Drastic Rebuild Resurrects Graves' Landmark Portland Building
September 14, 2020 —
Nadine M. Post - Engineering News-RecordFifteen minutes into a 105-minute job interview for the $195-million overhaul of the long-troubled Portland Public Service Building in Oregon’s largest city, owner’s rep Mike Day threw a curve ball to the unwitting design-build team of Howard S. Wright Construction Co. and architect DLR Group. Already hard at work solving Day’s first faux crisis scenario—a budget buster that threatened the viability of the makeover of the notoriously dysfunctional landmark—they had to regroup.
Reprinted courtesy of
Nadine M. Post, Engineering News-Record
Ms. Post may be contacted at postn@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
New Orleans Reviews System After Storm Swamps Pumps
August 17, 2017 —
Pam Radtke Russell - Engineering News-RecordThe city of New Orleans will hire an independent team of engineers to evaluate the problems that led to severe flooding following an Aug. 5 rainfall of up to 10 in. The decision followed the revelation that 16 of the city’s pumps were not working, despite claims the system was at capacity. Further, the power system that operates those pumps was severely crippled.
Read the court decisionRead the full story...Reprinted courtesy of
Pam Radtke Russell, ENRMs. Russell may be contacted at
Russellp@bnpmedia.com
Fourth Circuit Questions EPA 2020 Clean Water Act 401 Certification Rule Tolling Prohibition
August 10, 2021 —
Karen C. Bennett - Lewis BrisboisLast week, in North Carolina Department of Environmental Quality v. Federal Energy Regulatory Commission, the Fourth Circuit Court of Appeals suggested that Congress did not intend for the states, or tribes, to take final action on Clean Water Act (CWA) Section 401 applications within a year of filing. The opinion conflicts with the Environmental Protection Agency's (EPA) 2020 final rule that sought to limit state and tribal certifying authorities’ ability to delay federal projects through various tolling schemes. 85 Fed. Reg. 42210 (Jul. 13, 2020).
EPA’s rule, codified in existing regulations, states that the CWA imposes a strict one-year deadline for certification decisions, otherwise certification is waived. However, the Fourth Circuit’s view suggests that this waiver is not triggered in cases where the certifying authority has acted on the application, even if it takes longer than a year to make a final certification decision. The court ultimately decided the case on other grounds, leaving a resolution on the statutory interpretation question for another day.
Read the court decisionRead the full story...Reprinted courtesy of
Karen C. Bennett, Lewis BrisboisMs. Bennett may be contacted at
Karen.Bennett@lewisbrisbois.com
Transportation Officials Make the Best of a Bumpy 2020
January 18, 2021 —
Jim Parsons & Aileen Cho - Engineering News-RecordThe year 2020 provided a bumpy budgetary ride for all modes of transportation, and some industry insiders don’t expect airport and transit ridership to return to pre-pandemic levels for years. Agencies are taking lessons learned, coupled with hopes for the new Biden administration, to carry on as best they can.
Reprinted courtesy of
Jim Parsons, Engineering News-Record and
Aileen Cho, Engineering News-Record
Ms. Cho may be contacted at choa@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Business Risk Exclusions Bar Coverage for Construction Defect Claims
June 28, 2013 —
Tred EyerlyThe federal district court assumed there was "property damage" caused by an "occurrence," but found the business risk exclusions barred coverage for construction defect claims. Hubbell v. Carney Bros. Constr., 2013 U.S. Dist. LEXIS 68331 (D. Colo. May 13, 2013).
The plaintiffs entered a construction contract with the insured general contractor to build a home. After the project was one-third completed, plaintiffs terminated the contract. Experts hired by plaintiffs found a failure to properly site the residence, as the house was constructed 48 feet from the intended location; violations of county height restrictions; failure to follow building plans, which were themselves deficient; and an improperly poured foundation. The experts estimated that the costs of repairing the property to be between $1.3 and $1.5 million, and that the cost of demolishing the structure and rebuilding it would be between $1.1 and $1.3 million.
After plaintiff filed suit, a stipulated judgment of $1.952 million was entered.
Read the court decisionRead the full story...Reprinted courtesy of
Tred EyerlyTred Eyerly can be contacted at
te@hawaiilawyer.com
Connecticut Supreme Court Further Refines Meaning of "Collapse"
January 13, 2020 —
Tred R. Eyerly - Insurance Law HawaiiConnecticut courts have been inundated with collapse cases the past couple of years due to insureds' living in homes that were constructed with defective concrete manufactured by J.J. Mottes Concrete Company. In a duo of cases, the Connecticut Supreme Court responded to a certified question from the U.S. District Court, holding that collapse required that the building be in imminent danger of falling down. Vera v. Liberty Mut. Fire Ins. Co., 2019 Conn. LEXIS 339 (Conn. Nov. 12, 2019).
Plaintiffs had resided in their home since 2009. The home was built in 1993. In August 2015, after learning about the problem of crumbling basement walls affecting homes in their community due to cement manufactured by Mottes, they retained a structural engineer to evaluate their basement walls. The engineer found spider web cracking approximately 1/16 of an inch wide in the basement walls and three small vertical cracks. There were no visible signs of bowing. The engineer did not find that the walls were in imminent danger of falling down, but recommended that the basement walls be replaced.
Plaintiffs submitted a claim under their homeowners policy to Liberty Mutual. The claim was denied. The policy did not define collapse, but stated that collapse did not include "settling, cracking, shrinking, bulging or expansion."
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Michigan Supreme Court Concludes No Statute of Repose on Breach of Contract
July 19, 2011 —
CDJ STAFFJudge Marilyn Kelly of the Michigan Supreme Court has remanded the case of Miller-Davis Co. v. Ahrens Constr. Inc. (Mich., 2011) to the Court of Appeals, after determining that the court had improperly applied the statute of repose. She reversed their judgment, pending a new trial.
Ahrens Construction was a subcontractor, hired by Miller-Davis to build and install a natatorium room at a YMCA camp in Kalamazoo, Michigan. After its installation, the YMCA discovered a severe condensation problem, causing moisture to “rain” from the roof. The architect, testifying for Miller-Davis, alleged that the problems were due to improper installation by Ahrens. Ahrens claimed that the condensation problem was due to a design error.
When the roof was removed and reconstructed, the moisture problem ended. Ahrens argued that the alleged defects were caused by the removal. Further, in trial Ahrens raised the issue of the statute of repose. The court found in favor of Miller-Davis and did not address the statute of repose.
The Court of Appeals reversed the trial court, determining that the statute of repose had barred the suit. This rendered the other issues moot.
The Michigan Supreme concluded that the issue at hand was “a suit for breach of contract,” and that the Michigan statute of repose is limited to tort actions. They remanded the case to the Court of Appeals to address the issues that had been mooted by the application of the statute of repose.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Reversing Itself, West Virginia Supreme Court Holds Construction Defects Are Covered
July 31, 2013 —
Tred Eyerly, Insurance Law HawaiiThe West Virginia Supreme Court previously held that construction defects were not covered under a CGL policy. The Court, however, reversed itself in Cherrington v. Erie Ins. Prop. & Cas. Co., 2013 W.Va. LEXIS 724 (W.V. June 18, 2013).
The underlying complaint against the general contractor alleged various defects in the plaintiff’s recently constructed house, including an uneven concrete floor, water infiltration through the roof and chimney joint, a sagging support beam, and numerous cracks in the drywall walls and partitions throughout the house. Erie Insurance denied coverage. The insured general contractor sued, but the trial court found that faulty workmanship was not sufficient to give rise to an “occurrence.”
The West Virginia Supreme Court reversed its prior rulings determining there was no coverage for construction defects. The court recognized its prior position was in the minority, as is Hawaii's position on coverage for construction defects. See Group Builders Inc. v. Admiral Ins. Co., 123 Haw. 142, 148, 231 P.3d 67, 73 (Haw. Ct. App. 2010). Now joining the majority position, the West Virginia Supreme Court found that defective workmanship causing property damage was an “occurrence” under a CGL policy. Further, the homeowner had demonstrated that she sustained "property damage" as a result of the allegedly defective construction of her home.
The trial court also determined that the business risk exclusions barred coverage. Again, the West Virginia Supreme Court disagreed.
Read the court decisionRead the full story...Reprinted courtesy of
Tred EyerlyTred Eyerly can be contacted at
te@hawaiilawyer.com