Excess Carrier's Declaratory Judgment Action Stayed While Underlying Case Still Pending
June 11, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe federal district court determined the excess carrier's declaratory judgment action to establish it had no coverage obligations should be stayed while the underlying case was still pending. Scottsdale Ins. Co. v. Ortiz & Assocs., 2014 U.S. Dist. LEXIS 64286 (D. Ore. May 9, 2014).
The subcontractor's employee was killed on the job site when struck by a dump truck owned by the general contractor, Inland Asphalt Co. Island was sued for wrongful death. Island was an additional insured under the subcontractor's primary policy and excess policy with Scottsdale.
Inland put Scottsdale on notice of the underlying wrongful death lawsuit, but did not tender its defense to Scottsdale.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
GSA Releases Updated Standards to Accelerate Federal Buildings Toward Zero Emissions
August 12, 2024 —
The U.S. General Services AdministrationWASHINGTON — The U.S. General Services Administration (GSA) is advancing progress toward the Biden-Harris Administration's federal sustainability goals by releasing updated standards for federal buildings. P100 Facilities Standards for the Public Buildings Service establish mandatory design and construction standards and performance criteria for 300,000 federal buildings nationwide. The updated standards will help advance the adoption of cleaner, more efficient technologies for buildings; lead the way towards realizing the goals of the Federal Sustainability Plan to achieve net-zero emissions from all federal buildings by 2045; and promote the use of American-made, low carbon construction materials.
P100 requires that facilities adopt advanced energy conservation strategies and eliminate on-site fossil fuel use, directives that align with federal sustainability goals and will accelerate the transition to a clean energy economy. The industry-leading standard calls for grid-interactive efficient buildings, leverages innovative technologies through GSA's Green Proving Ground, requires the use of low-embodied carbon materials, and directs potable water reuse. These comprehensive measures ensure that new and renovated federal facilities achieve peak performance while minimizing environmental impact.
The 2024 P100 establishes exceptional benchmarks for:
- Electrification: New standards for building equipment and systems to be powered by clean energy sources.
- Embodied Carbon: Requirement to utilize low-embodied carbon materials, including salvaged, reused, regenerative, and biomimetic options.
- Energy Efficiency: Enhanced building envelope performance to minimize energy loss and improve overall efficiency.
- Grid-Interactive Efficient Buildings: New measures to support a more resilient, responsive grid.
- Water Reuse: Mandating that buildings have a 15% potable water reuse rate.
- Construction Decarbonization: Ground breaking new low-carbon methods for constructing federal buildings including clean energy operations, material salvage, and offsite assemblage.
- Labor Practices: New standards protecting workers from unfair or unsafe labor practices, ensuring supply chains are free from child and forced labor and that workers are protected from the impacts of extreme heat.
P100 is updated and published every three years. For more detailed information on the 2024 P100 and other GSA initiatives, visit www.gsa.gov/p100.
Read the court decisionRead the full story...Reprinted courtesy of
Collapse Claim Fails Due To Defectively Designed Roof and Deck
May 28, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe insured's claim for collapse of his roof and deck failed due to defective design and other exclusions under the policy. Dudar v. State Farm & Cas. Co., 2024 U.S. Dist. LEXIS 52706 (N.D. Ga. Feb. 6, 2024).
The insured submitted a claim to State Farm for damage to the roof ("Roof Claim"). State Farm's adjuster placed a ladder on the deck to access the roof and a portion of the deck collapsed. The insured then reported a claim to State Farm for damage to the deck ("Deck Claim"). The claims were denied and suit was filed.
The roof had leaked on several occasions prior to submission of the Roof Claim. On February 25, 2022, the insured discovered that a branch had cut a hole in the tarp, causing water to leak into the home. The insured performed repairs on the roof. On March 8, 2022, a storm caused more water to seep through the tarp into the ceilings and walls. Thereafter, the Roof Claim was submitted.
The damage from the leaking roof and the deck collapse were caused by rotting. The rotting, in turn, was caused by a combination of defective building design and resulting water damage from rain and storms over the years. The roof and deck were constructed to provide mutual support to one another. The roof did not contain an adequate slope, which caused water to seep down into the walls and flooring rather than to flow downward and away from the property. Over time, penetrating water caused portions of the roof, the floor, and the supporting wall between the roof and deck to rot.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
New Jersey Supreme Court Hears Insurers’ Bid to Overturn a $400M Decision
January 25, 2021 —
Lawrence J. Bracken II, Michael S. Levine & Daniel Hentschel - Hunton Andrews KurthNew Jersey’s highest court heard arguments Monday in the appeal of a ruling that the New Jersey Transit Corp.’s (“NJ Transit”) insurers are required to insure $400 million of water damage loss caused by Hurricane Sandy.
The matter stems from an insurance claim NJ Transit made after the super storm rocked the East Coast in 2012. NJ Transit claimed over $400 million in losses as a result of damage to its tracks, bridges, tunnels and power stations. In response, its tower of property insurers took the position that a $100 million flood sublimit applied to limit NJ Transit’s recovery under its insurance tower, not the policy’s $400 million overall limits.NJ Transit filed a coverage action in state court. The trial court granted summary judgment to NJ Transit, holding that NJ Transit was entitled to full coverage of $400 million under the tower’s named windstorm coverage. The insurers appealed, again arguing that the flood sublimit applied to the claim.
Reprinted courtesy of
Lawrence J. Bracken II, Hunton Andrews Kurth,
Michael S. Levine, Hunton Andrews Kurth and
Daniel Hentschel, Hunton Andrews Kurth
Mr. Bracken may be contacted at lbracken@HuntonAK.com
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Hentschel may be contacted at dhentschel@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
U.S. Building Permits Soared to Their Highest Level in Nearly Eight Years
June 17, 2015 —
Michelle Jamrisko – BloombergThrough all its ups and downs, the U.S. homebuilding industry is making slow progress.
While housing starts declined 11.1 percent in May to a 1.04 million annualized rate, it followed a revised 1.17 million pace the prior month to cap the best back-to-back readings since late 2007, Commerce Department data showed Tuesday in Washington. Permits for future projects climbed to the highest level in almost eight years.
The stop-and-go nature of the rebound, which has been exacerbated by the inclement weather that brought construction to a near standstill at the start of the year, masks a steady recovery in the industry at the center of the past recession. While residential real estate has yet to fulfill its typical role as a pillar of this economic expansion, gains in hiring and bigger paychecks are brightening Americans’ moods and could lift home purchases in the second half of 2015.
Read the court decisionRead the full story...Reprinted courtesy of
Michelle Jamrisko, Bloomberg
BHA has a Nice Swing Donates to CDCCF
May 21, 2014 —
Beverley BevenFlorez-CDJ STAFFBert L. Howe & Associates (BHA) would like to congratulate the winners of the BHA Has a Nice Swing golf game for charity. With the help of the participants, BHA was able to donate $1800 to the Construction Defect Community Charitable Foundation (CDCCF). CDCCF was established to provide financial assistance for active members of the construction defect community who have uninsured expenses because of a disability, sickness, and/or the death of a community member or their immediate family member.
BHA would also like to congratulate their booth’s raffle winners. Prizes included an iPad Air, four sets of Dodger tickets, a Day at the Del Mar Races, and Best Buy gift cards.
Read how the CDCCF assists the construction defect community... Read the court decisionRead the full story...Reprinted courtesy of
CDJ’s #2 Topic of the Year: Ewing Constr. Co., Inc. v. Amerisure Ins. Co., 2014 Tex. LEXIS 39 (Tex. Jan.17, 2014)
December 31, 2014 —
Beverley BevenFlorez-CDJ STAFFEwing received quite a bit of attention around the blogosphere, and Tred R. Eyerly of Damon Key Leong Kupchak Hastert wrote a nicely succinct case summary on his blog, Insurance Law Hawaii:
“In a much anticipated decision, the Texas Supreme Court ruled that a general contractor who agrees to perform its work in a good and workmanlike manner does not "assume liability" for damages arising out of its defective work so as to trigger the Contractual Liability Exclusion.”
Read the court decisionRead the full story...Reprinted courtesy of
Narrow House Has Wide Opposition
January 17, 2013 —
CDJ STAFFA small building project on Staten Island is causing some big complaints. While many residents of the area are still dealing with the aftermath of Hurricane Sandy, residents in the Port Richmond neighborhood are concerned about a house that is being built on a lot that at its widest is only seventeen feet. On the other end, the lot is only eleven feet wide.
Initially, the Staten Island did not give permission to build on the Orange Avenue lot, but the developer went to the city’s Board of Standards and Appeals who gave permission.
The daughter of one neighbor described the foundation as looking “like a swimming pool, not a house.” Her mother’s house has a 40-foot frontage. Another neighbor (37-foot frontage) described the plans to build the narrow house as “pretty stupid.”
Work currently stopped on the building over complaints that the site’s fence was incomplete. After the developer repairs the fence, the site needs to be inspected before work continues.