court granted an owner’s motion for summary judgment against a subcontractor that sought to foreclose on its materialman’s lien. In deciding to reverse the trial court’s decision, the Court held that issues of material fact still existed as to whether the owner and subcontractor were in privity of contract.
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook Jr., Autry, Hanrahan, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
New York Office Secures Appellate Win in Labor Law 240(1) Fall in Basement Accident Case
March 20, 2023 —
Nicholas P. Hurzeler & Gregory S. Katz - Lewis BrisboisNew York, N.Y. (March 14, 2023) – New York Appellate Partner Nicholas P. Hurzeler and Managing Partner Gregory S. Katz recently prevailed when the New York Appellate Division, Second Department affirmed the dismissal of a Labor Law 240(1) claim involving an accident that occurred in the basement of a house under construction. Balfe v. Graham, ___ AD3d ___ (2d Dept. 2023), decided March 8, 2023.
In this matter, the plaintiff was installing ductwork in the basement of a house that had been stripped down to its foundation when he stepped backwards into an open hole that had been dug out of a concrete floor to accommodate the installation of an ejector pump. The lower court dismissed the plaintiff’s claim based on Labor Law 240(1), and he appealed. The plaintiff argued that he fell into an unprotected opening that should have been covered or barricaded. He further claimed the accident qualifies as a typical “falling worker” case within the scope of Labor Law 240(1), citing the depth of the hole needed to accommodate the ejector pump, and the size of the pump. Under the case law, a worker who falls into an uncovered opening on a construction site will typically be covered by Labor Law 240(1).
Reprinted courtesy of
Nicholas P. Hurzeler, Lewis Brisbois and
Gregory S. Katz, Lewis Brisbois
Mr. Katz may be contacted at Greg.Katz@lewisbrisbois.com
Mr. Hurzeler may be contacted at Nicholas.Hurzeler@lewisbrisbois.com
Read the court decisionRead the full story...Reprinted courtesy of