Supreme Court Eliminates Judicial 'Chevron' Deference to Federal Agency Statutory Interpretations
July 31, 2024 —
Jane C. Luxton - Lewis BrisboisWashington, D.C. (July 1, 2024) – In a much-anticipated decision, on June 28, 2024, the Supreme Court issued a sweeping opinion “overrul[ing]” a 40-year old precedent that required judges to defer to federal agency interpretations of their governing statutes when those laws were ambiguous or silent. Loper Bright Enterprises v. Raimondo, et al. No. 22-451 (2024), overruling Chevron U.S.A., Inc. v. Natural Resources Defense Council, Inc., 467 U.S. 837 (1984).
The decision means that courts will no longer give special weight to an agency’s view of the scope of its regulatory powers but must apply independent judgment in deciding “whether an agency has acted within its statutory authority.” Loper Bright, slip op. at 35. Taking pains to explain that the new ruling would not allow for reversals of cases previously decided under the Chevron doctrine, the Court left no doubt that, in the words of Justice Neil Gorsuch, “[t]oday, the Court places a tombstone on Chevron no one can miss.” Id., Gorsuch Concurring Opinion at 1.
Writing for a 6-2 majority, Chief Justice Roberts forcefully condemned the Chevron-based principle that courts should defer to a federal agency’s interpretation of the scope of its legal authority, rejecting the concept that agencies have any special expertise in statutory interpretation, a field reserved to the courts, not the executive branch, under Article III of the Constitution and the Administrative Procedure Act, 5 U.S.C. § 551 et seq.
Read the court decisionRead the full story...Reprinted courtesy of
Jane C. Luxton, Lewis BrisboisMs. Luxton may be contacted at
Jane.Luxton@lewisbrisbois.com
Look to West Africa for the Future of Green Architecture
May 16, 2022 —
Kriston Capps - BloombergIn 2014, a crowd of demonstrators stormed Burkina Faso’s National Assembly building, setting it ablaze and ending the nearly 30-year rule of President Blaise Compaoré.
A year later, Burkenabè architect Diébédo Francis Kéré was asked to imagine a new parliamentary building — one that would reflect a more democratic future for the West African nation. Kéré conceived a six-story stepped pyramid that slopes up gently from the ground, inviting citizens to gather, climb and take in views of the capital city, Ouagadougou. The ruins of the former parliament building next door would be transformed into a rainwater-collecting memorial park.
The project remains a ways off: Burkina Faso continues to struggle with political unrest, including a coup d’état in January 2022. But Kéré’s fast-growing prominence may improve the odds that his vision will eventually materialize. In March, he became the first African architect to win the Pritzker Architecture Prize, the design field’s top honor.
Read the court decisionRead the full story...Reprinted courtesy of
Kriston Capps, Bloomberg
ASCE Statement on EPA Lead Pipe and Paint Action Plan
December 27, 2021 —
Tom Smith, Executive Director - American Society of Civil Engineers (ASCE)WASHINGTON, DC. – The American Society of Civil Engineers applauds
the Lead Pipe and Paint Action Plan released yesterday by the Environmental Protection Agency to help communities across the country remove lead pipes out of their drinking water systems.
Access to clean and safe drinking water is critical to public health and economic prosperity, and ASCE's
2021 Report Card for America's Infrastructure. gave a grade of C- for the drinking water category. It is estimated that as many as 10 million American households still have lead water pipes in use, which can put at risk the health and safety of families, particularly children. For utilities, moving forward with completing an inventory of lead service lines as part of the Lead and Copper Rule is a critical step, so we can get a better national picture of the scope of the problem.
This plan will allocate nearly $3 billion from the recently passed Infrastructure Investment and Jobs Act (IIJA) to states for lead service line replacements in FY 2022 and will prioritize communities with the highest lead levels. While additional investment will be needed, it is a significant down-payment on a national shared priority of clean drinking water for all Americans. It will allow utilities of all sizes to accelerate their rate of lead pipe replacement and offer technical assistance to those communities just embarking on these types of projects.
For more information about the American Society of Civil Engineers, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
Consequential Damages Flowing from Construction Defect Not Covered Under Florida Law
November 17, 2016 —
Tred R. Eyerly -Insurance Law HawaiiInterpreting Florida law, the United States District Court found there was no duty to defend a contractor against construction defect claims. Evanston Ins. Co. v. Dimmucci Dev. Corp. of Ponce Inlet, Inc., 2016 U.S. Dist. LEXIS 123678 (M.D. Fla. Sept 13, 2016).
The insured built condominiums and townhomes. It held three successive CGL policies issued by Evanston. The "your work" exclusion in the policies barred coverage as follows:
"Property Damage" to "your work" arising out of it or any part of it and included in the "products-completed operations hazard."
This exclusion does not apply if the damaged work or the work out of which the damage arises was performed on your behalf by a subcontractor.
The insured constructed the Towers Grande Condominium. In 2012 the Towers Grande Condominium Association, Inc. initiated the underlying action alleging that the insured's failure to construct the Towers Grande properly resulted in building defects and deficiencies. Damage to the roof, generator exhaust pipe, and HVAC system was alleged. Further, water intrusion and decking/structural issues were claimed. In addition to the construction defects, the Association also alleged that the insured's faulty work led to additional damages.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Construction Defect Not an Occurrence in Ohio
November 07, 2012 —
CDJ STAFFThe Ohio Supreme Court has concluded that claims of defective construction or workmanship are not an occurrence under a general liability policy. The court looked at appellate decisions and concluded that CGL policies are not intended to insure against risks under the control and management of the insured. These risks should instead be mitigated with performance bonds.
The question was raised in the case Westfield Ins. Co. v. Custom Agri Systems, Inc. The Sixth District Court of Ohio concluded it was an “open question under Ohio law whether a CGL policy covers defective construction claims.” Westfield filed a motion, granted by the Sixth Circuit, to certify the question to the state Supreme Court. The Sixth Court additionally found that the contractual liability exclusion barred coverage in the case, issues a summary judgment to Westfield.
Read the court decisionRead the full story...Reprinted courtesy of
Homebuilding Continues to Recover in San Antonio Area
December 04, 2013 —
CDJ STAFFThere was a slowing in the third quarter, but home builders expect that 2013 will see more than 9,000 home starts in the San Antonio area. And even though the third quarter was slow, it was still about 3% above the same quarter in 2012.
And the new homes are more expensive. Jack Inselmann, a senior vice president at MetroStudy noted that “in 2011, 40 percent of housing activity was under $175,000. And here we are two years later and 31 percent is under $175,000.” He worries that people looking for homes will go to the resale market, instead of buying a new home.
Read the court decisionRead the full story...Reprinted courtesy of
Treble Damages Awarded After Insurer Denies Coverage for Collapse
July 03, 2022 —
Tred R. Eyerly - Insurance Law HawaiiThe Fourth Circuit upheld the district court's decision that a collapse was covered, but reversed the denial of treble damages to the insured. DENC, LLC v. Phila. Indem. Ins. Co., 2022 U.S. App. LEXIS 10443 (4th Cir. April 18, 2022). The district court decision was summarized
here.
DENC owned The Crest, an apartment building leased to Elon University for student housing. Philadelphia Indemnity Company insured the property. In January 2018, students gathered on a second-floor breezeway for a party. Partygoers began jumping in the breezeway, which caused an abrupt collapse. Observers noticed that the breezeway was hanging down by more that a foot.
DENC filed a claim with Philadelphia the next day. An adjuster was sent to inspect the breezeway. By that time, the city had condemned The Crest. The adjuster said that undiscovered "water damage which occurred over an extended period of time" caused the loss.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Reconstructing the Francis Scott Key Bridge Utilizing the Progressive Design-Build Method
June 04, 2024 —
Lisa D. Love - The Dispute ResolverHaving awakened on the morning of March 26 to the devastating news of the collapse of Baltimore’s Francis Scott Key Bridge after being struck by the Dali, a 984 length /52 beam foot cargo container ship, I thought of the many times I crossed the bridge as a child growing up in Washington, D.C. I also recalled Montgomery Schyler’s comments on the opening of the Brooklyn Bridge, when he stated that “the work which is likely to be our most durable monument, and to convey some knowledge of us to the most remote posterity, is a work of bare utility; not a shrine, not a fortress, not a palace, but a bridge.”
I thought of the beauty of New York’s Mario Cuomo Bridge, a 3.1-mile cable-stayed twin-span bridge with eight traffic lanes, bicycle and pedestrian paths, six lookout points and room for future rapid transit. It was completed in 2018 and constructed under a design-build procurement model[i] at a cost of $3.98 billion. Accelerated bridge construction (ABC) techniques were utilized in its construction. ABC techniques employ innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the on-site construction time that occurs when building new bridges or replacing and rehabilitating existing ones. ABC techniques improve site constructability, total project delivery time, work-zone safety for the traveling public and traffic impacts, on-site construction time, and weather-related time delays.[ii]
I also thought of the gracefulness of Boston’s Leonard P. Zakim Bunker Hill Memorial Bridge, a 0.27-mile hybrid cable-stayed steel and concrete bridge with pedestrian and bicycle access that holds 10 lanes of traffic. The Zakim Bridge was completed in 2004 at a cost of approximately $100 million as part of the $24.3 billion Big Dig.[iii] Despite its elegant, streamlined appearance, the bridge was designed to be exceptionally strong, withstand winds over 400 miles per hour and endure a magnitude 7.9 earthquake.[iv]
Read the court decisionRead the full story...Reprinted courtesy of