Building Codes Evolve With High Wind Events
November 14, 2018 —
William L. Coulbourne - Construction ExecutiveDesigns for wind loads have been in building codes for a long time. Prior to the creation of the International Building Code, the three primary legacy codes had wind load provisions but they mostly dealt with wind loads on the building frame and had little load information about the building components or the exterior cladding.
Since Hurricane Andrew in 1992, building codes include more wind design information that comes from disaster investigations and wind engineering research conducted primarily at the university level. In 2000, the legacy building codes were replaced with the International Building Code (IBC). Residential buildings must comply with the International Residential Code (IRC). Both of these building code documents reference the engineering load standard, ASCE 7 Minimum Design Loads and Other Criteria for Buildings and Other Structures. This load standard has also been in existence for a long time; it now is revised every six years and the building codes revised every three years (IBC and IRC) reference ASCE 7 so the provisions in ASCE 7 become part of the building code requirements.
Reprinted courtesy of
William L. Coulbourne, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Counsel Investigating Coverage Can be Sued for Invasion of Privacy
January 28, 2019 —
Christopher Kendrick & Valerie A. Moore - Haight Brown & Bonesteel LLPIn Strawn v. Morris, Polich & Purdy (No. A150562, filed 1/4/19), a California appeals court held that policyholders could state a claim for invasion of privacy against an insurer’s coverage counsel and law firm, where the counsel had disseminated inadvertently produced tax returns to forensic accountants while evaluating coverage.
In Strawn, a couple’s home was destroyed by fire and the husband was prosecuted for arson, but the criminal case was dropped. Notwithstanding, their insurance claim was denied on the ground that the husband intentionally set the fire and fraudulently concealed his actions. In addition to the insurance company, the insureds also named the carrier’s coverage counsel and his firm in the ensuing bad faith lawsuit, alleging causes of action for elder financial abuse and invasion of privacy.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Top 10 Construction Contract Provisions – Changes and Claims
November 03, 2016 —
James R. Lynch – Ahlers & Cressman PLLCThis is the seventh post in our “Top 10 Construction Contract Provisions” series. Prior posts discussed
Price and Payment,
Liquidated Damages,
Consequential Damages – Part I and
Part II,
Indemnity,
Scope of Work, and
Flow-Down Provisions.
Today’s topic, Changes and Claims, is a contender for the top spot on our list, for both day-to-day impact on the job and importance in disputes. In fact, these provisions[i] are so variable and are involved in so many reported construction law decisions, that this post will not attempt to survey all their various forms, uses, or potential legal ramifications, but instead focuses on bottom line “best practices”—questions to consider as a general contractor, subcontractor, or owner when drafting, negotiating, or managing the Changes and Claims provisions of a contract. There is no “ideal” here, and the changes and claims procedures should be suited to the project, owner, contractor(s), likely issues, and other project-specific considerations. Key considerations include the following:
1. How prescriptive is the Change Order process? At one end of the spectrum, a Change Order provision may include requirements for written direction and request by the owner and formal response by the contractor, with pricing and specific supporting data or documentation, in addition to strict timelines for response, execution, and performance, precise methods to determine the resulting contract adjustment, limits on the type or extent of adjustment, or terms defining the effect of a signed Change Order, e.g. to what extent related claims or impacts might be extinguished. At the other end of the spectrum, the Change Order provision might simply recognize that the owner may direct changes, and the parties intend to document the directions and resulting compensation in a Change Order, with no further elaboration. There is no universal ideal on this spectrum. A highly defined and prescriptive process may be appropriate for a complex, high value, multi-stakeholder project on which significant changes are likely. The same process would be an inefficient waste of resources on a small and simple project where significant changes are unlikely and the parties would be unlikely to comply with more formal procedures.
Read the court decisionRead the full story...Reprinted courtesy of
James R. Lynch, Ahlers & Cressman PLLCMr. Lynch may be contacted at
jlynch@ac-lawyers.com
Addressing the Defective Stucco Crisis
November 28, 2018 —
Wally Zimolong - Supplemental ConditionsI received several emails regarding the expose by Caitlin McCabe and Erin Arvedlund in the Philadelphia Inquirer titled “Rotting Within.” The story outlines the epidemic of defective stucco and other “building envelope” issues in Southeastern Pennsylvania that is causing homes to literally rot from within. Having litigated several of these cases, they are frustrating for both the attorneys that handle them and the homeowners who must deal with the reality that their home is rotting away. The story points to the multiple (and all too common) causes for the epidemic: unskilled subcontractors, lack of oversight and care, and poor construction drawings. The is no quick solution to the crisis and litigation regarding these defects is sure to proliferate.
However, there is one potential solution that the story does not cover and which could help alleviate some of the challenges homeowners face in recovering damages for their claims. The Pennsylvania Legislature must act to change the insurance laws in Pennsylvania to make defective construction covered by a developer’s, contractor’s, and subcontractor’s commercial general liability policy (“CGL”). Most homeowners and many attorneys incorrectly assume that defective construction is covered by insurance. This assumption makes sense. If someone operates a car in a negligent manner and hits your car and causes damage, the negligent driver’s insurance company with cover your loss. In reality, Pennsylvania courts follows a minority of states that holds that generally speaking defective workmanship is not a “covered occurrence” under an insurance policy. (There are several exceptions to this rule and thorough discussion is beyond this blog post and would probably bore you.)
Read the court decisionRead the full story...Reprinted courtesy of
Wally Zimolong, Zimolong LLCMr. Zimolong may be contacted at
wally@zimolonglaw.com
Wildfires Threaten to Make Home Insurance Unaffordable
January 10, 2018 —
Christopher Flavelle – BloombergMore frequent and intense wildfires are making it harder for homeowners to find and keep insurance in California, a state regulator warned Thursday.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher Flavelle, Bloomberg
English High Court Finds That Business-Interruption Insurance Can Cover COVID-19 Losses
November 02, 2020 —
Lorelie S. Masters, Scott P. DeVries, Patrick M. McDermott & Jorge R. Aviles - Hunton Insurance Recovery BlogIn a decision that will influence how policyholders and insurers around the world address business-interruption coverage for COVID-19 losses, the English High Court recently handed down its much-anticipated judgment in the “Test Case,” The Financial Conduct Authority (FCA) v. Arch et al. The High Court’s comprehensive analysis will likely serve as an additional tool in policyholders’ arsenal in the ongoing battles over COVID-19 coverage.
The Panel, composed of two well-respected judges, one from the High Court (the UK’s trial court) and the other from the English Court of Appeal, analyzed 21 sample policy wordings in coverage extensions for business-interruption losses due to disease or the issuance of public authority orders. (Many of these wordings are also found in policies sold to US policyholders.) The High Court found that the COVID-19 pandemic and ensuing government actions fell within the coverage provided by the sample policy wordings.
Reprinted courtesy of
Lorelie S. Masters, Hunton Andrews Kurth,
Scott P. DeVries, Hunton Andrews Kurth,
Patrick M. McDermott, Hunton Andrews Kurth and
Jorge R. Aviles, Hunton Andrews Kurth
Ms. Masters may be contacted at lmasters@HuntonAK.com
Mr. DeVries may be contacted at sdevries@HuntonAK.com
Mr. McDermott may be contacted at pmcdermott@HuntonAK.com
Mr. Aviles may be contacted at javiles@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Texas Condo Construction Defect Code Amended
September 17, 2015 —
Beverley BevenFlorez-CDJ STAFFAccording to David H. Fisk of Kane Russell Coleman & Logan PC, “Before filing a lawsuit or initiating an arbitration proceeding pertaining to a construction defect, a condominium association in Texas with eight or more units must now comply with the newly added Section 82.119 to Chapter 82 of the Texas Property Code.”
Fisk reported that the new section “requires affected associations to have a licensed professional engineer inspect the units and common elements in question and prepare a written report that (1) identifies the specific units or common elements, (2) describes the present physical condition of the units or common elements, and (3) describes any modifications, maintenance, or repairs to the units or common elements performed by the unit owners or the association.”
Read the court decisionRead the full story...Reprinted courtesy of
Guardrail Maker Defrauded U.S. of $175 Million and Created Hazard, Jury Says
October 22, 2014 —
Patrick G. Lee – BloombergSecret changes by Trinity Industries Inc. to its guardrail systems were found to have cheated the U.S. government, exposing the company to $1 billion in damages and penalties and sending shares plummeting as states question the safety of the product.
The east Texas jury’s verdict comes as scrutiny of the highway-safety product called the ET-Plus intensifies across the country after it’s been blamed for multiple deaths. The Federal Highway Administration this month asked all states to start submitting information on crashes involving the ET-Plus to the agency’s safety office.
The agency will evaluate the findings of the case and “consider whether it affects the continued eligibility of the ET-Plus,” Brian Farber, a spokesman for the Department of Transportation, said in an e-mail.
Read the court decisionRead the full story...Reprinted courtesy of
Patrick G. Lee, BloombergMr. Lee may be contacted at
plee315@bloomberg.net