Pennsylvania Court Finds that Two Possible Causes Can Prove a Product Malfunction Theory of Liability
September 29, 2021 —
Gus Sara - The Subrogation StrategistIn Allstate Ins. Co. v. LG Elecs. USA, Inc., No. 19-3529, 2021 U.S. Dist. LEXIS 127014, the United States District Court for the Eastern District of Pennsylvania considered whether plaintiff’s expert engineer’s opinion that there were two possible causes of a fire—both related to alleged product defects within a refrigerator manufactured by the defendant—was sufficient to support the malfunction theory of products liability. The court found that because both potential causes imposed liability on the product manufacturer and the expert ruled out misuse of the product, as well as all external causes of the fire, it was not necessary for the engineer to identify a specific cause under the malfunction theory. The court also found that the expert’s investigation and opinions met the criteria set forth in Daubert v. Merrell Dow Pharms., Inc., 509 U.S. 579 (1993) and the Federal Rules of Evidence and, thus, were admissible.
LG Electronics arose from a fire at the home of Thomas and Lisa Ellis. The public sector fire investigator identified the area of fire origin as the top of a refrigerator manufactured by LG Electronics USA, Inc. (LG). The Ellises filed a claim with their homeowner’s insurance carrier, Allstate Insurance Company (Insurer). Insurer retained a fire investigator and an electrical engineer to investigate the origin and cause of the fire. The fire investigator agreed with the public sector investigator that the fire originated at the top of the refrigerator. The engineer conducted a forensic inspection of the scene and ruled out all potential external ignition sources. He then examined the internal components of the refrigerator. He found arcing activity on a wire at the front top of the refrigerator. He opined that there were two possible causes of the fire: either the heater circuit insulation failed over time due to mechanical damage, or the heat from the internal light fixture ignited combustible components of the refrigerator. Since the engineer ruled out improper use of the refrigerator, he opined that the damage was caused by a manufacturing defect.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
Toolbox Talk Series Recap – Best Practices for Productive Rule 26(f) Conferences on Discovery Plans
May 13, 2024 —
Douglas J. Mackin - The Dispute ResolverIn the April 4, 2024 edition of Division 1’s Toolbox Talk Series,
Julian Ackert and
Steve Swart presented on how to prepare for and structure Rule 26(f) conferences to be more effective. While Swart and Ackert focused on the requirements of Federal Rule of Civil Procedure 26(f) regarding the requisite conference of the parties prior to a scheduling conference or scheduling order, it is worth noting that many states have substantially similar requirements.
Rule 26(f) requires the parties to (i) discuss the nature and basis of their claims or defense; (ii) make or arrange for mandatory disclosures pursuant to Rule 26(a)(1); (iii) discuss issues about preserving discoverable information (including Electronically Stored Information – “ESI”); and (iv) develop a proposed discovery plan. Swart and Ackert’s presentation focused on the preservation of ESI and the proposed discovery plan.
Read the court decisionRead the full story...Reprinted courtesy of
Douglas J. Mackin, Cozen O’ConnorMr. Mackin may be contacted at
dmackin@cozen.com
Record-Setting Construction in Fargo
November 07, 2012 —
CDJ STAFFPrairie Business reports that Fargo is experiencing the most new construction it has ever seen, totaling $434 million in value, which exceeds the previous high in 2006 of $428 million. Many of the construction starts are for single family homes, although there is also an increase in construction of apartments and townhomes.
The Home Builders Association of Fargo-Moorhead also noted that there was also a large of remodeling projects. Terry Becker, the president of the HBA, said that “remodeling is just huge right now.”
Read the court decisionRead the full story...Reprinted courtesy of
“Positive Limiting Barriers” Are An Open and Obvious Condition, Relieving Owner of Duty to Warn
June 13, 2018 —
Anthony B. Cavender - Gravel2Gavel Construction & Real Estate Law Blog On June 1, the U.S. Court of Appeals for the First Circuit decided the case of Potvin v. Speedway, Inc., a personal injury case subject to the laws of Massachusetts. In Massachusetts, environmental rules require the installation of “positive limiting barriers” at gasoline service stations to contain gasoline spills of up to 5 gallons. At a self-service station now owned by Speedway, Inc., the plaintiff, a passenger in a car being serviced, exited the car but tripped on these barriers and was injured. She sued Speedway in state court, and the case was removed to federal court.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, Pillsbury Winthrop Shaw Pittman LLPMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Battle of Experts Cannot Be Decided on Summary Judgment
June 13, 2018 —
Tred R. Eyerly - Insurance Law HawaiiWhen two competing experts disagreed on the cause of the loss, the trial court erred in granting summary judgment to the insurer. Garcia v. Firs Community Ins. Co., Fla. App. LEXIS 4237 (Fla. Ct. App. March 28, 2018).
Garcia, the homeowner, discovered water damage in his home, allegedly due to a roof leak. Garcia notified his insurer, First Community Insurance Company. A forensic engineer, Ivette Acosta, was retained by First Community to inspect the property. After the inspection, coverage was denied.
The homeowner's policy covered direct loss to property only if the loss was a physical loss. Loss caused by ""rain snow, sleet, sand or dust to the interior of a building was excluded unless a covered peril first damaged the building causing an opening in a roof or wall and the rain, snow, sleet, sand or dust enters through this opening." Loss caused by wear and tear, marring, or deterioration was also excluded.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
CA Senate Report States Caltrans ‘Gagged and Banished’ its Critics
August 06, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to the Sacramento Bee, the California Senate’s latest report said that “at least nine top experts for the new $6.5 billion San Francisco-Oakland Bay Bridge” were “’gagged and banished’” after complaining “about substandard work by the Shanghai, China, firm that built much of the span.”
According to the report, reported by the Sacramento Bee, Tony Anziano, Caltrans’ chief executive of the project, “removed or demoted quality-assurance and fabrication engineers who tried to force the contractor to fix cracked roadway welds.”
The report did not evaluate the bridge’s quality or safety, however, it “called for greater openness in large construction projects, a review of the weld problems by independent experts, and an investigation of allegations that engineering decisions were made by non-engineers.”
Read the court decisionRead the full story...Reprinted courtesy of
Just How Climate-Friendly Are Timber Buildings? It’s Complicated
February 12, 2024 —
Eric Roston - BloombergThis article is part of the Bloomberg Green series Timber Town, which looks at the global rise of timber as a low-carbon building material.
The number of people living in urban areas around the world
will swell by upwards of 2 billion over the next three decades. Many of those people will need new homes. But building those with conventional materials would unleash a gusher of carbon dioxide: Concrete, steel, glass and bricks for construction make up a combined
9% of global CO2 emissions, according to research by the United Nations Environment Program.
Enter engineered wood, a seemingly no-brainer solution.
Mass timber is not the typical lumber that has structured single-family houses in North America for decades. The wood components are strong enough to hold up an office tower or apartment block, and building with them is thought to emit much less CO2 than using standard materials. And since wood is about 50% carbon, the material itself even stores a little carbon, to boot.
Read the court decisionRead the full story...Reprinted courtesy of
Eric Roston, Bloomberg
Daily Reports – The Swiss Army Knife of Project Documentation
June 08, 2020 —
Christopher A. Henry - ConsensusDocsProject “Daily Reports” are some of the most important, yet overlooked aspects of a construction project. These reports serve many beneficial roles such as holding parties accountable to their obligations, providing the basis for an as-built schedule, recording manpower, documenting site conditions, and recording any other important and relevant information that happened on the job site that day. Daily reports can also provide information to help with claims or disputes that may arise in the future, such as noting weather delays, providing backup for future delay claims, and providing information to dispute claims made against your company. Finally, daily reports also serve as a useful communication tool during the project and a source of real time information for parties that want to know how the work is commencing on a day to day basis. Because daily reports are the “Swiss army knife” of project documentation, it is extremely important that a contractor puts for its best effort when creating them.
It is no secret that a construction project can become more chaotic as the schedule progresses. Unfortunately, when that is the case, the effort put into creating these reports drops off and sometimes the responsibility of creating such reports is thrown aside altogether. I can speak from experience. Prior to entering the practice of law, I was a project engineer for a general contractor in Atlanta. As an engineer in the field, one of my many responsibilities was to enter the daily reports. Based off this experience, below are some thoughts on how to prepare useful daily reports.
1. Check the contract. The contract you entered may set forth specific requirements for the daily reports, such as where to file them, the required format, and specific information that must be included. Complying with contractual requirements is necessary for a successful project. One word of caution for subcontractors, a subcontract will often incorporate the prime contract. If that is the case, be sure to check the prime contract for any specific language relating to daily reports.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher A. Henry, Jones Walker LLP Mr. Henry may be contacted at
chenry@joneswalker.com