Review your Additional Insured Endorsement
March 26, 2014 —
Beverley BevenFlorez-CDJ STAFFIn his blog, Construction Contractor Advisor, Craig Martin explained the importance of reviewing your additional insured endorsement. Martin pointed out that in Mississippi, the “Fifth Circuit Court of Appeals recently ruled in Woodward, LLC v. Acceptance Indemnity Insurance Company, that a general contractor, named as an additional insured, did not have coverage for claims that a subcontractor performed faulty work.” The problem “was the language in the additional insured endorsement, which provided coverage for ongoing operations, not completed operations.”
While Martin admitted that the case applies to Mississippi, he concluded that “the issue Midwestern readers should consider is the court’s conclusion that non-conformance with the plans, in essence a construction defect claim, arises from completed operations.”
Read the court decisionRead the full story...Reprinted courtesy of
Alarm Cries Wolf in California Case Involving Privette Doctrine
May 06, 2019 —
Garret Murai - California Construction Law BlogIt’s one of the most quoted phrases in legal history: “Shouting fire in a [crowded] theater.”
It comes from the U.S. Supreme Court’s landmark 1919 decision in Schenck v. U.S. and has come to stand for the proposition that not all speech, in particular dangerous speech, is protected by the First Amendment.
The next case also involves a false alarm. But not of the First Amendment kind.
In Johnson v. The Raytheon Company, Inc., California Court of Appeal for the Second District, Case No. B281411 (March 8, 2019), a false alarm investigated by maintenance engineering staff led to a Privette Doctrine claim against a property owner when a ladder on which the maintenance staff was standing slipped on wet flooring.
Johnson v. Raytheon
Lawrence Johnson worked as a maintenance engineer for ABM Facilities Services, Inc. ABM was hired by Raytheon Company, Inc. to staff the control room at one of Raytheon’s facilities in Southern California. Among other things, control room staff monitored water cooling towers owned by Raytheon to ensure that the water in the cooling towers were maintained at minimum levels.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel, Rosen, Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Louisiana Court Holds That Application of Pollution Exclusion Would Lead to Absurd Results
October 21, 2019 —
Sergio F. Oehninger & Daniel Hentschel - Hunton Insurance Recovery BlogA Louisiana court recently denied an excess insurer’s bid for summary judgment, finding that the insurer’s interpretation of a pollution exclusion would lead to “absurd results.”
Central Crude, Inc., a crude oil transporter company, experienced an oil pipeline leak, allegedly causing damage to property belonging to Columbia Gas Transmission Company. Columbia Gas sued Central Crude seeking compensatory damages and injunctive relief to compel remediation of the site. Central Crude sought coverage under a CGL primary insurance policy issued by Liberty Mutual. The insurer initially agreed to cover Central Crude’s “reasonable and necessary costs” relating to the incident, but later refused to defend or indemnify Central Crude for any costs incurred from the incident. As a result, Central Crude brought suit against Liberty Mutual and its excess insurer, Great American, to enforce coverage.
Great American moved for summary judgment arguing coverage was excluded by the excess policy’s pollution exclusion, which precludes coverage for injury “arising out of a discharge of pollutants.” Central Crude responded arguing that the exclusion’s applicability was invalidated or at least rendered ambiguous by the Following Form Endorsements, which reflect an intent to mirror the coverage afforded under the primary Liberty Mutual policy, and because coverage appears to be specifically authorized through the Premises Operations Liability Endorsement.
Reprinted courtesy of
Sergio F. Oehninger, Hunton Andrews Kurth and
Daniel Hentschel, Hunton Andrews Kurth
Mr. Oehninger may be contacted at soehninger@HuntonAK.com
Mr. Hentschel may be contacted at dhentschel@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
A Word to the Wise about Construction Defects
October 10, 2013 —
CDJ STAFFA post on The Buckner Blog suggests that “construction defects” are the scariest words for architects, engineers, and contractors. With the possible outcomes of a damaged reputation and astronomical costs, it’s not a surprise. Further, builders are using techniques that “have yet to be tested in real application over time.” As a result, “whoever has the deepest pockets or the most to lose becomes the primary target.”
While a commercial general liability policy might pay for damage caused by a construction defect, the post notes that “it does not, however, cover the costs to remedy your work.” That cost could be “greater than the actual property damages incurred.”
The post recommends a combination of transferring risk and risk control In transferring risk, the builder uses “indemnification and hold harmless agreements as well as inditional insured requirements in their construction contracts.” They advise to “request coverage as an additional insured on a primary basis.”
And then there’s risk control. “Work only with architects, engineers and contactors who have good reputations and a track record of performance. Don’t cut corners.” By some careful planning, builders might “sleep better at night.”
Read the court decisionRead the full story...Reprinted courtesy of
Appetite for Deconstruction
July 02, 2024 —
Patrick Sisson - BloombergThe death of 206 College Avenue was slow and painstaking. Over several days in January 2022, dozens of bundled-up volunteers swarmed over the three-story property, a tired wooden boarding house built in the early 1900s in Ithaca, New York. Long used as rental apartments for Cornell University students, the 13-bedroom house was set to be demolished, along with several neighboring structures of the same vintage, to make room for a new multi-use complex. But while those buildings were quickly reduced to rubble by trackhoes, the house at 206 was deconstructed, piece by piece, so that its elements could be used again.
The Catherine Commons Deconstruction Project, an effort by Cornell’s Circular Construction Lab, was a large-scale pilot designed to show how building waste can be kept out of landfills. As volunteers pulled nails out of fir, oak, and walnut boards and hauled lumber off to be sorted and redistributed, a team of eight workers with heavy machinery began meticulously sawing, slicing and removing 8-by-18-foot panels of the old building. These were trucked off to a warehouse, where they’d be taken apart and recycled.
The labor that went into this process was substantially more than a typical demolition. But it avoided the societal penalties left behind at nearly every building and demo site across the US. The sheer volume of waste generated by knocking down, adding to or renovating buildings in the US is stunning: 600 million tons of construction demolition waste annually, according to the most recent EPA estimate from 2018. Roughly 75% gets ground up into aggregate and fill, and only a small share is recycled and reused, necessitating production of new material for the next project. For scale, municipal solid waste only accounts for 300 million tons every year.
Read the court decisionRead the full story...Reprinted courtesy of
Patrick Sisson, Bloomberg
Arbitration Provisions Are Challenging To Circumvent
May 13, 2019 —
David Adelstein - Florida Construction Legal UpdatesArbitration provisions are enforceable and they are becoming more challenging to circumvent, especially if one of the parties to the arbitration agreement wants to arbitrate a dispute versus litigate a dispute. Remember this when agreeing to an arbitration provision as the forum for dispute resolution in your contract. There is not a one-size-fits-all model when it comes to arbitration provisions and how they are drafted. But, there is a very strong public policy in favor of honoring a contractual arbitration provision because this is what the parties agreed to as the forum to resolve their disputes.
By way of example, in Austin Commercial, L.P. v. L.M.C.C. Specialty Contractors, Inc., 44 Fla.L.Weekly D925a (Fla. 2d DCA 2019), a subcontractor and prime contactor entered into a consultant agreement that contained the following arbitration provision:
Any controversy or claim arising out of or relating to this Agreement or the breach thereof shall be subject to the dispute resolution procedures, if any, set out in the Prime Contract between [Prime Contractor] and the [Owner]. Should the Prime Contract contain no specific requirement for the resolution of disputes or should the [Owner] not be involved in the dispute, any such controversy or claim shall be resolved by arbitration pursuant to the Construction Industry Rules of the American Arbitration Association then prevailing, and judgment upon the award by the Arbitrator(s) shall be entered in any Court having jurisdiction thereof.
The prime contract between the owner and prime contractor did not require arbitration.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Blueprint for Change: How the Construction Industry Should Respond to the FTC’s Ban on Noncompetes
May 13, 2024 —
Matthew DeVries - Best Practices Construction LawIn a groundbreaking move aimed at fostering fair competition and empowering workers, the Federal Trade Commission (FTC) issued a final rule last week to ban noncompete agreements nationwide. This ruling may carry profound implications for the construction industry, prompting construction businesses to reassess their practices and ensure compliance while maintaining competitiveness. Let’s explore how construction companies, large and small, can navigate this regulatory shift effectively.
Noncompete clauses have long been a staple in employment contracts within the construction sector, often used to protect proprietary information and retain skilled talent. However, the FTC’s ban on noncompetes demands a reevaluation of these practices. Employers must recognize the potential consequences of noncompliance, including legal repercussions and reputational damage, and take proactive steps to adapt to the new regulatory landscape.
Communications with Employees
The FTC rule requires employers to provide a form notice of non-enforcement to all present and former employees subject to an unexpired noncompete provisions. However, given the immediate legal challenges to the FTC’s rule and the fact that the 120-day compliance window has not yet begun, there is no reason to take immediate action or begin notifying employees. Instead, business owners should wait for at least 60 days before taking concrete action in response to the rule to see if any court temporarily enjoins the effectiveness of the rule.
Read the court decisionRead the full story...Reprinted courtesy of
Matthew DeVries, Burr & Forman LLPMr. DeVries may be contacted at
mdevries@burr.com
Limiting Services Can Lead to Increased Liability
December 16, 2019 —
Christopher G. Hill - Construction Law MusingsFor this week’s Guest Post Friday Musings, we welcome Nick Pacella. Nick is an architect licensed in New York, New Jersey and Connecticut. His practice has spanned several economic swings and he has been able to reposition the eggs in his basket to make the most of each recovery. He is currently focusing on adapting existing commercial buildings to take advantage of materials and processes that promote improved energy efficiency for both the owner and the tenants. For a more colorful rendition of projects you can visit his company’s website.
I remember as a kid when the attendant at gas stations would not only clean your windows but also check the oil level of your vehicle as it was filling up with $0.25 per gallon gas. (I did say that I have seen several economic swings) These services have mostly disappeared, and to no great effect to your car since most cars go much longer between oil changes. Other than a slightly dirtier windshield it hasn’t affected your ability to drive and maintain your car.
This is not so with professional services. Architects used to include many services that are now sourced to others. Project Management, Owner’s Representatives and Program Managers now populate the landscape. In many cases they came to be because architects either did not provide the service their client’s were looking for or they allowed themselves to be put into an adversarial relationship with their clients. They were likened to foxes watching the chicken coop, especially for project management and owners representative services. Client’s have had others buzzing in their ears “are architects really going to look out for my interests above theirs?’” Of course the clients never ask if the new wave will do any better at rallying behind their interests.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com