A Court-Side Seat: A Poultry Defense, a Houston Highway and a CERCLA Consent Decree that Won’t Budge
March 22, 2021 —
Anthony B. Cavender - Gravel2GavelFebruary saw the usual array of significant environmental decisions and federal regulatory notices.
THE FEDERAL COURTS
U.S. Court of Appeals for the District of Columbia
Luminant Generation v. EPA
The court will be grappling with a difficult venue case governed by the Clean Air Act (42 USC Section 7607(b)). In 2013, the U.S. Court of Appeals for the Fifth Circuit decided the case of Luminant Generation v. EPA (714 F. 3d 841), in which the court upheld the affirmative defenses that were made part of the Texas State Implementation Plan (SIP) and which applied to certain unpermitted emissions from regulated sources during periods of startup, shutdown or malfunction. These defenses were challenged in the Fifth Circuit and were rejected. On the national stage, EPA has been involved in litigation over these affirmative defenses and recently excluded from a “SIP Call” the Texas program, which was carved out. This EPA decision is being challenged in the DC Circuit (see Case number 20-1115),with the State of Texas arguing as an intervenor that any issues involving Texas belong in the Fifth Circuit, and not in the DC Circuit because the Act allows regional issues to be decided in the regional federal courts.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Cal/OSHA ETS: Newest Version Effective Today
January 17, 2022 —
Amy R. Patton, Matthew C. Lewis & Rana Ayazi - Payne & FearsThe newest version of the Cal/OSHA ETS goes into effect today, Jan. 14, 2022, and will expire on April 15, 2022. A redline of the recently expired Cal/OSHA ETS and the newest Cal/OSHA ETS is available HERE. The newest Cal/OSHA ETS, which was drafted prior to Dec. 16, 2021, is already partially out-of-date based on the California Department of Public Heath’s Guidance For the Use of Masks (released Jan. 5, 2022) and the CDPH’s Guidance for Local Health Jurisdictions on Isolation and Quarantine of the General Public (released Jan. 8, 2022); these changes have been addressed in the Cal/OSHA ETS FAQs.
With all of these changes occurring (not to mention all of the litigation surrounding the now-stayed federal OSHA ETS), California employers are asking: How do I comply with the current Cal/OSHA ETS and the updated CDPH Guidance? Here are the key points to ensure you are in compliance:
- New Shorter Isolation and Quarantine Periods
Isolation: When an employee has COVID-19 (even without symptoms).
- Day 0: First day of symptoms or the day a positive test specimen was collected. Begin isolation.
- Day 1: First full day after symptoms developed or positive test specimen was collected.
- Day 5: Recommended day to take COVID-19 test.
Reprinted courtesy of
Amy R. Patton, Payne & Fears,
Matthew C. Lewis, Payne & Fears and
Rana Ayazi, Payne & Fears
Ms. Patton may be contacted at arp@paynefears.com
Mr. Lewis may be contacted at mcl@paynefears.com
Ms. Ayazi may be contacted at ra@paynefears.com
Read the court decisionRead the full story...Reprinted courtesy of
Toolbox Talk Series Recap - The Mediator's Proposal
January 21, 2025 —
Douglas J. Mackin - The Dispute ResolverIn our final edition of the year of Division 1's Toolbox Talk Series on December 19, 2024,
Matthew Argue and
Gene Witkin discussed the use of the Mediator’s Proposal to bridge any final gaps to settlement between parties to a mediation. For those unfamiliar, a Mediator’s Proposal is a settlement proposal that the mediator makes to all parties to the dispute simultaneously. Each party then advises the mediators in confidence whether they accept or reject the proposal. The Mediator will communicate to all the parties that the Mediator’s Proposal is accepted only if all parties accept.
Argue and Witkin emphasized that the Mediator’s Proposal is not a shortcut and should not be used simply to split the difference. Instead, it is a tool available to the mediator to push the parties to resolution after they have had robust negotiations, understand the strengths and weaknesses of the positions of each side, and have made progress towards at least getting within range of one another. A successful Mediator’s Proposal depends on the mediator (and the parties) having sufficient information to make a credible recommendation and creating an environment where all parties will consider the Mediator’s Proposal in good faith.
Read the court decisionRead the full story...Reprinted courtesy of
Douglas J. Mackin, Cozen O’ConnorMr. Mackin may be contacted at
dmackin@cozen.com
Court Strikes Expert Opinion That Surety Acted as a “De Facto Contractor”
November 27, 2023 —
David Adelstein - Florida Construction Legal UpdatesDesignating and admitting experts is a vital component of any construction dispute. Many construction disputes require experts. Many construction disputes can only be won with the role of an expert. Thus, experts and construction disputes go hand-in-hand. No doubt about it! Time needs to be spent on developing the right expert opinions to support your burden of proof. This means you want to designate the right expert that can credibly and reliably render an expert opinion.
It is common for one party to move to strike the testimony and expert opinions of another party. This is referred to as a Daubert motion. Sometimes the motion is about gamesmanship. Sometimes it is to see how the judge rules on the issue. Sometimes there is a legitimate reason associated with the expert opinion. And, sometimes, it is a combination of the above. Regardless of the reason, parties know the weight expert opinions can have and, therefore, treat the opinions seriously prompting the Daubert motion.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Bay Area Counties Issue Less Restrictive “Shelter in Place” Orders, Including for Construction
May 04, 2020 —
Garret Murai - California Construction Law BlogThe short story: Construction can resume. The long story: Construction can resume beginning Monday, May 4, 2020,
with extensive and detailed restrictions.
Six Bay Area Counties Loosen Shelter-in-Place Restrictions Including Allowing Construction to Resume
Earlier this week, six Bay Area counties and the City of Berkeley issued new orders requiring the use of face coverings when in public. The six Bay Area counties, which also happen to be the first counties in the nation to issue shelter-in-place orders, are Alameda, Contra Costa, Marin, San Francisco, San Mateo and Santa Clara.
When do the revised shelter-in-place orders take effect?
The revised shelter-in-place orders take effect at 11:59 p.m. on May 3, 2020 and will remain in effect until 11:59 p.m. on May 31, 2020 unless extended, rescinded, superseded, or amended. Thus, effectively, the new orders take effect on Monday, May 4, 2020.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Hundreds Celebrated the Grand Opening of the Associated Builders and Contractors of Southern California Riverside Construction Training Center
February 14, 2023 —
Associated Builders and ContractorsRIVERSIDE, Calif., Feb. 10, 2023 (GLOBE NEWSWIRE) -- Today the Associated Builders and Contractors Southern California Chapter (ABC), hosted hundreds of community members as they cut the "ribbon" of their third training center in Southern California.
"Today is a celebration, but it also represents a continued commitment by ABC and our membership to supply a skilled, trained, and safe construction workforce for Southern California," stated Nick McFayden, ABC SoCal's Board Chair.
Jon Krystafik, Vice Chairman of the Training Trust commented, "Our training facility is unique. You may have toured other facilities but with ours you will see we don't just train one craft. Here Apprentices and Craft trainees are receiving cutting edge training in Electrical, Plumbing, Low Voltage and HVAC/Sheet Metal." Krystafik added, "Our trustees had a dream 10 years ago to train residents in the inland empire. Today it is a reality!"
ABC Southern California Chapter is an association of contractors that believe in the Merit Shop Philosophy. Merit shop encourages open competition and a free enterprise approach that awards contracts and employment based solely on merit, safety, quality, and cost, regardless of labor affiliation. The chapter is one of 68 throughout the country and represents nearly 400 member companies.
Read the court decisionRead the full story...Reprinted courtesy of
A Contractual Liability Exclusion Doesn't Preclude Insurer's Duty to Indemnify
November 05, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to Traub Lieberman Straus & Shrewsberry LLP's blog, "[I]n Crownover v. Mid-Continent Cas. Co., 2014 U.S. App. LEXIS 20737 (5th Cir. October 29, 2014), the United States Court of Appeals for the Fifth Circuit withdrew its prior ruling and held that the contractual liability exclusion did not preclude an insurer’s duty to indemnify its insured for an award resulting from the insured’s defective construction."
The case involved the Crownovers who were awarded damages for "Arrow's breach of paragraph 23.1 of the construction contract." However, Arrow then filed for bankruptcy. Mid-Continent, Arrow's insurer, denied Crownovers' demand for recovery, stating that "the contractual liability exclusion applied because the arbitrator’s award to the Crownovers was based only on Arrow’s breach of paragraph 23.1 of the construction agreement." The court agreed with Mid-Continent.
Subsequently, the fifth court of appeals "reversed the district court’s ruling and awarded summary judgment in favor of the Crownovers."
Read the court decisionRead the full story...Reprinted courtesy of
Reconstructing the Francis Scott Key Bridge Utilizing the Progressive Design-Build Method
June 04, 2024 —
Lisa D. Love - The Dispute ResolverHaving awakened on the morning of March 26 to the devastating news of the collapse of Baltimore’s Francis Scott Key Bridge after being struck by the Dali, a 984 length /52 beam foot cargo container ship, I thought of the many times I crossed the bridge as a child growing up in Washington, D.C. I also recalled Montgomery Schyler’s comments on the opening of the Brooklyn Bridge, when he stated that “the work which is likely to be our most durable monument, and to convey some knowledge of us to the most remote posterity, is a work of bare utility; not a shrine, not a fortress, not a palace, but a bridge.”
I thought of the beauty of New York’s Mario Cuomo Bridge, a 3.1-mile cable-stayed twin-span bridge with eight traffic lanes, bicycle and pedestrian paths, six lookout points and room for future rapid transit. It was completed in 2018 and constructed under a design-build procurement model[i] at a cost of $3.98 billion. Accelerated bridge construction (ABC) techniques were utilized in its construction. ABC techniques employ innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the on-site construction time that occurs when building new bridges or replacing and rehabilitating existing ones. ABC techniques improve site constructability, total project delivery time, work-zone safety for the traveling public and traffic impacts, on-site construction time, and weather-related time delays.[ii]
I also thought of the gracefulness of Boston’s Leonard P. Zakim Bunker Hill Memorial Bridge, a 0.27-mile hybrid cable-stayed steel and concrete bridge with pedestrian and bicycle access that holds 10 lanes of traffic. The Zakim Bridge was completed in 2004 at a cost of approximately $100 million as part of the $24.3 billion Big Dig.[iii] Despite its elegant, streamlined appearance, the bridge was designed to be exceptionally strong, withstand winds over 400 miles per hour and endure a magnitude 7.9 earthquake.[iv]
Read the court decisionRead the full story...Reprinted courtesy of
Lisa D. Love, JAMS