Loss Ensuing from Alleged Faulty Workmanship is Covered
July 19, 2017 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court found that under Montana law, water damage resulting from alleged faulty workmanship in repairing the insured's roof was covered. Leep v. Trinity Universal Ins Co., 2017 U.S. Dist. LEXIS 86759 (D. Mont. June 6, 2017).
The insured's property was damaged in a hail storm. The insured contracted with Sprauge to repair the hail damage. Sprauge tore off and replaced roof lining and shingles. Sprague replaced a vent cap and tubes, but did not replace any vent piping or vents. The contract between the insured and Sprauge provided it was the owners' responsibility to check the exhaust vents for all furnaces and water heaters after the roofing project was completed.
Subsequent to the repairs, water was found dripping from a bathroom fan. Moisture was also found on the second story emanating from the ceiling. Finally, in the attic, the furnace vent piping was disconnected and the furnace exhaust was venting into the attic.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly - Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Reconciling Prompt Payments and Withholding of Retention Payments
March 30, 2016 —
Eric J. Rollins, Esq. – Newmeyer & Dillion, LLPIt is common in California for the owners of a project to make monthly payments to a contractor for work as it is completed, but withhold a certain percentage as a guarantee of future satisfactory performance. Contractors almost always pass these withholdings on to their subcontractors. Unsurprisingly, disputes can arise regarding when the withheld retentions must be paid.
Civil Code section 8814, subdivision (a), states that a direct contractor must pay each subcontractor its share of a retention payment within ten days after receiving all or part of a retention payment. However, an exception exists -- a direct contractor may withhold from the retention paid to a subcontractor an amount not in excess of 150 percent of the estimated value of the disputed amount, whenever a “good faith dispute exists between the direct contractor and a subcontractor.” (See Cal. Civ. Code, § 8814, subd. (c).) The problem with the statute is that it offers no help in defining a “good faith dispute,” and the California courts have historically not provided much guidance either. Can a “good faith dispute” be any dispute between the contracting parties, e.g., a dispute regarding change orders, mismanagement, etc.? Or must the dispute relate specifically to the retention? Unfortunately for California litigants, the answer may depend on the appellate district in which the parties find themselves.
Read the court decisionRead the full story...Reprinted courtesy of
Eric J. Rollins, Esq., Newmeyer & Dillion, LLPMr. Rollins may be contacted at
eric.rollins@ndlf.com
Idaho District Court Affirms Its Role as the Gatekeeper of Expert Testimony
March 15, 2021 —
Melissa Kenney - The Subrogation SpecialistMany subrogation claims involving fire losses rely heavily on expert testimony. Expert testimony is admissible under Federal Rule of Evidence 702 if it is both relevant and reliable. In Daubert v. Merrell Dow Pharmaceuticals, Inc., 509 U.S. 579 (1993), whose standard has been incorporated into Federal Rule of Evidence 702, the Supreme Court instructed federal trial courts to act as a “gatekeeper” of expert testimony, giving them the power to exclude expert testimony that is not supported by sufficient evidence. In Maria Fernanda Elosu and Robert Luis Brace v. Middlefork Ranch Incorporated, Civil Case No. 1:19-cv-00267-DCN, 2021 U.S. Dist. LEXIS 14449 (D. Idaho Jan. 22, 2021) (Brace), the United States District Court for the District of Idaho exercised its gatekeeper role when it granted in part and denied in part the defendant’s motion to exclude expert testimony pursuant to Daubert and Federal Rule of Evidence 702.
Brace, involved a fire at a vacation cabin in McCall, Idaho. The cabin, owned by Maria Elosu (Elosu) and Robert Brace (Brace and collectively with Elosu, Plaintiffs) was part of a homeowner’s association called Middlefork Ranch, Incorporated (MFR). The cabin had a “wrap around” deck with a propane-fired refrigerator on the north side. On the day before the fire, Brace stained the deck using an oil-based stain. That night, Elosu smoked cigarettes on the deck. The next morning, Plaintiffs used rags to clean up excess oil from the deck and an MFR employee changed the propane on the refrigerator and relit the pilot light. At 4:00 p.m., a fire started in or around the cabin while no one was home. The fire was discovered by a group of contractors who testified that the fire was isolated to the east side of the cabin when they first arrived. Importantly, one witness testified that there was no fire and no flames around the propane-fired refrigerator. The fire destroyed the cabin and the contents within.
Read the court decisionRead the full story...Reprinted courtesy of
Melissa Kenney, White and Williams LLPMs. Kenney may be contacted at
kenneyme@whiteandwilliams.com
Construction Defect Lawsuits Hinted for Dublin, California
February 07, 2013 —
CDJ STAFFWithout naming the community, the blog Around Dublin says that a condo community in Dublin, California may be prepping for a construction defect lawsuit. According to the article, the problems include a façade peeling away from the building, cracks in walls and granite countertops, and issues with both the HVAC systems and the plumbing. The homeowners association is said to have insufficient reserve funds to address the problems.
Read the court decisionRead the full story...Reprinted courtesy of
A Place to Study Eternity: Building the Giant Magellan Telescope
October 15, 2024 —
Jeff Rubenstone - Engineering News-RecordSituated on a remote mountaintop in the Atacama Desert in Chile, the Giant Magellan Telescope will one day allow astronomers to peer further into the universe with a greater degree of clarity than ever before. But siting a highly sensitive instrument with seven massive, 8.4-meter-dia mirrors on a windy peak in one of the world’s most seismically active regions takes careful engineering, especially since the 12-story upper section of the 22-story telescope enclosure will have to rotate 360° with an extreme degree of precision, multiple times a night.
Reprinted courtesy of
Jeff Rubenstone, Engineering News-Record
Mr. Rubenstone may be contacted at rubenstonej@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
BHA at The Basic Course in Texas Construction Law
October 21, 2015 —
CDJ STAFFBert L. Howe & Associates, Inc., (BHA) is proud to be partnering with the State Bar of Texas, Construction Law Section, as a sponsor and exhibitor at The Basic Course in Texas Construction Law to be held November 12 & 13, 2015 at The Westin Austin at The Domain.
With offices in San Antonio and Houston, Bert L. Howe & Associates, Inc., offers the experience of over 20 years of service to carriers, defense counsel, and insurance professionals as designated experts in over 5,500 cases. BHA’s staff encompasses a broad range of licensed and credentialed experts in the areas of general contracting and specialty trades, as well as architects, and both civil and structural engineers, and has provided services on behalf of developers, general contractors and subcontractors.
BHA’s experience covers the full range of construction defect litigation, including single and multi-family residential (including high-rise), institutional (schools, hospitals and government buildings), commercial, and industrial claims. BHA also specializes in coverage, exposure, premises liability and delay claim analysis.
As the dynamic litigation climate in Texas continues to change, and as the number of construction defect and other construction-related cases continues to rise and become more sophisticated, it is more important than ever for contractors and builders to be aggressive in preparing for claims before they are made, and in defending against those claims once they are filed.
Since 1993, Bert L. Howe & Associates, Inc., has been an industry leader in providing construction consulting services, and has been a trusted partner with builders and insurance carriers, both large and small, in Texas and across the Western United States.
Register for the Basic Course...
Read the court decisionRead the full story...Reprinted courtesy of
Court of Appeals Issues Decision Regarding Second-Tier Subcontractors and Pre-Lien Notice
February 06, 2023 —
Travis Colburn - Ahlers Cressman & SleightVelazquez Framing, LLC (“Velazquez”) v. Cascadia Homes, Inc. (“Cascadia”) is a Court of Appeals, Division 2 case where the primary issue on appeal was whether a second tier subcontractor was required to provide pre-lien notice under RCW 60.04 for its labor.
The defendant, Cascadia, was the general contractor that planned to build a home on property it owned in Lakewood, Washington.[1] High End Construction, LLC (“High End”), submitted a bid to Cascadia for framing work on the home. High End began work on Cascadia’s home, but later subcontracted with Velazquez to complete the framing work.[2] Velazquez did not submit a prelien notice for its work on Cascadia’s home, and Cascadia claimed it was unaware that High End subcontracted with Velazquez for framing at the project.
High End invoiced Cascadia and was paid for its work, but High End never paid Velazquez. Subsequently, Velazquez recorded a lien for both labor and materials, and later filed a complaint to foreclose its lien. Cascadia, due to the fact Velazquez did not provide it with prelien notice, moved for summary judgment, arguing prelien notice was required under RCW 60.04.031(1)[3] and the labor portion of a lien cannot be segregated where a subcontractor’s lien includes both labor and materials. Velazquez argued that no prelien notice was required under RCW 60.04.021[4] and RCW 60.04.031 and claimed that subcontractors can segregate the labor portion from the materials portion. The trial court granted Cascadia’s motion and ruled Velazquez did not fall within one of the exceptions for prelien notice in RCW 60.04.031(2), and therefore, could not enforce the lien. Velazquez appealed.
Read the court decisionRead the full story...Reprinted courtesy of
Travis Colburn, Ahlers Cressman & SleightMr. Colburn may be contacted at
travis.colburn@acslawyers.com
Fire Damages Unfinished Hospital Tower at NYU Langone Medical Center
December 15, 2016 —
Jeff Rubenstone – Engineering News-RecordA fire broke out Dec. 14 at a hospital tower under construction at NYU Langone Medical Center in New York City. The blaze sent a column of thick black smoke up through the Manhattan skyline.
Read the court decisionRead the full story...Reprinted courtesy of
Jeff Rubenstone, Engineering News-RecordMr. Rubenstone may be contacted at