Google, Environmentalists and University Push Methane-Leak Detection
December 21, 2016 —
Mary B. Powers – Engineering News-RecordNational Grid, which serves New York, Massachusetts and Rhode Island, is set to be the second U.S. natural-gas utility to use technology advanced by Google Earth, the Environmental Defense Fund (EDF) and Colorado State University to boost large-scale methane-leak detection. It is launching a $3-billion effort to replace gas pipelines in New York. The technology uses cutting-edge spatial analytics methods and methane sensors, specially fitted to Google Street View cars, to identify leaks and accurately measure the amount of methane escaping.
Read the court decisionRead the full story...Reprinted courtesy of
Mary B. Powers, Engineering News-RecordENR may be contacted at
ENR.com@bnpmedia.com
Pennsylvania Court Finds that Two Possible Causes Can Prove a Product Malfunction Theory of Liability
September 29, 2021 —
Gus Sara - The Subrogation StrategistIn Allstate Ins. Co. v. LG Elecs. USA, Inc., No. 19-3529, 2021 U.S. Dist. LEXIS 127014, the United States District Court for the Eastern District of Pennsylvania considered whether plaintiff’s expert engineer’s opinion that there were two possible causes of a fire—both related to alleged product defects within a refrigerator manufactured by the defendant—was sufficient to support the malfunction theory of products liability. The court found that because both potential causes imposed liability on the product manufacturer and the expert ruled out misuse of the product, as well as all external causes of the fire, it was not necessary for the engineer to identify a specific cause under the malfunction theory. The court also found that the expert’s investigation and opinions met the criteria set forth in Daubert v. Merrell Dow Pharms., Inc., 509 U.S. 579 (1993) and the Federal Rules of Evidence and, thus, were admissible.
LG Electronics arose from a fire at the home of Thomas and Lisa Ellis. The public sector fire investigator identified the area of fire origin as the top of a refrigerator manufactured by LG Electronics USA, Inc. (LG). The Ellises filed a claim with their homeowner’s insurance carrier, Allstate Insurance Company (Insurer). Insurer retained a fire investigator and an electrical engineer to investigate the origin and cause of the fire. The fire investigator agreed with the public sector investigator that the fire originated at the top of the refrigerator. The engineer conducted a forensic inspection of the scene and ruled out all potential external ignition sources. He then examined the internal components of the refrigerator. He found arcing activity on a wire at the front top of the refrigerator. He opined that there were two possible causes of the fire: either the heater circuit insulation failed over time due to mechanical damage, or the heat from the internal light fixture ignited combustible components of the refrigerator. Since the engineer ruled out improper use of the refrigerator, he opined that the damage was caused by a manufacturing defect.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
Alexis Crump Receives 2020 Lawyer Monthly Women in Law Award
August 31, 2020 —
Alexis Crump - Lewis BrisboisLos Angeles Partner Alexis G. Crump has been recognized with a 2020 Lawyer Monthly "Women in Law Award." In receiving this honor, Ms. Crump joins an elite group of women from around the world who have influenced the legal profession with their experience and expertise.
Lawyer Monthly’s "Women in Law Awards" emerged as one of the first industry awards to celebrate the achievements and contributions made by women working globally in the legal sector and in business. Recognizing women at all levels of seniority, the publication seeks to acknowledge the challenges that female legal professionals regularly overcome to serve their clients and perform at their best.
“It is an honor to be recognized alongside so many outstanding and accomplished women. I look forward to continuing to support my colleagues in their work and participating in the global network of female attorneys,” Ms. Crump said.
Read the court decisionRead the full story...Reprinted courtesy of
Alexis Crump, Lewis BrisboisMs. Crump may be contacted at
Alexis.Crump@lewisbrisbois.com
Washington, DC’s COVID-19 Eviction Moratorium Expires
August 23, 2021 —
Zachary Kessler, Amanda G. Halter & Adam Weaver - Gravel2Gavel Construction & Real Estate Law BlogThroughout the COVID-19 pandemic, federal and local governments have adopted varying moratoria on evictions, enacted as emergency legislative protections for tenants facing eviction. The federal moratorium on eviction, promulgated by the Centers for Disease Control and Prevention (CDC), is set to expire on July 31. While the Supreme Court recently left the moratorium in place, the Court signaled that it would likely be held unconstitutional if extended and challenged again. With the sole federal moratorium expiring, state and local protections may remain in effect; however, many of these local orders are also beginning to expire. Washington, DC’s eviction moratorium, one of the most tenant-friendly pieces of emergency legislation in the country, is one such example, beginning a phaseout process that allows the pace of evictions to slowly begin throughout 2021 before a final legislative sunset in February 2022.
In response to the COVID-19 pandemic, the Council of the District of Columbia and Mayor Muriel Bowser enacted a series of public health emergency legislation. Under the Coronavirus Omnibus Emergency Amendment Act of 2020, the Council put a pause on evictions for nonpayment of rent or violations of lease provisions, prohibiting landlords from filing a complaint to evict a tenant who detained “possession of real property without right” or whose “right to possession has ceased.” Under the moratorium, the Council effectively banned residential evictions, unless a court found that a tenant had performed an “illegal act” within the rental unit, that the tenant was causing undue hardship on the health, welfare, and safety of other tenants or neighbors, or that the tenant had abandoned the premises. The moratorium and other tenant-protections were initially set to remain in place indefinitely, expiring 60 days after the end of Mayor Bowser’s declared COVID-19 emergency period.
Reprinted courtesy of
Zachary Kessler, Pillsbury,
Amanda G. Halter, Pillsbury and
Adam Weaver, Pillsbury
Mr. Kessler may be contacted at zachary.kessler@pillsburylaw.com
Ms. Halter may be contacted at amanda.halter@pillsburylaw.com
Mr. Weaver may be contacted at adam.weaver@pillsburylaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Balfour Taps Qinetiq’s Quinn as new CEO to Revamp Builder
October 15, 2014 —
Benjamin Katz and Simon Thiel – BloombergBalfour Beatty Plc (BBY) named Leo Quinn as new chief executive officer to revamp Britain’s biggest builder which has suffered from mismanaged projects and a lack of demand.
Quinn will start on Jan. 1 after five years as CEO of defense specialist Qinetiq Group Plc, Balfour Beatty said today. The executive began his career at Balfour Beatty in 1979 as a civil engineer and later worked as president of Honeywell Building Controls and CEO of banknote printer De La Rue Plc. The stock gained 5.3 percent in London trading today.
Balfour Beatty, which rejected a merger proposal from British rival Carillion Plc in August, has struggled since the global recession slashed orders and prices. Its stock had fallen 48 percent this year before today, reducing the company’s value to 1 billion pounds ($1.6 billion). In September, Balfour Beatty cut its U.K. construction-services unit’s profit forecast and said Chairman Steve Marshall plans to leave.
Mr. Thiel may be contacted at sthiel1@bloomberg.net; Mr. Katz may be contacted at bkatz38@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
Benjamin Katz and Simon Thiel, Bloomberg
Electrical Subcontractor Sues over Termination
November 13, 2013 —
CDJ STAFFMillennium Plus, Inc. has sued the contractor for the Efrain A. Duran Water Treatment Plant Facility and Rio Grande City for failing to pay money due to them and terminating the contract. According to the lawsuit, Millennium is claiming that they are owed $161,781 for their work on the water treatment facility.
According to the city, the project’s contractor was “very unsatisfied with Millennium’s work.” Although the city disclaims any involvement, Millennium claims it was a “joint enterprise.”
Read the court decisionRead the full story...Reprinted courtesy of
Homebuilders Opposed to Potential Change to Interest on Construction Defect Expenses
January 22, 2013 —
CDJ STAFFIn 2008, the Colorado Supreme Court concluded that in calculating interest on the expense of repairing construction defects would start at the time that the defect was repaired. In 2009, the Colorado State Legislature introduced a bill that would have made homeowners eligible for interest back to the purchase date of their homes. The Colorado Springs Business Journal notes that the Colorado Springs Housing and Building Association is concerned that the legislature might take up the issue again, in which case, the HBA would oppose it.
Read the court decisionRead the full story...Reprinted courtesy of
Clean Water Act Cases: Of Irrigation and Navigability
January 06, 2020 —
Anthony B. Cavender - Gravel2GavelThe federal courts have recently decided two significant Clean Water Act (CWA) cases: State of Georgia, et al. v. Wheeler, where the US District Court for the Southern District of Georgia held that the 2015 rulemaking proceeding of EPA and the U.S. Army Corps of Engineers redefining the term “Waters of the United States” in the CWA violated the Act as well as the Administrative Procedure Act; and the Ninth Circuit’s decision in Pacific Coast Federation of Fishermen’s Associations, et al. v. Glaser, where the appeals court ruled that the lower court erroneously interpreted a CWA NPDES permitting exception involving agricultural return flows.
An Absence of Navigability: State of Georgia, et al. v. Wheeler
Decided on August 21, 2019, the district court, one of the few courts to grapple with the rule’s compliance with the CWA and the Administrative Procedure Act (APA), held that the agencies’ redefinition of the terms “Interstate Waters,” “Tributaries” and “Adjacent Waters” violated the CWA by reading “navigability” out of the new definitions, or by failing to adhere to the Supreme Court’s rulings in the 2005 case of Rapanos v. United States, in particular Justice Kennedy’s concurrence regarding the application of the “significant nexus” in case-by-case adjudications as to whether a particular body of water was covered by the Act. Moreover, some provisions of the rule conflicted with the APA because they were not a logical outgrowth of the rules proposed by the agencies in 2014, and on which they solicited comments, and other determinations were not supported by a reasonable explanation. In addition, without a clear statement from Congress that it supported the rule’s effect of increasing the nature and extent of enhanced federal jurisdiction over waters subject to the CWA, the court was loathe to approve the rule. Accordingly, the rule was remanded to the agencies for additional review consistent with this decision.
This decision is of particular importance as it may well be the first case to subject this new EPA rule—the linchpin of much of EPA’s regulation under the CWA—to extended review. (Other courts have only been asked to enjoin the rule, which involves a different type of review.)
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com