Court Rejects Insurer's Argument That Two Triggers Required
May 12, 2016 —
Tred R. Eyerly – Insurance Law HawaiiThe court rejected the insurer's argument that two triggers - one for exposure to asbestos and one for resulting injury - were required under CGL policies. Compass Ins. Co. v. University Mechanical and Engineering Contractors, Inc., 2016 U.S. Dist. LEXIS (N.D. Cal. March 25, 2016).
University Mechanical and Engineering Contractors, Inc. (UMEC) was a California corporation in the business of installing plumbing, piping and HVAC systems. UMEC was defending a number of asbestos cases in California state courts arising from its subcontracting work.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Nevada Assembly Bill Proposes Changes to Construction Defect Litigation
April 14, 2011 —
Beverley BevenFlorez CDJ STAFFAssemblyman John Oceguera has written a bill that would redefine the term Construction Defect, set statutory limitations, and force the prevailing party to pay for attorney’s fees. Assembly Bill 401 has been referred to the Committee on Judiciary.
Currently, the law in Nevada states that “a defect in the design, construction, manufacture, repair or landscaping of a new residence, of an alteration of or addition to an existing residence, or of an appurtenance, which is done in violation of law, including in violation of local codes or ordinances, is a constructional defect.” However, AB401 “provides that there is a rebuttable presumption that workmanship which exceeds the standards set forth in the applicable law, including any applicable local codes or ordinances, is not a constructional defect.”
The Nevada courts may award attorney fees to the prevailing party today. However, AB401 mandates that attorney fees must be awarded, and the exact award is to be determined by the Court. “(1) The court shall award to the prevailing party reasonable attorney’s fees, which must be an element of costs and awarded as costs; and (2) the amount of any attorney’s fees awarded must be determined by and approved by the court.”
AB401 also sets a three year statutory limit “for an action for damages for certain deficiencies, injury or wrongful death caused by a defect in construction if the defect is a result of willful misconduct or was fraudulently concealed.”
This Nevada bill is in the early stages of development.
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Best Practices for Installing Networks in New Buildings
August 14, 2023 —
Patrick Chown - Construction ExecutiveA previous article, "
How to Install Networks in an Old Building," discussed the various challenges of implementing networking infrastructure in older spaces. The building layout, age of the building and use cases were the major challenges involved. New buildings provide an opportunity to incorporate state-of-the-art networking infrastructure from the ground up. Careful planning and foresight are essential to ensure optimal network performance and avoid future issues.
In new buildings, including corporate offices, multifamily residential complexes, hospitals, educational institutions and retail spaces, the potential use cases and users can vary significantly. Each of these spaces comes with its unique networking requirements. Regardless of the specific network applications, there are fundamental frameworks and best practices that can be employed to build a solid network foundation. By following these guidelines and adapting them to the specific needs of your new building, you can ensure a robust and flexible network infrastructure that accommodates ever-evolving technological demands.
Reprinted courtesy of
Patrick Chown, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Construction Litigation Roundup: “Builder’s Risk Indeed”
October 24, 2023 —
Daniel Lund III - LexologyA contractor for a hotel in Seattle was tasked with constructing the hotel utilizing premanufactured modular hotel rooms. The modular unit portion of the project was the subject of a $15.8 million subcontract between the general contractor and the manufacturer. The manufacturer was also responsible to the GC for shipping and installing the modular units.
Shipping was to be “DDP,” or “Delivery Duty Paid” – which, according to a New York federal court, “is an international shipping term meaning that the seller assumes all responsibilities and costs for delivering property to the named place of destination, including export and import clearance, fees, duties, and taxes.” Additionally, per the subcontract, the manufacturer was responsible for “ensur[ing] all modular units [were] covered, secured[,] and protected from damage during the shipping process….” The modular units were shipped from Poland to Seattle. In the shipping process, the units spent some time in the Port of Everett in Washington state, where the units sustained water damage while sitting in port.
A related damage claim made by the subcontractor against the general contractor’s builder’s risk policy. On the face of the policy, the policy covered subcontractors as “additional insured” parties, covered all manner of materials and the like to be used on the project, and would provide that coverage in the process of transporting the materials insofar as “inland or coastal waters” were concerned. Yet, the builder’s risk insurer refused to cover the claim for the damages to the modular units which occurred while sitting in port in Everett.
Read the court decisionRead the full story...Reprinted courtesy of
Daniel Lund III, PhelpsMr. Lund may be contacted at
daniel.lund@phelps.com
Court Affirms Summary Adjudication of Bad Faith Claim Where Expert Opinions Raised a Genuine Dispute
July 06, 2020 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn 501 East 51st Street etc. v. Kookmin Best Ins. Co., Ltd. (No. B293605, filed 4/2/20, ordered pub. 4/16/20), a California appeals court affirmed summary adjudication and dismissal of a bad faith claim based on the genuine dispute doctrine.
501 East 51st Street Long-Beach-10, LLC (501) was the owner of a 10-unit apartment complex, insured by Kookmin Best. In 2017, an underground water main alongside the building burst which, according to 501, caused the building to move and crack. 501 made a claim and supplied a geotechnical report finding cracks in the foundation walls, cracks in the stucco and significant floor deformation and tilting near the water leak. The engineer’s opinion concluded that that “existing building distress was substantially contributed to by the water main break. The water introduced to the soil medium appears to have triggered differential foundation movement causing the stress features to develop.”
Kookmin retained its own engineers to investigate, who returned an opinion that the leak had exacerbated long-term pre-existing settlement which would continue. Under the policy, damage to the building caused by earth movement and settlement were excluded, but water damage resulting from an “accidental discharge” of water was covered. Kookmin then obtained an opinion from coverage counsel, who opined that only damage allocable to the water leak would be covered.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Insurer’s Duty to Indemnify Not Ripe Until Underlying Lawsuit Against Insured Resolved
February 03, 2020 —
David Adelstein - Florida Construction Legal UpdatesA liability insurer has two duties: 1) the duty to defend its insured; and 2) the duty to indemnify its insured.
With respect to the second duty – the duty to indemnify – this duty is typically “not ripe for adjudication unless and until the insured or putative insured has been held liable in the underlying action.” Hartford Fire Ins Co. v. Beazer Homes, LLC, 2019 WL 5596237, *2 (M.D.Fla. 2019) (internal quotation omitted).
For instance, Beazer Homes involved an insurance coverage dispute stemming from construction defects. An owner sued its general contractor for construction defects relating to stucco problems. The general contractor paid for the repairs. The general contractor then sued its stucco subcontractor to recover the costs it incurred. The subcontractor tendered the defense of the lawsuit to its commercial general liability insurer which is defending its insured-subcontractor under the commonly issued reservation of rights.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Court Requires Adherence to “Good Faith and Fair Dealing” in Construction Defect Coverage
September 30, 2011 —
CDJ STAFFThe California Court of Appeals has ruled in the case of Allied Framers, Inc. v. Golden Bear Insurance Company. Allied had been sued in a construction defect case and its primary insurer had become insolvent. Coverage for Allied’s defense was paid for by the California Insurance Guarantee Association through June 8, 2006. When warned that CIGA’s involvement was ending, Allied notified Golden Bear, which declined to provide coverage.
In the matters that followed, Golden Bear claimed that Allied had not exhausted its $1 million in primary insurance. Allied then showed that $1 million had already been paid out in the case. A few months thereafter, Golden Bear offered a $500,000 settlement on behalf of Allied which was rejected. Thereafter, Golden Bear hired new counsel to defend Allied. Golden Bear received, but allegedly did not pay, invoices Allied sent from their former counsel. Golden Bear finally settled the construction defect case for $2 million.
Allied’s original counsel sued Allied for payment. Golden Bear declined coverage. Allied then claimed that Golden Bear liable on several counts, arising from its failure to settle the construction defect action earlier than it did and its failure to pay Allied’s counsel. Golden Bear demurred, arguing that Allied had now exhausted is coverage with the $2 million settlement. The lower court sustained Golden Bear’s demurrer, dismissing Allied’s complaints.
The appeal court reviewed Allied’s seven complaints and sustained most of them. However, the court did reverse the trial court’s order in regard to Allied’s complaint that Golden Bear breached an implied covenant of good faith and fair dealing. The appeals court was not convinced that Golden Bear properly evaluated the settlement demand in the underlying construction defect case. The court found three other ways in which Golden Bear’s actions might show bad faith, in refusing to pay defense fees “after promising [Allied] such costs would be paid in full,” “failing to advise Allied about ‘actual or potential negative consequences of agreeing to the proposed settlement,’” and that their choice of counsel “failed to protect [Allied’s] interests in the negotiation.”
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
The EPA and the Corps of Engineers Propose Another Revised Definition of “Waters of the United States”
February 14, 2022 —
Anthony B. Cavender - Gravel2GavelOn December 7, 2021, the most recent proposed revision to the Clean Water Act’s term, “Waters of the United States” was published in the Federal Register. (See 86 FR 69372.) Comments on this proposal must be submitted by February 7, 2022. This term controls the scope of federal regulatory powers in such programs as the development of water quality standards, impaired waters, total maximum daily loads, oil spill prevention, preparedness and response plans, state and tribal water quality certification programs, the National Pollutant Discharge Elimination System (NPDES) permit program, and the Corps of Engineers’ dredge and fill program. The Environmental Protection Agency (EPA) and the Corps of Engineers have jointly drafted this comprehensive proposed rule, which also responds to President Biden’s Executive Order 13990, issued in January 2021.
Background
The agencies noted that they have repeatedly defined and re-defined “Waters of the United States” since the Clean Water Act was enacted in 1972. This level of sustained commitment is unique to this program, perhaps reflecting the importance of the programs that are implemented through the Clean Water Act. The most recent rulemaking efforts took place in 2015, 2017, 2020 and now 2022, and the Supreme Court has issued several landmark rulings in response to these efforts. See City of Milwaukee v. Illinois, 451 US 304 (1981), United States v. Riverside Bayview, 474 US 121 (1985), SWANCC v. United States, 531 US 159 (2001), Rapanos v. United States, 547 US 715 (2006), National Association of Manufacturers v. Department of Defense, 138 S Ct 617 (2018), and County of Maui, Hawaii v. Hawaii Wildlife Fund, 140 S, Ct 1462 (2020). The rules promulgated in 2015 and entitled, “Clean Water Act: Definition of Waters of the United States” expanded the scope of federal regulatory jurisdiction, but the 2020 rule, entitled the “Navigable Waters Protection Rule,” contracted that scope. Now, the agencies have proposed the “Revised Definition of ‘Waters of the United States,’” which will rescind the 2020 rule and inevitably restore something of the scope of the 2015 rule by returning to the familiar “1986 rules” that were issued by the Corps of Engineers in 1986 and EPA in 1988, as modified by the recent Supreme Court decisions mentioned above. Both the 2015 and 2020 rules were mired in litigation and the Corps and EPA view the resort to the 1986 rules as a fresh start for the Clean Water Act. In short, the topsy-turvy history of regulation under the Clean Water Act continues.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com