When Your “Private” Project Suddenly Turns into a “Public” Project. Hint: It Doesn’t Necessary Turn on Public Financing or Construction
September 28, 2017 —
Garret Murai - California Construction Law BlogIn 1931, during the Great Depression, the federal government enacted the Davis-Bacon Act to help workers on federal construction projects. The Davis-Bacon Act, also known as the federal prevailing wage law, sets minimum wages that must be paid to workers on federal construction projects based on local “prevailing” wages. The law was designed to help curb the displacement of families by employers who were recruiting lower-wage workers from outside local areas. Many states, including California, adopted “Little Davis-Bacon” laws applying similar requirements on state and local construction projects.
California’s current prevailing wage law requires that contractors on state and local public works projects pay their employees the general prevailing rate of per diem wages based on the classification or type of work performed by the employee in the locality where the project is located, as well as to hire apprentices enrolled in state-approved apprentice programs and to make monetary contributions for apprenticeship training.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Florida’s Statute of Limitations / Repose for Actions Founded on Construction Improvement Modified
April 25, 2023 —
David Adelstein - Florida Construction Legal UpdatesOn April 13, 2023, Florida’s all-important four-year statute of limitations–Florida Statute s. 95.11(3)(c)–relating to actions founded on construction of an improvement of real property was modified. This is a key statute of limitations for ALL construction practitioners because it also includes the statute of repose for latent construction defects.
At the bottom of this posting is the current version fo s. 95.11(3)(c) with the underlined section being recent additions. (They hyperlink above will identify the deletions and additions.) Important things to note:
- Statute of Repose. The statute of repose has been reduced from 10 years to 7 years. There is now an objective date for when the repose period commences: “within 7 years after the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest.”
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Effective Allocation of Damages for Federal Contract Claims
October 25, 2021 —
Dirk D. Haire, Joseph L. Cohen & Jane Han - ConsensusDocsFederal construction contracts law generally recognizes four basic methods for pricing damages: (1) Actual Cost Method (ACM); (2) Total Cost Method (TCM); (3) Modified Total Cost Method (MTCM); and (4) Jury Verdict Recovery Method (JVRM). In practice, it is difficult to obtain significant recoveries on TCM and JVRM claims, and only marginally easier on MTCM claims. That is because the courts and boards that hear federal government contracts cases have developed a clear preference for the ACM. Despite this preference, many contractors do not have systems in place to maximize their opportunity to recover damages under the ACM. This article introduces various strategies for tracking and allocating damages during project performance in a manner that will support an ACM analysis if a federal construction claim is litigated.
Background: Four Basic Methods for Pricing Damages
The four methods for pricing damages are described, below:
1. Actual Cost Method
The actual cost method claims damages based on records of “actual costs” that were documented during the performance of the contract. All additional costs must be separately recorded from the costs incurred in the normal course of contract performance. Because contractors provide the court or board with documented underlying expenses under the actual cost method, courts and boards prefer this method. However, the actual cost method may not always be feasible where a contractor is confronted with drastic changes early and often in a project.
Reprinted courtesy of
Dirk D. Haire, Fox Rothschild LLP,
Joseph L. Cohen, Fox Rothschild LLP and
Jane Han, Fox Rothschild LLP
Mr. Haire may be contacted at dhaire@foxrothschild.com
Mr. Cohen may be contacted at jlcohen@foxrothschild.com
Read the court decisionRead the full story...Reprinted courtesy of
Washington First State to Require Electric Heat Pumps
May 23, 2022 —
James Leggate - Engineering News-RecordA new ruling in Washington state that will require all new commercial buildings to use electric heat pumps is supported by environmentalists but opposed by several construction industry interests. The opposition fears the rule will have a negative impact on the cost and volume of real estate development.
Reprinted courtesy of
James Leggate, Engineering News-Record
Mr. Leggate may be contacted at leggatej@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
AB 1701 Has Passed – Developers and General Contractors Are Now Required to Double Pay for Labor Due to Their Subcontractors’ Failure to Pay
October 19, 2017 —
Clayton T. Tanaka – Newmeyer & Dillion LLPOn September 13, 2017, the California State Legislators passed a bill that would make developers and general contractors responsible for subcontractors who fail to pay their employees even though they already paid the subcontractors for the work. Assembly Bill 1701 (AB 1701), sponsored by unions who represent carpenters and other building trades, would require general contractors to “assume, and [be] liable for . . . unpaid wage, fringe or other benefit payment or contribution, including interest owed,” which subcontractors owe their employees. Despite vehement opposition from the California Building Industry Association and the Associated General Contractors of California, this bill has been submitted to the Governor and is expected to be signed into law.
NEW REQUIREMENTS
Once signed, this bill would impose the following requirements under Labor Code section 218.7:
- Applies to All Private Works Contracts That Are Entered Starting January 1, 2018.
For private works contracts entered on or after January 1, 2018, a “direct contractor” (i.e., prime contractor or contractor who has direct contractual relationship with an owner) must assume and be liable for any debt which its subcontractor or a lower tier subcontractor incurs “for [a] wage claimant’s performance of labor included in the subject of the contract between the direct contractor and the owner.” (Lab. Code, § 218.7, subds. (a)(1) and (e).)
- The Labor Commissioner and Joint Labor-Management Cooperation Committees May Bring Action to Recover Unpaid Wages on Behalf of Wage Claimants.
The California Labor Commissioner and joint Labor-Management Cooperation Committees established under the federal Labor Management Cooperation Act of 1978 (29 U.S.C. § 175a) (typically comprised of labor unions and management) may bring a civil action against the direct contractor for unpaid wages owed to a wage claimant. (Lab. Code, § 218.7, subds. (b)(1) and (3).) The Labor Commissioner may also bring its claims through administrative hearings (Labor Code section 98) or by citations (Labor Code section 1197.1). (Lab. Code, § 218.7, subd. (b)(1).)
- Third Parties That Are Owed Fringe or Other Benefit Payments or Contribution on Behalf of Wage Claimants (Labor Unions) May Bring Action.
Third parties who are owed fringe or other benefit payments or contributions on a wage claimant’s behalf (e.g., labor unions) may bring a civil action against the direct contractor for such unpaid benefit payments or contributions. (Lab. Code, § 218.7, subd. (b)(2).)
- It Does Not Confer Wage Claimants With Any Right to Sue Direct Contractors.
AB 1701 gives the Labor Commissioner, Labor-Management Cooperation Committees and the unions standing to bring an action against the direct contractor, but it does not confer any private right of action by the wage claimants against the direct contractor.
- Labor-Management Cooperation Committees and Labor Unions Shall Recover as Prevailing Plaintiffs Their Attorneys’ Fees and Costs, Including Expert Fees.
For actions brought by Labor-Management Cooperation Committees or labor unions, “[t]he court shall award a prevailing plaintiff in such an action its reasonable attorney’s fees and costs, including expert witness fees.” (Lab. Code, § 218.7, subds. (b)(2)-(3).)
- Direct Contractor’s Property May Be Attached to Pay for Judgment.
AB 1701 authorizes the attachment of direct contractor’s property to pay for any judgment that is entered pursuant to this section. (Lab. Code, § 218.7, subd. (c).)
- One-Year Statute of Limitation to Bring Action under This Section.
Actions brought pursuant to this section must be filed within one year of the earliest of: (1) recordation of a notice of completion of the direct contract; (2) recordation of a notice of cessation of the work covered by direct contract; or (3) actual completion of work covered by direct contract. (Lab. Code, § 218.7, subd. (d).)
- Rights to Receive Payroll Records and Project Award Information from Subcontractors and to Withdraw All Payments Owed for Their Failure to Comply.
Upon the direct contractor’s request, subcontractors and lower tier subcontractors must provide payroll records and project award information. (Lab. Code, § 218.7, subds. (f)(1)-(2).) Direct contractor may withhold as “disputed” all sums owed if a subcontractor does not timely provide the requested records and information without specifying what is untimely and such failure to comply does not excuse direct contractor from any liability under this section. (Lab. Code, § 218.7, subds. (f)( 3) and (i).)
- Rights to Receive Payroll Records and Project Award Information from Subcontractors and to Withdraw All Payments Owed for Their Failure to Comply.
Upon the direct contractor’s request, subcontractors and lower tier subcontractors must provide payroll records and project award information. (Lab. Code, § 218.7, subds. (f)(1)-(2).) Direct contractor may withhold as “disputed” all sums owed if a subcontractor does not timely provide the requested records and information without specifying what is untimely and such failure to comply does not excuse direct contractor from any liability under this section. (Lab. Code, § 218.7, subds. (f)( 3) and (i).)
- Further Legislative Efforts on Subdivision (h) Are Expected in 2018.
Subdivision (h), which states that “[t]he obligations and remedies provided in this section shall be in addition to any obligations and remedies otherwise provided by law . . .” (emphasis added) is potentially misleading since the author and sponsor of the bill have indicated that the bill is not intended to punish direct contractors with liquidated damages or penalties. As such, further legislative efforts on subdivision (h) are expected in 2018.
ADDITIONAL CONSIDERATIONS
While workers should be paid for the work they perform, AB 1701 would place undue burden on general contractors to monitor their subcontractors’ payroll, confirm that all wages and benefits are paid timely and withhold disputed payments from non-compliant subcontractors. General contractors would also need to caution against the chain reaction that could result from such withholding, including work stoppage, increased change order requests, and an overall increase in construction costs. Finally, general contractors would need to brace themselves for at least a year after project completion against any union or a Labor-Management Cooperation Committee actions armed with a prevailing party’s right to recover attorneys’ fees and expert fees, for previously unidentified subcontractor or sub-subcontractor workers.
STRATEGIES DEVELOPERS AND GENERAL CONTRACTORS SHOULD LOOK FOR
In anticipation of AB 1701 being signed into law and its potentially harsh effects, developers and general contractors are advised to consult their attorneys for a review and revision of their existing contracts, to develop plans for accessing and monitoring subcontractor payroll records, and to consider strategies for mitigating claims that may be brought against them, as follows:
- Execute all pending agreements
before January 1, 2018 to avoid the effects of AB 1701;
- Include an audit provision
requiring subcontractors and sub-subcontractors to provide payroll records (at minimum, information set forth in Labor Code section 226) and project award information, regularly and/or upon request, with specific deadlines for such production, as subdivision (f) does not specify what is untimely;
- Include defense and indemnity provisions
that would require subcontractors to defend and indemnify the general contractor for claims that are brought pursuant to this section arising from labor performed by employees for subcontractors and sub-subcontractors, and require subcontractors to include a similar provision in their own contracts with sub-subcontractors that would require lower tier subcontractors to also defend and indemnify the general contractor for claims arising from their respective employees’ work;
- Require subcontractors to provide a payment bond and/or a letter of credit
to satisfy claims that are made against the general contractor under this section;
- Require personal guarantees
from owners, partners or key subcontractor personnel;
- Include withholding and back-charge provisions
that would allow general contractors to withhold or charge back the subcontractors for disputed amounts, for claims brought against them, and for failure to comply with the audit, bond, and guarantee requirements.
- Consider implementing a system to confirm evidence of payments,
such as signed acknowledgment of payment by each subcontractor and sub-subcontractor employees and by third parties entitled to recover fringe and other benefit payments or contribution, possibly working with electronic billing software providers to implement such system.
Clay Tanaka is a partner in the Newport Beach office of Newmeyer & Dillion, focusing on construction, real estate, business and insurance disputes in both California and Nevada. As a licensed civil engineer, Clay has significant experience in design and construction of all types of construction projects, which he has effectively utilized in his litigation, trial and arbitration practice to obtain great results for his clients. For questions related to AB1701, please contact Clay Tanaka (clay.tanaka@ndlf.com) or Newport Beach Partner Mark Himmelstein (mark.himmelstein@ndlf.com).
Read the court decisionRead the full story...Reprinted courtesy of
Clayton T. Tanaka, Newmeyer & Dillion LLPMr. Tanaka may be contacted at
clay.tanaka@ndlf.com
Denver Council Committee Approves Construction Defects Ordinance
October 28, 2015 —
Beverley BevenFlorez-CDJ STAFFAccording to The Denver Post, the Denver City Council panel advanced a proposed construction defects ordinance proposal 5-0. While “Mayor Michael Hancock and development and business interests…say protections for homeowners have depressed construction” others, such as “homeowner groups[,] have opposed the proposal vocally.”
The Denver Post reported that under the ordinance, “a project could not be called defective in a civil action if it was built and maintained in conformance to the building code. Building code violations could be cited in a lawsuit only if they could be linked to actual damage or injury. And it would take the consent of a majority of condo unit owners to initiate a defects lawsuit.”
Read the court decisionRead the full story...Reprinted courtesy of
OSHA Again Pushes Back Record-Keeping Rule Deadline
November 30, 2017 —
Tom Ichniowski - Engineering News-RecordThe federal Occupational Safety and Health Administration is extending again—this time, by two weeks—the compliance date for its rule requiring companies to file annual electronic reports of workplace injuries and illnesses.
Read the court decisionRead the full story...Reprinted courtesy of
Tom Ichniowski, ENRMr. Ichniowski may be contacted at
ichniowskit@enr.com
Improperly Installed Flanges Are Impaired Property
February 16, 2016 —
Tred R. Eyerly – Insurance Law HawaiiAnswering certified questions from the Fifth Circuit, the Texas Supreme Court found there was no coverage for flanges that leaked after installation. U. S. Metals, Inc. v. Liberty Mutual Group, Inc., 2015 Texas LEXIS 1081 (Dec. 4, 2015).
U. S. Metals sold Exxon 350 custom-made, stainless steel, weld-neck flanges for use in refineries. Testing after installation showed the flanges leaked and did not meet industry standards. Exxon decided to replace the flanges to avoid risk of fire and explosion. For each flange, this involved stripping the temperature coating and insulation, cutting the flange out of the pipe, removing the gaskets, grinding the pipe surfaces smooth for re-welding, replacing the flange and gaskets, welding the new flange to the pipes, and replacing the temperature coating and insulation. The replacement process delayed operation of the diesel units for several weeks.
Exxon sued U.S. Metal for over $6 million as the cost of replacing the flanges and $16 million as damages for lost use of the diesel units during the process. U.S. Metals settled with Exxon for $2.2 million and then sought indemnification from its liability insurer, Liberty Mutual.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com