Using the Prevention Doctrine
April 22, 2019 —
David Erhart - Gordon & Rees Construction Law BlogThe following scenario happens regularly in the construction industry. A contractor on a project reaches out to a subcontractor to perform work. Excited about the prospect of performing the work, the subcontractor signs a contract and puts it nose to the grindstone. After dutifully completing the work the subcontractor turns to the contractor and asks to be paid. But, the contractor refuses saying that there is a provision in the subcontract that says the contractor is only obligated to pay the subcontractor if the contractor receives payment from the owner. So the contractor has completed the work, but has no money to show for it.
One potential remedy for a subcontractor in this situation is the use of the prevention doctrine. “Under the prevention doctrine, ‘if a promisor prevents or hinders fulfillment of a condition to his performance, the condition may be waived or excused.’” Cox v. SNAP, Inc., 859 F.3d 304, 308 (4th Cir. 2017) (quoting Moore Bros. Co. v. Brown & Root, Inc., 207 F.3d 7171, 725 (4th Cir. 2000)). “Put simply, ‘where a party to a contract is the cause of the failure of the performance of the obligation due him or her, that party cannot in any way take advantage of that failure.’” Haddon Hous Assocs v. United States, 711 F.3d 1330, 1338 (Fed. Cir. 2013) (quoting Restatement (Second) of Contracts § 245; Williston, § 39:4).
Read the court decisionRead the full story...Reprinted courtesy of
David Erhart, Gordon & Rees Scully MansukhaniMr. Erhart may be contacted at
derhart@grsm.com
Update: Supreme Court Issues Opinion in West Virginia v. EPA
August 03, 2022 —
Anne Idsal Austin, Shelby L. Dyl & Sheila McCafferty Harvey - PillsburyTakeaways
- The Supreme Court sided with a coalition of states and coal mining companies constraining EPA’s ability to regulate CO2 emissions from power plants.
- The Supreme Court’s deployment of the “major questions doctrine” could have far-reaching implications for agencies’ authority to take actions that are politically and economically significant.
- The Court also announced a broad interpretation of standing, finding that the challengers could bring their suit notwithstanding EPA’s announced nonenforcement of the Clean Power Plan and intent to engage in a rulemaking to replace it.
Introduction
On June 30, 2022, the Supreme Court issued its opinion in West Virginia v. EPA, invalidating the 2015 Obama-era Clean Power Plan (CPP). Chief Justice John Roberts delivered the opinion of the court, holding that Section 111(d) of the Clean Air Act does not authorize EPA to devise emissions caps based on “generation shifting”—the approach EPA took in the CPP wherein power plants would be required to transition from higher-emitting (e.g., coal) to lower-emitting (e.g., natural-gas) to then even lower-emitting (e.g., wind and solar) electricity production.
The Court’s holding that the case was justiciable despite the Biden administration’s stated intent to repeal the Clean Power Plan and engage in a new rulemaking, as well as its deployment of the “major questions doctrine,” is likely to have far-reaching implications for legal challenges to all administrative agency actions.
Reprinted courtesy of
Anne Idsal Austin, Pillsbury,
Shelby L. Dyl, Pillsbury and
Sheila McCafferty Harvey, Pillsbury
Ms. Austin may be contacted at anne.austin@pillsburylaw.com
Ms. Dyl may be contacted at shelby.dyl@pillsburylaw.com
Ms. Harvey may be contacted at sheila.harvey@pillsburylaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Housing Inventory Might be Distorted by Pocket Listings
July 23, 2014 —
Beverley BevenFlorez-CDJ STAFFNBC News reported that pocket listings, or unadvertised listings, may be hiding the true number of homes on the market. “A so-called pocket listing is when the real estate agent signs a listing agreement with a seller but does not advertise it widely or put it in a multiple listing service, where other agents and buyers can see it,” according to NBC News.
Lawrence Yun, chief economist for the Realtors, told NBC News that he believes the perceived shortage of inventory “is due to the prevalence of pocket listings in some markets."
Pocket listings aren’t illegal. There aren’t any “hard numbers” for these unadvertised listings, and so the number of actual listings is based on conjecture by realtors.
"The conditions are ripe for this kind of approach to take," Nela Richardson, chief economist at Redfin, a real estate brokerage, told NBC News. “When there is limited inventory, an agent is able to convince a seller, because there is so much demand for housing that maybe as many eyeballs don’t need to see your home as in a traditional market.”
Read the court decisionRead the full story...Reprinted courtesy of
ASCE Joins White House Summit on Building Climate-Resilient Communities
October 09, 2023 —
The American Society of Civil EngineersRESTON, Va. – The White House Climate Policy Office hosted the Summit on Building Climate Resilient Communities today and unveiled its
National Climate Resilience Framework for communities to build more resiliently as they face increasingly severe weather events. The framework features comprehensive recommendations and opportunities for action, including partnerships between federal agencies and leading standards development organizations such as the
American Society of Civil Engineers (ASCE), to improve the resilience of buildings and other infrastructure. ASCE president Maria Lehman, P.E., was in attendance for the Summit.
ASCE's most widely adopted standard,
ASCE 7-22, is the primary reference of structural design requirements in all U.S. building codes and is updated every six years to reflect the latest data and trends presented by an ever-changing climate. Its most recent update, published in 2022, includes updates to environmental hazards used for building design including new wind speeds along the hurricane coastline, a completely new chapter for tornado loads, and the most substantial update to its chapter on flood loads since the inception of ASCE 7-22 – calling for structures to be built to withstand 500-year floods rather than the previous standard of 100-year flood mitigation.
Although modern codes and standards, such as ASCE 7-22, can mitigate climate hazards, many communities throughout the U.S. have not yet adopted these practices. The new White House framework calls for ensuring federal funding requires climate-resilient infrastructure investments by encouraging government at all levels to adopt consensus-based engineering standards, which would go a long way towards addressing vulnerabilities posed by future climate impacts.
ASCE, in conjunction with industry leaders represented at the Summit, supports federal efforts to improve climate data, enforce the most stringent codes and standards, and provide technical assistance to building and infrastructure stakeholders. To learn more about environmental hazard mitigation resources, follow
ASCE's Pathways to Resilient Communities Toolkit, a plain-language guide for federal, state, and local leaders as they seek out standards, best practices, data, and strategies that can be implemented to safeguard communities across the country from increasingly severe weather events.
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
Expired Contract Not Revived Due to Sovereign Immunity and the Ex Contractu Clause
September 15, 2016 —
David R. Cook Jr. – AHHC Construction Law BlogA few months ago, a decision by the Supreme Court of Georgia in Georgia Department of Labor v. RTT Associates, Inc. provided a strict rule for contractors who work with state agencies to determine whether a state agency has waived its sovereign immunity. The issue as framed by the Court was “whether an agency’s waiver of immunity from a breach of contract claim as a result of entering into a written contract remains intact in the event the contract is extended without a written document signed by both parties expressly amending the contract, as required by its terms.”
The case involved a contract executed on March 1, 2012, by a contractor, RTT Associates, Inc. (RTT), and the Georgia Department of Labor (DOL), whereby RTT was to develop certain computer software for the DOL by the completion date, June 30, 2012. The contract required that amendments be in writing and fully executed by both parties. Time was of the essence and RTT’s obligation under the contract survived the expiration or termination of the contract.
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook Jr., Autry, Hanrahan, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
Home Numbers Remain Small While Homes Get Bigger
June 28, 2013 —
CDJ STAFFCatherine Rampell reports in the New York Times that while the number of single-family homes built in 2012 was still at the very bottom of the range, since the government starting recording this data in 1973, the medium size for these homes is at its largest ever. According to data collected by the Census Bureau, these homes also have more bedrooms and bathrooms than previously. Of all homes built in 2012, forty-one percent had four or more bedrooms and thirty percent had three or more bathrooms. Both of these were the highest percentages in those categories.
Meanwhile, the size of newly-built rental units declined in 2012. While still larger than the average rental unit built in 1999 (the earliest date given in the article), there has been little change over the last decade. During the same period, the size of sale units in multi-family buildings did show an increase.
Read the court decisionRead the full story...Reprinted courtesy of
Tenth Circuit Reverses District Court's Ruling that Contractor Entitled to a Defense
October 24, 2023 —
Tred R. Eyerly - Insurance Law HawaiiAfter the district court granted the insured contractor's motion for judgment on the pleadings on the duty to defend, the Tenth Circuit found there was no coverage and reversed. Owners Ins. Co. v. Greenhalgh Planning & Development, Inc., 2023 U.S. App. LEXIS 20137 (10th Cir. Aug. 4, 2023).
Greenhalgh remodeled a house and barn for Michelle and Steven Pickens. After completion of the project, the Pickens sold the property to Teague and Michelle Cowley. The Cowleys later sued the Pickenses asserting various fraud and breach of contract claims. The complaint alleged that the Pickenses misled them into reasonably believing that the barn was a habitable structure, even though it did not qualify as such under the applicable building code because it lacked a fire-sprinkler system.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Failure to Comply with Contract Leaves No Additional Insured Coverage
January 07, 2015 —
Tred R. Eyerly – Insurance Law HawaiiIndemnity obligations and additional insured coverage were at issue in Strauss Painting, Inc. v. Mt. Hawley Ins. Co., 2014 N.Y. LEXIS 3347 (N.Y. Nov. 24, 2014).
Strauss Painting, Inc. (Strauss) contracted with the Metropolitan Opera Association, Inc. (the Met) to strip and repaint the rooftop steel carriage track for the opera house's automated window-washing equipment. The contract provided that Strauss would indemnify and hold the Met harmless. Exhibit D to the contract set forth three types of insurance that Strauss was to procure: (1) workers' compensation; (2) owners and contractors protective liability (OCP); and (3) comprehensive general liability. The OCP policy was to add the Met as an additional insured. Strauss failed to obtain the OCP policy.
At the time it contracted with the Met, Strauss had a CGL policy issued by Mt. Hawley. The policy's additional insured endorsement (ICO form CG 20 33 07 04) stated that "an insured" included "any organization for whom Strauss is performing operations when Strauss and such organization have agreed in writing that such organization be added as an additional insured."
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com