3D Printing: A New Era in Concrete Construction
April 11, 2022 —
Zoey Zhao - Construction ExecutiveThe construction of buildings using concrete has been around since the time of the Romans. In all those centuries, concrete structures have been built using essentially the same method: forms, reinforcement, mixing, pouring, setting, repeat.
The process is costly and time-consuming. The construction of the forms alone demands dozens of workers and requires a substantial amount of lumber, keeping labor and materials costs high. Builders might save some time using prefabricated concrete blocks, but such materials are not appropriate for every construction project and carry their own expenses.
For the first time in history, builders have an alternative to traditional concrete construction methods that are more cost-effective, less expensive, more environmentally friendly and allow for a wide range of possible construction projects. Three-dimensional concrete printing for construction has emerged in the building field as a viable and efficient alternative.
Reprinted courtesy of
Zoey Zhao, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Ms. Zhao may be contacted at
zoey@aictbuild.com
Best Practices: Commercial Lockouts in Arizona
April 10, 2023 —
Patrick Tighe - Snell & Wilmer Real Estate Litigation BlogIf a tenant defaults under a commercial lease, Arizona law permits the landlord to re-take possession of the premises by locking out the defaulting tenant. However, if the landlord’s lockout is wrongful, the landlord may be liable for the damages the tenant sustains because of the wrongful lockout. To minimize such liability, here are some general best practices to follow when locking out a defaulting tenant:
- Do Not Breach the Peace. It is vital when performing a lockout to not breach the peace. What constitutes a “breach of the peace” depends on the particular circumstances at hand. For example, if a tenant arrives during the lockout and becomes angry or threatens violence, the landlord should stop performing the lockout and return at a later time. As a general rule of thumb, it is best to perform lockouts in the early morning hours or in the late evening hours when the landlord is less likely to encounter the tenant.
- Provide A Notice of Default. Many commercial leases require the landlord to provide a notice of default before the landlord can lock out a defaulting tenant. Check, double check, and triple check that the landlord followed the lease’s notice of default provisions correctly, including that the landlord sent the notices to all required parties in accordance with the time requirements set forth in the lease.
Read the court decisionRead the full story...Reprinted courtesy of
Patrick Tighe, Snell & WilmerMr. Tighe may be contacted at
ptighe@swlaw.com
White and Williams Defeats Policyholder’s Attempt to Invalidate Asbestos Exclusions
January 28, 2014 —
White and Williams LLPWhite and Williams attorneys scored a significant victory for the insurance industry on January 15, 2014, when a federal jury of four men and four women rejected a policyholder’s novel efforts to invalidate asbestos exclusions contained in insurance policies issued between February 1, 1979 and August 1, 1985.
In General Refractories Co. v. First State Ins. Co., Civil Action No. 04-CV-3509 (E.D. Pa.), General Refractories Company contended that asbestos exclusions in insurance policies issued by various insurance companies in the late 1970s and 1980s had not been submitted to the Pennsylvania Department of Insurance for approval prior to use and, therefore, were unenforceable. Holding a failure to obtain approval, by itself, would not be sufficient to render the exclusions unenforceable, the Honorable Edmund Ludwig sent the matter to trial to determine whether the Pennsylvania Insurance Commissioner implemented a policy that was uniformly executed by the Insurance Department to disapprove all asbestos exclusions between February 1, 1979 and August 1, 1985, such that the exclusions violated a “dominant public policy.”
Reprinted courtesy of Gregory LoCasale, White and Williams LLP
and
Patricia Santelle , White and Williams LLP
Ms. Santelle may be contacted at santellep@whiteandwilliams.com and Mr. LoCasale may be contacted at locasaleg@whiteandwilliams.com.
Read the court decisionRead the full story...Reprinted courtesy of
Manhattan Home Prices Jump to a Record as Buyers Compete
April 02, 2014 —
Oshrat Carmiel – BloombergManhattan apartment sales surged in the busiest start to a year since 2007, setting price records as buyers vied for a limited supply of homes for sale and deals were completed at new high-end developments.
Sales of co-ops and condominiums in the first quarter jumped 35 percent from a year earlier to 3,307, according to a report today from appraiser Miller Samuel Inc. and brokerage Douglas Elliman Real Estate. The median price climbed 19 percent to $972,428, while the the average price per square foot rose 24 percent to $1,363, the highest in 25 years of record-keeping.
Price gains are accelerating in a market where the inventory of homes for sale plummeted to record lows three times in the past year as buyer demand increased. Of the deals completed in the first quarter, 38 percent were at or above the asking price, up from 17 percent a year earlier, according to Jonathan Miller, president of New York-based Miller Samuel.
Read the court decisionRead the full story...Reprinted courtesy of
Oshrat Carmiel, BloombergMs. Carmiel may be contacted at
ocarmiel1@bloomberg.net
EPA Fines Ivory Homes for Storm Water Pollution
June 26, 2014 —
Beverley BevenFlorez-CDJ STAFF“Utah’s largest home builder [Ivory Homes] has agreed to a $250,000 fine and to take several steps…to comply with Clean Water Act requirements to control pollution associated with storm-water runoff from construction sites,” reported The Salt Lake Tribune.
David Broadbent, Ivory Homes’ chief operating officer, stated in an email to The Salt Lake Tribune: “We are proud of our environmental record, particularly our storm-water compliance record. We are the first and the only home builder in Utah to implement a robust, companywide program to safeguard against sediment from entering Utah waters as a result of home-building activities.” Furthermore, Broadbent declared that the “inspections that led to the violations notices” did not yield any evidence that their “home-building practices resulted in any sediment discharge in any amount, let alone harm, to Utah waters.”
Read the court decisionRead the full story...Reprinted courtesy of
Cal/OSHA Approves COVID-19 Emergency Temporary Standards; Executive Order Makes Them Effective Immediately
July 11, 2021 —
Leila S. Narvid - Payne & Fears LLPOn June 17, 2021, California's Occupational Safety and Health Standards Board (Standards Board) passed amended COVID-19 Emergency Temporary Standards (ETS). Gov. Gavin Newsom issued an Executive Order to make the amended ETS effective as soon as filed with the Secretary of State. The Office of Administrative Law (OAL) filed them, and the Secretary of State posted them, making the ETS effective immediately. These changes attempt to bring the ETS in alignment with recent changes to California Department of Public Health Order and the latest guidance from the Center for Disease Control (CDC). Highlights of the changes to the ETS can be found here.
Face Coverings in the Workplace; Elimination of Physical Distancing
Notably, fully vaccinated employees do not have to wear a face covering indoors except in limited circumstances. Unvaccinated workers will still need to wear face coverings indoors (unless they are alone in a room or eating and drinking) and in shared vehicles. All employees regardless of vaccination status do not have to wear masks outdoors. Unvaccinated employees must be trained that face coverings are recommended outdoors for individuals who are not fully vaccinated when six feet of physical distance cannot be maintained.
Read the court decisionRead the full story...Reprinted courtesy of
Leila S. Narvid, Payne & Fears LLPMs. Narvid may be contacted at
ln@paynefears.com
Update – Property Owner’s Defense Goes up in Smoke in Careless Smoking Case
September 21, 2020 —
Michael J. Ciamaichelo - The Subrogation StrategistProperty owners owe a duty of reasonable care to avoid causing harm to neighboring properties. In Steamfitters Local Union No. 602 v. Erie Ins. Exch., 2020 Md. LEXIS 347 (July 27, 2020) (Steamfitters Local), a matter originally discussed in a June 2019 blog post, the Court of Appeals of Maryland affirmed that, where the property owner knows or should have known that people are habitually discarding hundreds of cigarette butts into a mulch bed along the boundary of the neighboring property, the property owner owes a duty to its neighbors to prevent the risk of fire.
As discussed in Steamfitters Local, a fire originated in a strip of mulch at property owned by the Steamfitters Local Union No. 602 (Union) and caused damage to neighboring properties. The fire occurred when an unknown person discarded a cigarette butt into the mulch. Following the fire, investigators found hundreds of cigarette butts in the mulch where the fire originated. A representative for the Union acknowledged that there were more butts in the mulch “than there should have been” and that, “[i]n the right situation,” a carelessly discarded cigarette could cause a fire. The Union, however, had no rules or signs to prohibit or regulate smoking at the property, where apprentices would often gather prior to class. The insurance companies for the damaged neighbors filed subrogation actions alleging that the Union, as the property owner, failed to use reasonable care to prevent a foreseeable fire. A jury found in favor of the subrogating insurers and the defendants appealed.
Read the court decisionRead the full story...Reprinted courtesy of
Michael J. Ciamaichelo, White and Williams LLPMr. Ciamaichelo may be contacted at
ciamaichelom@whiteandwilliams.com
Seller Cannot Compel Arbitration for Its Role in Construction Defect Case<
March 01, 2012 —
CDJ STAFFThe buyer of a leaky home in Venice, California cannot be compelled to arbitration with the seller in a construction defect lawsuit, according to a decision in Lindemann v. Hume, which was heard in the California Court of Appeals. Lindemann was the trustee of the Schlei Trust which bought the home and then sued the seller and the builder for construction defects.
The initial owner was the Hancock Park Trust, a real estate trust for Nicholas Cage. Richard Hume was the trustee. In 2002, Cage agreed to buy the home which was being built by the Lee Group. Cage transferred the agreement to the Hancock Park Trust. Hancock had Richard Nazarin, a general contractor, conduct a pre-closing walk through. They also engaged an inspector. Before escrow closed, the Lee Group agreed to provide a ten-year warranty “to remedy and repair any and all damage resulting from water infiltration, intrusion, or flooding due to the fact that the door on the second and third floors of the residence at the Property were not originally installed at least one-half inch (1/2”) to one inch (1”) above the adjacent outside patio tile/floor on each of the second and third floors.”
Cage moved in and experienced water intrusion and flooding. The Lee Group was unable to fix the problems. Hume listed the home for sale. The Kamienowiczs went as far as escrow before backing out of the purchase over concerns about water, after the seller’s agent disclosed “a problem with the drainage system that is currently being addressed by the Lee Group.”
The house was subsequently bought by the Schlei Trust. The purchase agreement included an arbitration clause which included an agreement that “any dispute or claim in Law or equity arising between them out of this Agreement or any resulting transaction, which is not settled through mediation, shall be decided by neutral, binding arbitration.” The warranty the Lee Group had given to Hancock was transferred to the Schlei trust and Mr. Schlei moved into the home in May 2003.
Lindemann enquired as to whether the work done would prevent future flooding. Nazarin sent Schlei a letter that said that measures had been taken “to prevent that situation from recurring.” In February, 2004, there was flooding and water intrusion. Lindemann filed a lawsuit against the Lee Group and then added the Hancock Park defendants.
The Hancock Park defendants invoked the arbitration clause, arguing that Lindemann’s claims “were only tangentially related to her construction defect causes of action against the Lee Group.” On June 9, 2010, the trial court rejected this claim, ruling that there was a possibility of conflicting rulings on common issues of law. “With respect to both the developer defendants and the seller defendants, the threshold issue is whether there was a problem with the construction of the property in the first instance. If there was no problem with the construction of the property, then there was nothing to fail to disclose.” Later in the ruling, the trial court noted that “the jury could find there was no construction defect on the property, while the arbitration finds there was a construction defect, the sellers knew about it, and the sellers failed to disclose it.” The appeals court noted that while Hancock Park had disclosed the drainage problems to the Kamienowiczs, no such disclosure was made to Sclei.
The appeals court described Hancock Park’s argument that there is no risk of inconsistent rulings as “without merit.” The appeals court said that the issue “is not whether inconsistent rulings are inevitable but whether they are possible if arbitration is ordered.” Further, the court noted that “the Hancock Park defendants and the Lee Group have filed cross-complaints for indemnification against each other, further increasing the risk of inconsistent rulings.”
The court found for Lindemann, awarding her costs.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of