No Prejudicial Error in Refusing to Give Jury Instruction on Predominant Cause
November 11, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe California Court of Appeal affirmed the trial court's judgment after the jury determined there was no coverage for a leaking pipe. Mendoza v. Pacific Spec. Ins. Co., 2024 Cal. App. Unpub. EXIS 5477 (Cal. Ct. App. Aug. 20, 2024).
The Mendoza's third amended complaint alleged their home was damaged "by overflow of water from the dwelling's plumbing system resulting from a broken pipe, which overflow undermined the structural integrity of the dwelling."
The Mendozas insured their home under a policy issued by Pacific. The policy insured the property against "sudden and accidental direct physical loss" except where expressly excluded. The Mendozas submitted a claim Pacific paid approximately $1800 for the loss and closed the claim. The amount paid did not include payment for any structural damage to the home. The Mendozas alleged that Pacific's failure to conduct a full and fair investigation into the structural damage and its inadequate payment of benefits was a breach of the implied covenant of good faith and fair dealing.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Construction Resumes after Defects
June 28, 2013 —
CDJ STAFFWhen inspectors found defective bolts in the construction of the Media Arts Center at L. A. Mission College, the contractor walked off the job. The project had been underway for about eighteen months. After problems were found with welds and bolts, the contractor informed the school that it could not complete the job. The California Division of the State Architect then required inspection of every weld and joint, leading to a dispute as to who was going to pay for it.
At this point, only the first story has been inspected. Although the other two stories must be inspected, the new contractor is about to begin work on the building. James O’Reilly, the executive director for facilities, planning and development, said that “the main focus is on fixing the defective issues and getting construction completed so we can serve the Mission campus.” Still at question is how much SMC Construction received before they walked off the job.
Read the court decisionRead the full story...Reprinted courtesy of
Minnesota Civil Engineers Give the State's Infrastructure a "C" Grade for the Second Time
May 02, 2022 —
American Society of Civil EngineersSAINT PAUL, Mn. — The Minnesota Section of the
American Society of Civil Engineers (ASCE) today released preliminary findings from the 2022
Report Card for Minnesota's Infrastructure, with 10 categories of infrastructure receiving an overall grade of a 'C', meaning Minnesota's infrastructure is in mediocre condition. Minnesota has taken steps to make its infrastructure network more sustainable to withstand increasingly severe weather, but additional steps must be taken as the state's infrastructure is aging. Funding has been limited for systems throughout the state, particularly for surface transportation networks, and local and state funding must be increased to bring these critical systems up to speed. Civil engineers graded aviation (B), bridges (C), dams (C), drinking water (C-), energy (C), parks (B-), ports (C-), roads (D+), transit (C-) and wastewater (C).
"The ASCE report card serves as an important benchmark for where our infrastructure currently stands and lays out how we can make improvements," said Sen. Sandy Pappas, DFL-St. Paul. "Knowing that these systems play such a crucial role in economic progress and the safety of Minnesotan families, we have made infrastructure a topline issue and must continue to do so to secure a prosperous future here in Minnesota."
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
United States Supreme Court Backtracks on Recent Trajectory Away from Assertions of General Jurisdiction in Mallory v. Norfolk Southern
August 01, 2023 —
Charles S. Anderson - Lewis BrisboisWashington, D.C. (June 28, 2023) – On June 27, 2023, the U.S. Supreme Court issued a sharply divided opinion that appears to backtrack on the Court’s steady trajectory away from assertions of general jurisdiction in recent years, e.g. Goodyear Dunlop Tires Operations, S.A. v. Brown, 564 U.S. 915, 919 (2011), Daimler AG v. Bauman, 134 S. Ct. 746 (2014), BNSF Railway Co. v. Tyrrell, 2017, 137 S. Ct. 1549 (2017). Relying on a case from 1917, Pennsylvania Fire Ins. Co. of Philadelphia v. Gold Issue Mining & Milling Co., 243 U. S. 93 (1917), Justice Gorsuch, writing on behalf of the plurality, (Justices Gorsuch, Thomas, Sotomayor, and Jackson) (Justice Alito concurring) found that Norfolk Southern “consented” to jurisdiction in Mallory via 42 Pa. Cons. Stat. §5301(a)(2)(i),(b) by registering to do business in Pennsylvania. This statute, 42 Pa. Cons. Stat. §5301, specifically permits jurisdiction over a corporation “incorporat[ed] under or qualifi[ed]as a foreign corporation under the laws of this Commonwealth … for any cause of action that may asserted against him, whether or not arising from acts enumerated in this section.”
In Pennsylvania Fire, the U.S. Supreme Court addressed the Due Process Clause of the U.S. Constitution in connection with a Missouri law that required an out-of-state insurance company desiring to transact any business in the state to file paperwork agreeing to (1) appoint a state official to serve as the company’s agent for service of process and (2) accept service on that official as valid in any suit. After more than a decade of complying with the law, Pennsylvania Fire was served with process and argued that the Missouri law violated due process. The Court unanimously found that there was “no doubt” that Pennsylvania Fire could be sued in Missouri because it had agreed to accept service of process in Missouri on any suit as a condition of doing business there.
Read the court decisionRead the full story...Reprinted courtesy of
Charles S. Anderson, Lewis BrisboisMr. Anderson may be contacted at
Charles.Anderson@lewisbrisbois.com
South Adams County Water and Sanitation District Takes Proactive Step to Treat PFAS, Safeguard Water Supplies
November 28, 2022 —
Cameron McWilliam – Brown and CaldwellDENVER, Colo., Nov. 15, 2022 — The South Adams Country Water and Sanitation District (District) is enhancing its water treatment process to meet EPA Health Advisory Levels (HALs) for per- and polyfluoroalkyl substances (PFAS) in drinking water supplies.
Deemed “forever chemicals,” PFAS is a group of human-made chemicals used in many applications, including stain- and water-resistant fabrics and carpeting, cleaning products, paints, and firefighting foams. PFAS are resistant to grease, oil, water, and heat and may enter water supplies from landfills, the use of firefighting foam (e.g., at airports, fire training facilities, petroleum fires, etc.), industrial sites, and wastewater treatment plant discharge.
The District’s water supply, serving over 67,000 residents in Commerce City and parts of unincorporated Adams County, comes primarily from 13 groundwater supply wells. As it continues to meet all federal and state drinking water requirements, the District has been proactively pursuing PFAS reduction strategies since it first discovered a low-level presence in its water supply through voluntary testing in 2018. Upon discovery, the District stopped drawing from its most impacted wells and has been purchasing additional treated water to blend into its supply to reduce PFAS levels along with optimizing use of their existing granular activated carbon treatment system.
“Ever since the District first began voluntarily testing for PFAS, we have been monitoring for these compounds and working to reduce their impact on our customers,” said District Manager Abel Moreno. “The EPA has moved the goalposts, and we are taking steps to reduce the presence of PFAS even further. We are committed to finding long-term, sustainable solutions to offer our community high-quality drinking water.”
To tackle the challenge, the District has hired leading environmental and construction services firm Brown and Caldwell to design a new 18 million gallons per day (MGD) ion exchange (IX) process at its Klein Water Treatment Facility. IX treatment is currently the most effective technology in removing PFAS/PFOA, consisting of a highly porous resin that acts as a powerful magnet to adsorb and hold onto the substances. The new system at the Klein facility will consist of seven IX treatment trains, a 375,000-gallon equalization tank, and six vertical turbine pumps to feed the IX trains from the District’s 13 groundwater supply wells.
Furthermore, nine 5-micron cartridge filters will be installed to remove particulate matter in the water before reaching the IX trains, thus increasing the efficacy of the treatment process.
Scheduled for completion by the end of 2026, the new IX treatment facility will provide a peak combined capacity of 26 MGD.
About South Adams County Water and Sanitation District
The South Adams County Water and Sanitation District is a special district providing water and sanitary sewer service to over 67,000 residents in Commerce City and parts of unincorporated Adams County. For more information about the District, please visit www.sacwsd.org
About Brown and Caldwell
Headquartered in Walnut Creek, California., Brown and Caldwell is a full-service environmental engineering and construction services firm with 52 offices and 1,800 professionals across North America and the Pacific. For 75 years, our creative solutions have helped municipalities, private industry, and government agencies successfully overcome their most challenging water and environmental obstacles. As an employee-owned company, Brown and Caldwell is passionate about exceeding our clients’ expectations and making a difference for our employees, our communities, and our environment. For more information, visit www.brownandcaldwell.com
Read the court decisionRead the full story...Reprinted courtesy of
Homeowner Survives Motion to Dismiss Depreciation Claims
September 23, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer's motion to dismiss claims for improper claims handling when considering implementation of depreciation was denied. Morrison v. Indian Harbor Ins. Co, et al., 2024 U.S. Dist. LEXIS 115664 (S. D. W. Va. July 1, 2024).
Plaintiff's home suffered flood damage. The house was insured by Indian Harbor a surplus lines carrier that offered specialized and high risk property policies in West Virginia. Surplus lines policies were procured in West Virginia through a "surplus lines licensee." Here, Neptune Flood Inc. was the surplus lines licensee broker for Indian Harbor. Peninsula Insurance Bureau, Inc. was an administrator and loss adjuster involved in the claim.
After the flood, Plaintiff notified defendants of the damage and immediately cleaned and repaired the house. Plaintiff asserted that Neptune was given notice of the loss and one of its agents made recommendations regarding the coverage available and conveyed the information to Peninsula and Indian Harbour. Plaintiff claimed that defendants misrepresented his policy coverage and made incorrect adjustments for depreciation based on Neptune's statements and recommendations.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
New ConsensusDocs 242 Design Professional Change Order Form Helps Facilitate Compensation for Changes in Design Services
November 05, 2024 —
Brian Perlberg - ConsensusDocsConsensusDocs is publishing a new ConsensusDocs 242 Change in Services and Compensation, a change order for design services by a design professional. In the design and construction industry, one thing is certain – change. The work scope included in basic design services an architect or engineer provides occurs somewhat regularly. Previously, ConsensusDocs did not have a standard contract document for changing design professionals’ prices. As a result of user feedback, the ConsensusDocs Contract Content Advisory Council (CCAC) drafted this new architect/engineer change order. The CCAC unanimously approved the new contract document and publication is set for October 14, 2024. The document will be available for most ConsensusDocs subscribers. The full, owner, design-professional, and short-form subscription packages will include the document. A subscription package can be purchased through ConsensusDocs here.
The design professional change order helps owners of construction projects keep track of additional services their design professionals perform. The design professional must provide itemized labor breakdowns for each invoice. The new ConsensusDocs 242 has options for compensation to be actual hours at the billing rate or a lump sum. The new contract document form also has a table for the remaining project deliverables and their respective due dates.
Read the court decisionRead the full story...Reprinted courtesy of
Brian Perlberg, ConsensusDocs CoalitionMr. Perlberg may be contacted at
bperlberg@ConsensusDocs.org
Congratulations to BWB&O’s Las Vegas Team on Obtaining Summary Judgment for the Firm’s Landowner Client!
August 03, 2022 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPBremer Whyte Brown & O’Meara, LLP is proud to announce Partner Anthony Garasi, Senior Associate Madeline Arcellana, and Associate Laura Rios successfully won a Motion for Summary Judgment (“MSJ”), while also defeating two competing MSJs filed by Plaintiff, and ultimately obtaining a full dismissal of their landowner client against claims of premises liability.
Plaintiff, who sued both BWB&O’s client (the landowner) and its tenant, alleged injury when he slipped and fell, while utilizing a temporary wooden board as a ramp that was placed on the subject property by the tenant, who was occupying the property subject to a lease-to-own arrangement with BWB&O’s client.
In this Motion practice, the BWB&O team successfully obtained a ruling from the Court to find that BWB&O’s client had effectively contracted to delegate its maintenance responsibilities to its tenant, and also that the tenant owed BWB&O’s client full indemnity for Plaintiff’s alleged losses.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP