Tennessee Looks to Define Improvements to Real Property
January 27, 2020 —
Lian Skaf - The Subrogation StrategistFor subrogation practitioners dealing with an installation-based statute of repose, knowing what is an improvement to real property is the first battle in what can, but does not have to be, a long fight. Like many other states, Tennessee’s statute of repose bars claims based on improvements to real property. Tennessee’s statute of repose runs four years after substantial completion of the improvement. See Tennessee Code Ann. § 28-3-202. In the case of Maddox v. Olshan Found. Repair & Waterproofing Co. of Nashville, L.P., E A, 2019 Tenn.App. LEXIS 464, 2019 WL 4464816, the Court of Appeals of Tennessee examined whether or not the work done by the defendant, Olshan Foundation Repair & Waterproofing Co. of Nashville, L.P., E.A. (Olshan) — which addressed bowing walls, cracks in the foundation and walls and water intrusion — qualified as improvements to real property for the purposes of the statute of repose. The court held that the work by Olshan essentially amounted to repairs, and did not qualify as improvements to real property.
In Maddox, the plaintiff, Rachel Maddox (Maddox), noticed cracking in her home in 2005 and hired Olshan to assess the issue and conduct necessary repairs. Olshan made several recommendations and the parties agreed on Olshan’s proposal for the price of $27,000. From their initial work in 2005 until late 2011, Olshan visited the property several times to address ongoing structural issues with the home. Eventually, eight months after Olshan told Maddox they could not fix the house and failed to return her phone calls, Maddox filed suit, alleging fraud against the company.
After a three-day bench trial, the trial court found in favor of the plaintiff for $187,000, plus $15,0000 in punitive damages. Among other holdings, the court rejected Olshan’s statute of repose defense. Olshan appealed, raising the statute of repose issue again.
Read the court decisionRead the full story...Reprinted courtesy of
Lian Skaf, White and Williams LLPMr. Skaf may be contacted at
skafl@whiteandwilliams.com
'Right to Repair' and Fixing Equipment in a Digital Age
August 30, 2021 —
Jeff Rubenstone - Engineering News-RecordWhen a piece of equipment breaks down on site, rental agreements, subcontractor contracts and other arrangements generally make it clear who gets to open the hood and start tinkering. But heavy equipment made in the last two decades increasingly relies on digital components for many basic functions. Embedded computer systems oversee electronically controlled hydraulics and regulate engine behavior and emissions-control systems. The tools to access these firmware and software systems are not always easy to come by, and in some cases repairs can’t be done without working directly with a manufacturer-approved dealer or technician. Some repairs may require a digital handshake to take effect.
Reprinted courtesy of
Jeff Rubenstone, Engineering News-Record
Mr. Rubenstone may be contacted at rubenstonej@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Don’t Spoil Me: Oklahoma District Court Rules Against Spoliation Sanctions
January 08, 2024 —
Kyle Rice - The Subrogation StrategistIn Okla. Farm Bureau Mut. Ins. Co. v. Omega Flex, Inc., No. CIV-22-18-D, 2023 U.S. Dist. LEXIS 197755, the United States District Court for the Western District of Oklahoma (the District Court) determined spoliation sanctions were not warranted after a home was demolished for repair following a joint scene examination.
The insurer, Oklahoma Farm Bureau Mutual Insurance Company (Insurer) provided a policy of insurance to Michael and Sondra Diel (the Diels). On July 11, 2020, the Diels’ home was struck by lightning and their attic caught fire. Following the loss, Insurer retained both counsel and fire origin and cause experts to inspect the Diels’ property. Insurer’s counsel informed in-house counsel for Omega Flex, Inc. (Omega Flex) via a letter dated July 14, 2020, that a preliminary investigation indicated the fire may have been caused by an Omega Flex product—specifically, TracPipe Corrugated Stainless Steel Tubing (CSST). Insurer’s counsel invited Omega Flex to inspect the property, noting: “It is anticipated that the loss will exceed $300,000” and stating that any inspection “must be completed during the next two weeks.
At that time, the homeowner will proceed with demolition to rebuild.” (Emphasis added).
Read the court decisionRead the full story...Reprinted courtesy of
Kyle Rice, White and WilliamsMr. Rice may be contacted at
ricek@whiteandwilliams.com
Virtual Mediation – How Do I Make It Work for Me?
December 21, 2020 —
Adrian L. Bastianelli, III & Jennifer Harris - Peckar & Abramson, P.C.Mediation took the construction industry by storm in the late 1980’s and has become a staple for resolving construction claims. Today, most construction contracts, including the ConsensusDocs, require mediation as a condition precedent to binding dispute resolution, whether it be arbitration or litigation. As a result, many construction executives have spent long hours sitting in conference rooms trying to reach resolution with their counterpart through mediation in order to avoid the alternative – costly arbitration or litigation that often produces an unsatisfactory result.
While many businesses have foreclosed the possibility of meeting in person due to the COVID-19 pandemic, the contractual requirements for mediation remain. Thus, in most cases, in-person or live mediation is no longer an option; however, attorneys and mediators have developed a virtual process to replace the live process. With a new process comes many questions: Does the virtual process work? What are the best practices and pitfalls for virtual mediation? Will virtual mediation continue when COVID-19 fades away? How do I make virtual mediation work for me? The answers to these questions and more are discussed below.
Reprinted courtesy of
Adrian L. Bastianelli, III, Peckar & Abramson, P.C. and
Jennifer Harris, Peckar & Abramson, P.C.
Mr. Bastianelli may be contacted at abastianelli@pecklaw.com
Ms. Harris may be contacted at jharris@pecklaw.com
Read the court decisionRead the full story...Reprinted courtesy of
South Carolina Homeowners May Finally Get Class Action for Stucco Defects
December 04, 2013 —
CDJ STAFFLast year, Judge J. Michael Baxley approved a class action lawsuit over stucco problems in Sun City Hilton Head. The lawyers from S.C. State Plastering have already settled with about 140 defendants in that community, and they are trying to prevent the plaintiff’s lawyers from communicating with other residents. In June, a judge dismissed S.C. State Plastering’s request to block this communication, but the company has appealed.
The South Carolina Supreme Court has heard the case regarding the notices and has yet to rule. The Chief Justice has recused herself, stating that she has a connection to the case, although she has not elaborated.
Many homeowners have waited to repair their homes, hoping to receive compensation. Pulte Homes, the builder of the project, has also repaired some homes. It is not clear if those homeowners are eligible for the class action lawsuit.
Read the court decisionRead the full story...Reprinted courtesy of
Bert L. Howe & Associates Brings Professional Development Series to Their Houston Office
May 19, 2014 —
Beverley BevenFlorez-CDJ STAFFBHA’s Professional Development Series provides seminar attendees with a heightened level of knowledge and understanding on a wide range of subjects covering construction and construction defect litigation, tailored to the unique needs of local counsel and insureds.
The next seminar in this series, THE RESIDENTIAL CONSTRUCTION PROCESS & CONSTRUCTION DEFECT LITIGATION, will be presented on June 13th.
This course has been approved for Minimum Continuing Legal Education credit by the State Bar of Texas Committee on MCLE in the amount of 1.0 credit hours, of which 0.0 credit hours will apply to legal ethics/professional responsibility credit.
The seminar will be presented by Don MacGregor, general contractor and project manager, at BHA’s Houston office during the noontime hour, and luncheon will be provided. As with all BHA Professional Development activities, there is no cost for participation.
Water intrusion through doors, windows and roofing systems, as well as soil and foundation-related movement, and the resultant damage associated therewith, are the triggering effects for the vast majority of homeowner complaints today and serve as the basis for most residential construction defect litigation.
The graphic and animation-supported workshop/lecture activity will focus on the residential construction process, an examination of associated damages most often encountered when investigating construction defect claims, and the inter-relationships between the developer, general contractor, sub trades and design professionals.
Typical plaintiff homeowner/HOA expert allegations will be examined in connection with those building components most frequently associated with construction defect and claims litigation.
The workshop will examine:
* Typical construction materials, and terminology associated with residential construction
* The installation process and sequencing of major construction elements, including interrelationship with other building assemblies
* The parties (subcontractors) typically associated with major construction assemblies and components
* The various ASTM standard testing protocols utilized to field test buildings
* An analysis of exposure/allocation to responsible parties
Attendance at THE RESIDENTIAL CONSTRUCTION PROCESS & CONSTRUCTION DEFECT LITIGATION seminar will provide the attendee with:
* A greater understanding of the terms and conditions encountered when dealing with common construction defect issues
* A greater understanding of contractual scopes of work encountered when reviewing construction contract documents
* The ability to identify, both quickly and accurately, potentially responsible parties
* An understanding of damages most often associated with construction defects, as well as a greater ability to identify conditions triggering coverage
* Assistance in the satisfaction of important continuing education requirements.
Course #: 901290467
Sponsor #: 14152
BHA Houston Office
800 Town & Country Blvd.
Suite 300
Houston, TX 77024
To register for the event, please email Don MacGregor at dmac@berthowe.com.
Read the court decisionRead the full story...Reprinted courtesy of
History of Defects Leads to Punitive Damages for Bankrupt Developer
March 01, 2012 —
CDJ STAFFThe South Carolina Court of Appeals has ruled that evidence of construction defects at a developer’s other projects were admissible in a construction defect lawsuit. They issued their ruling on Magnolia North Property Owners’ Association v. Heritage Communities, Inc. on February 15, 2012.
Magnolia North is a condominium complex in South Carolina. The initial builder, Heritage Communities, had not completed construction when they filed for bankruptcy protection under Chapter 11. The remaining four buildings were completed by another contractor. The Property Owners’ Association subsequently sued Heritage Communities, Inc. (HCI) alleging defects. The POA also sued Heritage Magnolia North, and the general contractor, BuildStar.
The trial court ruled that all three entities were in fact one. On appeal, the defendants claimed that the trial court improperly amalgamated the defendants. The appeals court noted, however, that “all these corporations share officers, directors, office space, and a phone number with HCI.” Until Heritage Communities turned over control of the POA to the actual homeowners, all of the POA’s officers were officers of HCI. The appeals court concluded that “the trial court’s ruling that Appellants’ entities were amalgamated is supported by the law and the evidence.”
Heritage also claimed that the trial court should not have allowed the plaintiffs to produce evidence of construction defects at other Heritage properties. Heritage argued that the evidence was a violation of the South Carolina Rules of Evidence. The court cited a South Carolina Supreme Court case which made an exception for “facts showing the other acts were substantially similar to the event at issue.” The court noted that the defects introduced by the plaintiffs were “virtually identical across all developments.” This included identical use of the same products from project to project. Further, these were used to demonstrate that “HCI was aware of water issues in the other projects as early as 1998, before construction on Magnolia North had begun.”
The trial case ended with a directed verdict. Heritage charged that the jury should have determined whether the alleged defects existed. The appeals court noted that there was “overwhelming evidence” that Heritage failed “to meet the industry standard of care.” Heritage did not dispute the existence of the damages during the trial, they “merely contested the extent.”
Further, Heritage claimed in its appeal that the case should have been rejected due to the three-year statute of limitations. They note that the first meeting of the POA was on March 8, 2000, yet the suit was not filed until May 28, 2003, just over three years. The court noted that here the statute of limitation must be tolled, as Heritage controlled the POA until September 9, 2002. The owner-controlled POA filed suit “approximately eight months after assuming control.”
The court also applied equitable estoppel to the statute of limitations. During the time in which Heritage controlled the board, Heritage “assured the unit owners the construction defects would be repaired, and, as a result, the owners were justified in relying on those assurances.” Since “a reasonable owner could have believed that it would be counter-productive to file suit,” the court found that also prevented Heritage from invoking the statute of limitations. In the end, the appeals court concluded that the even apart from equitable tolling and equitable estoppel, the statute of limitations could not have started until the unit owners took control of the board in September, 2002.
Heritage also contested the jury’s awarding of damages, asserting that “the POA failed to establish its damages as to any of its claims.” Noting that damages are determined “with reasonable certainty or accuracy,” and that “proof with mathematical certainty of the amount of loss or damage is not required,” the appeals court found a “sufficiently reasonable basis of computation of damages to support the trial court’s submission of damages to the jury.” Heritage also claimed that the POA did not show that the damage existed at the time of the transfer of control. The court rejected this claim as well.
Finally, Heritage argued that punitive damages were improperly applied for two reasons: that “the award of punitive damages has no deterrent effect because Appellants went out of business prior to the commencement of the litigation” and that Heritages has “no ability to pay punitive damages.” The punitive damages were upheld, as the relevant earlier decision includes “defendant’s degree of culpability,” “defendants awareness or concealment,” “existence of similar past conduct,” and “likelihood of deterring the defendant or others from similar conduct.”
The appeals court rejected all of the claims made by Heritage, fully upholding the decision of the trial court.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Corps Proposes $4.6B Plan to Steel Miami for Storm Surge
June 22, 2020 —
Pam Radtke Russell - Engineering News-RecordA $4.6-billion U.S. Army Corps of Engineers proposal to protect Miami from future storm surge, largely by building massive sea walls and elevating infrastructure systems, is the latest of such plans the agency has developed for East Coast communities.
Pam Radtke Russell, Engineering News-Record
Ms. Russell may be contacted at Russellp@bnpmedia.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of