Insured's Collapse Claim Survives Summary Judgment
October 28, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer's motion for summary judgment seeking to dispose of the insured's claim for collapse was denied. Life Skills, Inc. v. Harleysville Ins. Co., 2024 U.S. Dist. LEXIS 143658 (D. Mass. Aug. 13, 2024).
Life Skills was a non-profit social service agency providing residential and day habilitation services to adults with autism and intellectual and developmental disabilities. The head office was covered by a policy issued by Harleysville with building coverage limits of $3,038,300.
Damage occurred in a ceramics classroom located in the basement of the building. The floor sank between eight to twelve inches in the northeast corner. The ceramics classroom contained two large kilns weighing approximately 200 pounds.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Why Federal and State Agencies are Considering Converting from a “Gallons Consumed” to a “Road Usage” Tax – And What are the Risks to the Consumer?
August 26, 2015 —
Roger Hughes – California Construction Law Blog“‘We’re going to have to find another way to finance the upkeep of the roads,’ Gov. Jerry Brown said earlier this year in rolling out his 2015 budget. Governor Brown gave no specifics, but last fall he signed a law that set up a commission to study a ‘road usage charge’ with a call to ‘establish a pilot program by Jan. 1, 2017…'” – San Jose Mercury News, January 27, 2015
This Change, It’s a Coming (Maybe)
Many states and the federal government are seriously considering converting from a “gallons consumed” tax levy to a “miles driven” program for determining gasoline tax. There are several compelling reasons for such a change. First, our roads are falling apart while revenue from current highway taxes fall woefully short of our current and projected needs. In the meantime, the number of miles driven by all-electric cars that pay no gas tax, is increasing rapidly; and by hybrids that pay substantially reduced tax; and worse for the taxing authorities, by increasingly efficient gas-powered cars. All of this means rapidly dropping gas tax revenues. Seeing this trend, local, state and the federal governments are making a major push to convert from a consumption based tax to a “miles driven” tax. This a good thing for those of us that believe increased investment in our transportation infrastructure is of high national concern.
Read the court decisionRead the full story...Reprinted courtesy of
Roger Hughes, Wendel Rosen Black & Dean LLPMr. Hughes may be contacted at
rhughes@wendel.com
Insurer Not Required to Show Prejudice from an Insured’s Late Notice When the Parties Contract for a Specific Reporting Period
September 09, 2019 —
Christopher Raney - Gordon & Rees Insurance Coverage Law BlogThe Fifth Circuit Court of Appeals recently affirmed an order granting summary judgment in favor of the Firm’s insurer client on an issue of first impression in Texas. The issue before the trial court was whether, under Texas law, an insurer is required to demonstrate prejudice resulting from an insured’s failure to comply with an agreed term set in an endorsement to the parties’ insurance contract establishing a specific time limit for an insured to give the insurer notice of a claim.
The case involved alleged damage to an insured’s commercial property from a hailstorm. The insured did not report the alleged loss to its insurer until approximately 17 months after the date of loss. The insurer denied the claim based on a one-year notice requirement in a policy endorsement. The Texas Windstorm or Hail Loss Conditions Amendment Endorsement stated that:
In addition to your obligation to provide us with prompt notice of loss or damage, with respect to any claim where notice of the claim is reported to us more than one year after the reported date of loss or damage, this policy shall not provide coverage for such claims.
The insured sued the insurer in Houston federal court, alleging causes of action for breach of contract and violations of the Texas Insurance Code. The insured argued the insurer was required to show prejudice from the insured’s late notice; the insurer argued that a showing of prejudice was not required. The trial court recognized that this issue had not been decided by the Texas Supreme Court of the Fifth Circuit Court of Appeals.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher Raney, Gordon & Rees Scully MansukhaniMr. Raney may be contacted at
craney@grsm.com
Naples, Florida, Is Getting So Expensive That City Workers Can’t Afford It
April 10, 2023 —
Amanda Albright - BloombergThe city of Naples on Florida’s Gulf Coast is paradise on Earth, if you believe those slick websites that rank the best US cities to live in or retire in. But if you talk with the people who work in its hospitals, restaurants and city government, you’ll get another story. They’d like to live in Naples, too, but most of them can’t afford to.
The city of 19,000 is home to the second-richest ZIP code in the US, after Miami Beach. Median household income stood at about $125,000 in 2021, compared with about $62,000 in Florida overall, according to the Census Bureau. Naples landed on a 2022 list of least affordable places for renters compiled by the National Apartment Association.
Amid a dearth of reasonably priced housing, at least 90% of city employees live outside Naples. Job vacancies are going unfilled, leading to chronic staffing shortages. The shortfall among firefighters, police officers and other essential workers in Collier County, which includes Naples, verges on unsafe, according to one local advocate. Private-sector employers have converted a hotel into apartments for workers as a temporary fix.
Read the court decisionRead the full story...Reprinted courtesy of
Amanda Albright, Bloomberg
Spearin Doctrine: Alive, Well and Thriving on its 100th Birthday
January 15, 2019 —
John P. Ahlers - Ahlers Cressman & Sleight PLLCOn December 9, 2018, United States v. Spearin, [1] a landmark construction law case, will be 100 years old. The Spearin “doctrine”[2] provides that the owner impliedly warrants the information, plans and specifications which an owner provides to a general contractor. The contractor will not be liable to the owner for loss or damage which results from insufficiencies or defects in such information, plans and specifications.
Some construction lawyers questioned whether the Spearin doctrine was still viable in Washington after the Washington Court of Appeals decided the recent case of King County v. Vinci Constr. Grand Projets.[3] Some concerned contractor industry groups even considered a “statutory fix” in the wake of the Court of Appeals Vinci decision. It is our opinion that the facts in the Vinci case are distinguishable and the Spearin doctrine is alive and thriving in Washington.
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers Cressman & Sleight PLLCMr. Ahlers may be contacted at
john.ahlers@acslawyers.com
Steps to Curb Construction Defect Actions for Homebuilders
June 15, 2017 —
Jason Daniel Feld – Kahana & Feld, LLPThe homebuilding and construction industries in California are at a record high in 2017 according to the National Homebuilders Association. While there is finally prosperity and growth for builders, developers and contractors after suffering from the recession of 2008, there is also a growth in construction defect claims. As with every industry and especially with construction, there are several risk prevention methods that can help curb this litigation.
Time Frames for Pursuing Construction Defect Claims
It is important to know and understand the time frames for which construction defect claims can be pursued by homeowners. There is a hard cut-off for construction defect litigation in California known as the Statute of Repose of 10 years. California Code of Civil Procedure (“CCP”) §337.15 provides a statute of repose that bars actions to recover damages for construction defects more than 10 years after substantial completion of the work of improvement. This provision is limited to property damage claims and does not extend to personal injuries (See, Geertz v. Ausonio, 4 Cal.App.4th 1363 (1992) and willful misconduct or fraudulent concealment claims. (See, Acosta v. Glenfed Development Corp., 128 Cal.App. 4th 1278 (2005).
There are also interim statutes of limitations for “patent” and “latent” defects discovered at the home also from the date of substantial completion. CCP §337.1(e) provides for a four year window to bring suit for deficiencies that are apparent by reasonable inspection (patent deficiencies). CCP §337.15(b) provides for deficiencies that are not apparent by reasonable inspection or hidden defects that require invasive testing to become apparent (latent deficiencies). A latent defect can become patent after it “manifests itself” (i.e. becomes observant – for example a roof leak) for which the four year window from the date of discovery would become the applicable statute of limitations.
The discovery rule effectively acts to toll the statute of limitation period on construction defect claims until they become reasonably apparent. (See, Regents of the University of CA v.Harford Accident & Indemnity, Co., 21 Cal.3d 624, 630 (1978). This is similar to a breach of contract claim, also a four year statute of limitation. Finally, the California Right to Repair Statute (SB800) – Civil Code §§895, et seq. specifically Civil Code §896 sets forth the “Functionality Standards” or a list of actionable defect items, including items affecting the component’s “useful life” and a catch-all provision for all items not expressed listed as defects in the statute. (Civil Code §897). The majority of the defects alleged have a 10 year statute of limitations. However, there are shortened statute of limitations for the following items:
Functionality Standards | Statute of Limitations |
Noise Transmission |
1 year from original occupancy of adjacent unit |
Irrigation |
1 year from close of escrow |
Landscaping Systems & Wood Posts (untreated) |
2 years from close of escrow |
Electrical systems, pluming/sewer systems, steel fences (untreated), flatwork cracks |
4 years from close of escrow |
Paint/Stains |
5 years from close of escrow |
All other functionality standards (Civil Code §941(a)) |
10 years after substantial completion(date of recordation of valid NOC) |
Preventative Measures to Curb Construction Defect Litigation
Once the builder knows the time frames for construction defect claims, the following are some preventive measures to limit construction defect claims. As a reminder, homeowners are less likely to bring construction defect action if they feel that the builders are taking care of them.
1. Communicate With Homeowners Prior to Claims
It is imperative to communicate with the homeowners throughout the ten years statute of repose period. For example, most builders provide a limited warranty to the homeowners at the time of purchase. Homeowners are generally confused as to the length of the warranty and what the warranty covers. A practical tip to help curb construction defect claims is for the builder to send postcards or letters to the homeowners at the six month, one year and nine-year marks to advise the homeowner of: (1) the existence of the warranty and what is covered at each time frame; (2) the maintenance obligations of the homeowner at the various time frames; and (3) the fact that the home is approaching the ten-year mark. Most builders would rather deal directly with the homeowners through customer service than defend a construction defect litigation action where the costs to defend the claim will vastly exceed the cost to address the individual homeowner issues. The more the builder communicates with the homeowner in advance, the less likely it is that the homeowner engages in litigation against the builder.
2. Timely Response to Homeowner Claims
During the purchase process, provide the homeowners instructions on how to send in a customer service or warranty requests. Provide multiple methods for notification to the builder by the homeowner when issues arise in their home (fax, email, website forms, etc.). The builder should provide a timely response – within 48 hours of the notice if possible. The homeowner wants to receive some notification from the builder that they received their request and, at the very least, will investigate the claim. Even if it is determined to be a maintenance item or homeowner caused damage, the homeowner should receive: (1) an acknowledgement of the claim; (2) an investigation report of the issue; and (3) an action plan or conclusion statement – this can be a declination of repairs with an explanation as to the cause not being the result of original construction. Sometimes even sending a customer service representative to the home to listen to the homeowner claims and explaining that there are not repairs required is sufficient to satisfy the homeowner. The goal is to make sure the homeowner’s claims are acknowledged and that the builder is standing behind its product. In my experience, the fact that the builder failed to respond in a timely fashion to the homeowner is a significant motivating factor as to why the homeowner elected to enter formal litigation against the builder.
3. Be Proactive When Litigation Ensues Despite the fact that the homeowner has engaged an attorney and joined a construction defect action, the builder is not precluded from continuing to communicate with its homeowners. Several builders send letters to the non-plaintiff homeowners reminding them to contact the builder should they have issues at their homes rather than join the ongoing construction defect action. Under the law, clients can always talk to clients even if they are represented by counsel. While the attorneys for the builders cannot speak to the represented construction defect homeowners, the builder can communicate directly with its homeowners offering to honor its warranty and customer service procedures in lieu of the homeowner proceeding with the litigation. Both of these builder attempts to communicate with homeowners post-litigation have a dual effect – some homeowners elect to contact the builder to effectupate repairs and drop the litigation; while others elect to continue with the litigation. So proceed cautiously in this regard.
It is noted, there are many motivating factors for homeowners to bring a lawsuit against homebuilders that have nothing to do with the construction practices or customer service and are merely economically driven. However, these small steps in addition to providing solid construction practices should help curb construction defect litigation by homeowners.
Jason Daniel Feld is a founding partner of Kahana & Feld LLP, an AV Preeminent boutique litigation firm in Orange County specializing in construction defect, insurance defense, employment and general business litigation matters. The firm was founded with the goal of providing high-quality legal services at fair and reasonable rates. The firm believes that what defines attorneys is not their billing rates, but their record of success, which speaks for itself. For more information, please visit: www.kahanafeld.com.
Read the court decisionRead the full story...Reprinted courtesy of
Under Privette Doctrine, A Landowner Delegates All Responsibility For Workplace Safety to its Independent Contractor, and therefore Owes No Duty to Remedy or Adopt Measures to Protect Against Known Hazards
September 29, 2021 —
Krsto Mijanovic, Jeffrey C. Schmid & John M. Wilkerson - Haight Brown & BonesteelIn Gonzalez v. Mathis (2021 WL 3671594) (“Gonzalez”), the Supreme Court of California held that a landowner generally owes no duty to an independent contractor or its workers to remedy or adopt other measures to protect them against known hazards on the premises. The Court applied the Privette doctrine which establishes a presumption that a landowner generally delegates all responsibility for workplace safety to its independent contractor. (See generally Privette v. Superior Court (1993) 5 Cal.4th 689; SeaBright Ins. Co. v. US Airways, Inc. (2011) 52 Cal.4th 590.) As such, the independent contractor is responsible for ensuring that the work can be performed safely despite a known hazard on the worksite, even where the contractor and its workers are unable to take any reasonable safety precautions to avoid or protect themselves from the known hazard.
In Gonzalez, the landowner, Mathis, had hired an independent contractor, Gonzalez, to clean a skylight on his roof. To access the skylight, Gonzalez needed to utilize a narrow path between the edge of the roof and a parapet wall. While walking along this path, Gonzalez slipped and fell to the ground, sustaining serious injuries. Gonzalez alleged this accident was caused by several dangerous conditions on the roof, including a slippery surface, a lack of tie-off points to attach a safety harness, and a lack of a guardrail. Gonzalez was aware of all of these hazards prior to the accident.
Reprinted courtesy of
Krsto Mijanovic, Haight Brown & Bonesteel,
Jeffrey C. Schmid, Haight Brown & Bonesteel and
John M. Wilkerson, Haight Brown & Bonesteel
Mr. Mijanovic may be contacted at kmijanovic@hbblaw.com
Mr. Schmid may be contacted at jschmid@hbblaw.com
Mr. Wilkerson may be contacted at jwilkerson@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Approaching Design-Build Projects to Avoid (or Win) Disputes
August 07, 2023 —
Stuart Eisler - Construction ExecutiveStakeholders engage in design-build projects believing the collaborative nature better aligns parties' interests and reduces overall risk exposure. Each of the lead parties bases this belief on different factors—the owner sees an opportunity to reduce change-order exposure and improve delivery times, the design-builder (or contractor) aims to control design volatility by ensuring project components match budgeted projections, and the designer intends to benefit by greater constructability review from the design-builder team and often additional time to detail designs. Rarely do design-build parties contemplate claims arising while initiating a project.
This being said, design-build projects carry unique, inherent risks due to the award of often fixed-price contracts utilizing incomplete, preliminary designs. As scopes creep and costs balloon, previously harmonious parties experience discord and lurking claims. While the majority of design-build projects are completed without major dispute, there are strategies available to further avoid disputes and prevail in those that are unavoidable.
Reprinted courtesy of
Stuart Eisler, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of