Delays in Filing Lead to Dismissal in Moisture Intrusion Lawsuit
September 09, 2011 —
CDJ STAFFThe Alabama Court of Civil Appeals has upheld a summary judgment in the case of Franklin v. Mitchell. Walter Mitchell, doing business as Southern Classic Construction built a new home for the Franklins. The Franklins moved into the home in October 2001. In April 2006 they discovered sagging floors in both the bathroom and kitchen. They contacted Mitchell who suggested the flooring might be defective. The Franklins spent eight months attempting to contact the flooring manufacturer.
In March 2007, the Franklins had the home inspected. The sagging was determined to be due to a loss of strength in the decking because of condensation from the air conditioning system. Air returns were not properly sealed and drawing moisture into the structure. There was mold on the decking and floor joints.
When Mitchell was contacted by the Franklins, he told them his one-year warranty had expired but had the HVAC subcontractor, Southern Mechanical Heating & Air (owned by Mitchell’s father, Jim Mitchell), look at the situation. SMHA replaced and braced subfloors. Later, they entered the crawl space to tape ducts, seal the air return, and insulate the air vent housing. The Franklins were not satisfied with the repairs, as not all the ducts were taped, nor were the air vent housings insulated.
Franklin complained to Walter Mitchell who again cited his one-year warranty. Jim Mitchell said he would not report complaints to his insurer, stating that the repairs were unnecessary, that the work had been done correctly in the first place, and it was only done at the request of Walter Mitchell.
In February 2009, the Franklins sued Walker Mitchell. Mitchell denied the claims, citing in part the statute of limitations. Mitchell also filed complaints against three subcontractors, including his father’s firm. Mitchell received a summary judgment as the case started after Alabama’s six-year statute of limitations.
The appeals court rejected the Franklin’s argument that the claim of damage did not start until they were aware it was due to a construction defect. The court noted that as Walter Mitchell was licensed as a “residential home builder, the statute the Franklins cite did not apply, as it concerns architects, engineers, and licensed general contactors.”
Nor did they feel that Mitchells’ claim that his warranty had expired were sufficient to override the statute of limitations, quoting an earlier case, “Vague assurances do not amount to an affirmative inducement to delay filing suit.” Their claim of subsequent negligent repairs was rejected because Mitchell did not direct the specific actions taken by his father’s firm.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Yet ANOTHER Reminder to Always Respond
July 11, 2021 —
Christopher G. Hill - Construction Law MusingsYou would think I wouldn’t have to discuss the absolute need to respond to any served pleadings, particularly after some of the prior examples of what can happen if you fail to respond. Of course, I wouldn’t be starting a post like this if those that were sued contacted an experienced attorney in a timely fashion and followed this advice.
Yet another example of the disastrous results that can occur simply from failing to file responsive pleadings occurred last year in the Eastern District of Virginia federal court in Alexandria, VA. In Pro-Telligent, LLC v. Amex Int’l, Inc. the Court considered a claim for breach of contract (among other causes of action) by Pro-Telligent against Amex. The operative facts are that Pro-Telligent was a subcontractor to Amex that claimed it was unpaid in the amount of $279,660.27, its Complaint was served on January 7, 2021, and Amex did not respond within the required 21-day window. The Court then held a hearing on February 28, 2020, regarding the validity of the Clerk of Court’s entry of default per the rules of court.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Texas Supreme Court Finds Payment of Appraisal Award Does Not Absolve Insurer of Statutory Liability
April 19, 2021 —
Allison Griswold & Sarah Smith - Lewis BrisboisThe Texas Supreme Court recently published its long-awaited decision in the Hinojos v. State Farm Lloyds. In it, the court affirmed its holding in Barbara Technologies, finding that payment of an appraisal award does not absolve an insurer of statutory liability when the insurer accepts a claim but pays only part of the amount it owes within the statutory deadline, and a policy holder can proceed with an action under the Texas Prompt Payment of Claims Act.
In 2013, Louis Hinojos made a claim for storm damage to his home. State Farm’s initial inspection resulted in an estimate below the deductible, but Hinojos disagreed and requested a second inspection. At the second inspection, the adjuster identified additional damage resulting in a payment to Hinojos of $1,995.11. Hinojos then sued State Farm – and State Farm invoked appraisal approximately 15 months after suit was filed. The appraisal resulted in State Farm tendering an additional payment of $22,974.75. State Farm moved for summary judgment, arguing that timely payment of an appraisal award precluded prompt payment (or Chapter 542) damages. The trial court granted summary judgment and Hinojos appealed (notably Barbara Technologies had not yet been decided). The Court of Appeals affirmed State Farm’s victory on the basis that “State Farm made a reasonable payment on Hinojos’s claim within the sixty-day statutory limit….” Hinojos petitioned the Texas Supreme Court for review.
Reprinted courtesy of
Allison Griswold, Lewis Brisbois and
Sarah Smith, Lewis Brisbois
Ms. Griswold may be contacted at Allison.Griswold@lewisbrisbois.com
Ms. Smith may be contacted at Sarah.Smith@lewisbrisbois.com
Read the court decisionRead the full story...Reprinted courtesy of
Insurer's Summary Judgment Motion to Reject Claim for Construction Defects Upheld
August 15, 2018 —
Tred R. Eyerly - Insurance Law HawaiiThe Third Circuit upheld the district court's order granting summary judgment in favor of the insurer on a claim seeking coverage for construction defects. Lenick Constr. v. Selective Way Ins. Co., 2018 U.S. App. LEXIS 15197 (3d Cir. June 6, 2018).
Westrum was the general contractor for a 92 unit development, and it subcontracted with Lenick to perform rough and finish carpentry and to install paneling, windows, and doors provided by the developer. After the project was completed, it was discovered that some units experienced water infiltration, leaks and cracked drywall.
The condominium development sued Westrum, alleging contract and warranty claims. Westrum impleaded Lenick, asserting claims for breach of contract and indemnification. Lenick sought a defense from its insurer, Selective. Selective defended under a reservation of rights.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
First-Time Buyers Home Sales Stagnates
October 22, 2014 —
Beverley BevenFlorez-CDJ STAFFDespite a rise overall in home sales, “first-time buyer share remained unchanged from the previous two months at 29%, far behind the historical average first-time buyer share of about 40%,” reported National Association of Home Builders’ Eye on Housing. However, “[e]xisting home sales increased to the highest level of the year, having posted gains for five of the last six months, despite weakness among first-time buyers. Existing home sales increased 2.4% in September, but remain 1.7% below the same period a year ago.”
According to Eye on Housing, existing sales is expected to continue to increase throughout the year, though the first-time buyer segment is “the weak spot.”
Read the court decisionRead the full story...Reprinted courtesy of
The “Program Accessibility” Exception for Public Entities Under the ADA
September 10, 2014 —
Garret Murai – California Construction Law BlogPublic owners, as well as private owners and tenants of commercial and retail properties, are at risk of lawsuits brought under the Americans with Disabilities Act of 1990 (“ADA”) and related state law alleging that their facilities are not accessible by those with disabilities.
A common misperception among private owners and tenants is that facilities constructed before the ADA went into effect in 1992 are exempt or “grandfathered” from the ADA’s requirements. Not so. At least generally. If, however, you are a public entity, there is such an exception. Lucky you.
Under the ADA, public facilities constructed prior to January 26, 1992 need not be “accessible to and usable by individuals with disabilities” so long as a public entity’s “service[s], program[s] and activit[ies], when viewed in [their] entirety, [are] readily accessible to and usable by individuals with disabilities.” Known as “program accessibility,” the exception has left many public entities scratching their heads as to what they can and must do.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Kronick Moskovitz Tiedemann & GirardMr. Murai may be contacted at
gmurai@kmtg.com
2015-2016 California Labor & Employment Laws Affecting Construction Industry
October 28, 2015 —
Steven M. Cvitanovic, David A. Harris, & Kristen Lee Price – Haight Brown & Bonesteel LLPEarlier this month, California Governor Jerry Brown signed dozens of bills that affect employers. Many of these bills have special significance to the construction industry. Here is a brief review:
Assembly Bill 219 – Prevailing Wages for Concrete Delivery on Public Projects
AB 219 continues California’s aggressive expansion of prevailing wages. This bill expands the definition of “public works” for purposes of state prevailing wage law to include the hauling or delivery of ready-mixed concrete for a public works project.
Previously, delivery drivers hired by a material supplier were exempted from the prevailing wage. Before AB 219, labor law made a distinction between “suppliers” and “contractors.” Thus, ready-mixed concrete was held to be a finished product, and treated differently from a product that was assembled on site. The new law eliminates this distinction.
Reprinted courtesy of Haight Brown & Bonesteel attorneys
Steven M. Cvitanovic,
David A. Harris and
Kristen Lee Price
Mr. Cvitanovic may be contacted at scvitanovic@hbblaw.com
Mr. Harris may be contacted at dharris@hbblaw.com
Ms. Price may be contacted at kprice@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Illinois Favors Finding Construction Defects as an Occurrence
September 23, 2019 —
Ashley L. Cooper - SDV InsightsA recent Illinois Appellate Court’s decision in, Acuity Ins. Co. v. 950 West Huron Condominium Owners Association, 2019 IL App (1st) 180743 (2019), strengthens Illinois’ precedent favoring construction defects as an occurrence under a Commercial General Liability (“CGL”) insurance policy. Acuity also broadens an insurance carrier’s obligation to defend its insured against construction defect allegations.
In Acuity, the court determined whether claims for construction defect filed against a subcontractor, triggered a duty to defend under a CGL policy. To make its determination, the court focused on the subcontractor’s scope of work. The court notes that a subcontractor normally contracts for a discrete scope of work on a project. Unlike a general contractor, who has control over or contractual obligations for all aspects of the project, a subcontractor does not have those board responsibilities. The court explained that “[f]rom the eyes of the subcontractor, the ‘project’ is limited to the scope of its own work, and the precise nature of any damage that might occur to something outside of that scope is as unknown or unforeseeable as damage to something entirely outside of the construction project.”
Accordingly, the court in Acuity held that when a complaint alleges that a subcontractor’s negligence caused damage to a part of the construction project outside of the subcontractor’s scope of work, the allegations are enough to trigger the insurer’s duty to defend the subcontractor under a CGL policy. The court’s decision in Acuity relied on a similar Illinois Appellate Court decision, Milwaukee Mut. Ins. Co. v. J.P. Larsen, Inc., 956 N.E.2d 524 (Ill. App. 2011). In Larsen, the court reached a similar conclusion where a third-party complaint by a general contractor against a subcontractor alleged that the subcontractor’s improper window caulking caused water intrusion and property damage to other parts of the building. The court in Larsen held that because the complaint alleged not only construction defects, but also damage to other property outside the subcontractor’s scope of work, the insurer had a duty to defend the subcontractor.
Read the court decisionRead the full story...Reprinted courtesy of
Ashley L. Cooper, Saxe Doernberger & Vita, P.C.Ms. Cooper may be contacted at
alc@sdvlaw.com