No Coverage Under Ensuing Loss Provision
September 09, 2011 —
Tred R. Eyerly - Insurance Law HawaiiThe cost of removing and replacing cracked flanges to prevent future leakage was not covered as an ensuing loss under a builder’s risk policy in RK Mechanical, Inc. v. Travelers Prop. Casualty Co. of Am., 2011 U.S. Dist. LEXIS 83958 (D. Colo. Aug. 1, 2011).
The insured, RK Mechanical Inc., was a subcontractor hired to install plumbing for a residential construction project. RK was an additional insured on the general contractor’s policy with Travelers. RK installed approximately 170 CPVC flanges on the project. Subsequently, two of the flanges cracked, allowing water to overflow and causing water damage to the project. Travelers was notified of the flange failure and resulting water damage.
RK subsequently removed and replaced the two cracked flanges and began water remediation. Travelers paid for the cost of the water damage due to the cracked flanges.
RK then examined all of the flanges installed in the project and discovered many were cracked and/or showed signs of potential failure. RK removed and replaced the cracked flanges. RK tendered a claim and demand for indemnity to Travelers for these repair costs. Travelers denied the claim. RK then sued for breach of contract and declaratory relief. The parties filed cross motions for summary judgment.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
Client Alert: Absence of a Court Reporter at a Civil Motion Hearing May Preclude Appellate Review
November 26, 2014 —
Angela S. Haskins & Blythe Golay - Haight Brown & Bonesteel LLPA California Court of Appeal expressed its concern over the due process implications of reviewing a trial court's decision that incorporated reasons that were not documented due to the absence of a court reporter. In Maxwell v. Dolezal (No. B254893, filed 11/4/14), the court cautioned that although the lack of a transcript did not preclude its review of an order sustaining a demurrer, the case was an exception because the operative complaint and demurrer were sufficient to permit effective appellate review.
The plaintiff in Maxwell, acting in pro per, had filed an action for invasion of privacy and breach of contract. The plaintiff alleged that the defendant had used his photograph and website without his consent and that he did not receive the money, food and housing in exchange for the intellectual property rights per their agreement. The defendant demurred on the grounds that the complaint was uncertain and it could not be ascertained from the pleading whether the contract was written, oral, or implied. At the hearing on the demurrer, no court reporter was present. Nonetheless, the trial court's minute order explicitly sustained the demurrer "[f]or the reasons stated in open court," without further elaborating. The trial court also denied the plaintiff further leave to amend on the ground that he was unable to articulate in open court a reasonable basis for any additional allegations that would remedy the deficiencies. The court of appeal noted that it was "profoundly concerned about the due process implications of a proceeding in which the court, aware that no record will be made, incorporates within its ruling reasons that are not documented for the litigants or the reviewing court."
Reprinted courtesy of
Angela S. Haskins, Haight Brown & Bonesteel LLP and
Blythe Golay, Haight Brown & Bonesteel LLP
Ms. Haskins may be contacted at ahaskins@hbblaw.com; Ms. Golay may be contacted at bgolay@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Velazquez Framing, LLC v. Cascadia Homes, Inc. (Take 2) – Pre-lien Notice for Labor Unambiguously Not Required
May 13, 2024 —
Travis Colburn - Ahlers Cressman & SleightPre-lien Notice for Labor Unambiguously Not Required.
In January 2024, almost a year after Division 2 of the Washington Court of Appeals decided Velazquez Framing, LLC v. Cascadia Homes, Inc.,1 the Washington Supreme Court, sitting en banc, reversed and remanded the matter for further proceedings.2
The relevant background facts are that Cascadia Homes, Inc. (“Cascadia”), was a general contractor and also owned the property that was the subject matter of the underlying dispute. Cascadia wished to construct a new home on the property. Cascadia hired High End Construction, LLC (“High End”) – a framing subcontractor – to provide framing for the new home. High End, in turn, hired Velazquez Framing, LLC (“Velazquez”). Velazquez did not provide Cascadia – the owner – with notice of its statutory right to claim a lien.
Read the court decisionRead the full story...Reprinted courtesy of
Travis Colburn, Ahlers Cressman & SleightMr. Colburn may be contacted at
travis.colburn@acslawyers.com
The Year 2010 In Review: Design And Construction Defects Litigation
February 25, 2011 —
Candace Matson, Harold Hamersmith, and Helen LauderdaleThis article is the first in a series summarizing construction law developments for 2010
1. Centex Homes v. Financial Pacific Life Insurance Co., 2010 U.S. Dist. LEXIS 1995 (E.D. Cal. 2010)
After settling numerous homeowners’ construction defect claims — and more than ten years after the homes were substantially completed — a home developer brought suit against one of the concrete fabrication subcontractors for the development seeking indemnity for amounts paid to the homeowners, as well as for damages for breach of the subcontractor’s duties to procure specific insurance and to defend the developer against the homeowners’ claims. The subcontractor brought a motion for summary adjudication on the ground the developer’s claims were barred by the ten year statute of repose contained in Code of Civil Procedure Section 337.15.
The District Court agreed the developer’s claim for indemnity was barred by Section 337.15. And it held that because the damages recoverable for breach of the subcontractor’s duty to purchase insurance are identical to the damages recoverable through the developer’s indemnity claim, the breach of duty to procure insurance claim also was time-barred. The District Court, however, allowed the claim for breach of the duty to defend to proceed. The categories of losses associated with such a claim (attorneys’ fees and other defense costs) are distinct from the damages recoverable through claims governed by Section 337.15 (latent deficiency in the design and construction of the homes and injury to property arising out of the latent deficiencies).
2. UDC — Universal Development v. CH2M Hill, 181 Cal. App. 4th 10 (6th Dist. Jan. 2010)
Indemnification clauses in construction agreements often state that one party to the agreement — the “indemnitor” — will defend and indemnify the other party from particular types of claims. Of course, having a contract right to a defense is not the same as actually receiving a defense. Any indemnitor attempting to avoid paying for defense costs can simply deny the tender of defense with the hope that when the underlying claim is resolved the defense obligations will be forgotten. In the past, when parties entitled to a defense — the “indemnitees” — had long memories and pressed to recover defense costs, indemnitors attempted to justify denying the tender by claiming their defense obligations coincided with their indemnity obligations and neither arose until a final determination was made that the underlying claim was one for which indemnity was owed.
Read the full story...
Reprinted courtesy of Candace Matson, Harold Hamersmith, and Helen Lauderdale, Sheppard Mullin Richter & Hampton LLP. Ms. Matson can be contacted at cmatson@sheppardmullin.com, Mr. Hamersmith can be contacted at hhamersmith@sheppardmullin.com, and Ms. Lauderdale can be contacted at hlauderdale@sheppardmullin.com.
Read the court decisionRead the full story...Reprinted courtesy of
Contractual Fee-Shifting in Litigation: Who Pays the Price?
December 31, 2024 —
Caitlin Kicklighter - ConsensusDocsWhen disputes on a construction project escalate to litigation, general contractors may find themselves entangled in a costly and time-consuming legal battle. One important concept to understand is contractual fee-shifting under a “prevailing party” provision, which can significantly impact damages recovered in litigation. The general rule, known as the “American Rule,” requires each party to pay its own legal costs, including attorney’s fees, expert witness expenses, and other court-related costs. This differs from other legal systems where the losing party typically pays the winning party’s fees. One exception to the American Rule is contractual fee-shifting, specifically through “prevailing party” provisions, which allows for the award of attorney’s fees and costs when explicitly provided for in a contract.
This article explores this exception to the American Rule, delves into the challenges posed by prevailing party provisions, and shares tips to consider for drafting these clauses to improve clarity and minimize uncertainty in the face of litigation.
Read the court decisionRead the full story...Reprinted courtesy of
Caitlin Kicklighter, Jones Walker LLPMs. Kicklighter may be contacted at
ckicklighter@joneswalker.com
Don’t Just Document- Document Right!
February 06, 2019 —
Christopher G. Hill - Construction Law MusingsI have stated to clients on many occasions that paper is a lawyer’s best friend. Because of a recent case from the Virginia Supreme Court, I should modify that to the correct paper is a lawyer’s best friend. In Commonwealth v. AMEC Civil, LLC, AMEC sued the Virginia Department of Transportation (“VDOT”) seeking more than $21 million in damages. The Mecklenburg County Circuit Court granted AMEC almost all of its damages and found that AMEC’s notice of intent to make a claim was proper under the Virginia Code even if it was not in the proper form.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Some Coastal Cities Are Sinking Even Faster Than Seas Are Rising
June 20, 2022 —
Ditas B Lopez - BloombergRising seas have long been a threat to coastal cities. New research suggests that cities—particularly in Asia—are sinking as well, compounding the risks of frequent and severe flooding.
In Karachi, land is sinking five times as fast as the sea level is rising, according to the study published this month in Geophysical Research Letters. Manila and Chittagong, Bangladesh’s second-largest city, are sinking at 10 times the rate of the rising waters.
In China’s Tianjin, a coastal city about 150 kilometers southeast of Beijing, the ground is giving way at 20 times that speed.
In those four cities alone, the phenomenon could affect roughly 59 million residents.
Read the court decisionRead the full story...Reprinted courtesy of
Ditas B Lopez, Bloomberg
FEMA, Congress Eye Pre-Disaster Funding, Projects
November 08, 2017 —
Pam Radtke Russell - Engineering News-RecordFederal Emergency Management Agency Administrator Brock Long wants to revamp the way federal disaster funds are distributed, putting a greater emphasis on building more-resilient structures and communities before disasters strike, Long told a House panel reviewing federal response to the recent slate of disasters.
Read the court decisionRead the full story...Reprinted courtesy of
Pam Radtke Russell, ENRMs. Russell may be contacted at
Russellp@bnpmedia.com