Tennessee Court: Window Openings Too Small, Judgment Too Large
November 18, 2011 —
CDJ STAFFThe Tennessee Court of Appeals has issued a ruling in the case of Dayton v. Ackerman, upholding the decision of the lower court, even as they found that the award was incorrectly computed. The Daytons purchased a house that had been designed and built by the Ackermans, who operated a construction business. The court noted that the warranty with the house promised that “for a period of 60 days, the following items will be free of defects in materials or workmanship: doors (including hardware); windows; electric switches; receptacles; and fixtures; caulking around exterior openings; pluming fixtures; and cabinet work.”
Soon, the Daytons began to experience problems with the house. Many were addressed by the Ackermans, but the Daytons continued to have problems with the windows. Neither side could specify a firm date when the Ackermans were contacted by the Daytons about the window problems. The Ackermans maintained that more than two years passed before the Daytons complained about the windows. The lower court found the Daytons more credible in this.
Initially, the Daytons included the window manufacturer in their suit, but after preliminary investigations, the Daytons dropped Martin Doors from their suit. Martin Doors concluded that the windows were improperly installed, many of them “jammed into openings that were too small for them.”
After the Daytons dismissed Martin Doors, the Ackermans sought to file a third party complaint against them. This was denied by the court, as too much time had elapsed. The Ackermans also noted that not all of the window installations were defective, however, the courts found that the Daytons ought not to have mismatched windows.
Unfortunately for the Daytons, the window repair was done incorrectly and the windows were now too small for the openings. The firm that did the repair discounted the windows and Daytons concealed the problem with plantation shutters, totalling $400 less than the original lowest estimate. However, the appeals court noted that it was here that the trial court made their computation error. Correcting this, the appeals court assessed the Ackermans $12,016.20 instead of $13,016.20.
Finally, the Ackerman’s expert was excluded as he had changed his testimony between deposition and trial. The trial reviewed the expert’s testimony and had it been admissible, it would not have changed the ruling.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Formal Opinion No. 2020-203: How A Lawyer Is to Handle Access to Client Confidential Information and Anticipation of Potential Security Issues
December 07, 2020 —
Bremer Whyte Brown & O'Meara LLPRecently, the California Bar Association (“CBA”) published Formal Opinion No. 2020-203[1] concerning a lawyer’s ethical obligations with respect to unauthorized access to electronically stored client information. The onset of the COVID-19 pandemic greatly accelerated the growing trend of storing and maintaining data and information online so that employees and clients can access the data from anywhere in the world at any time. Now, in today’s working world, the reality is nearly all information and data is stored and shared digitally online for ease of access, use, and dissemination.
Unfortunately, a major draw-back of this switch to a cyber paradigm is serious exposure to data breaches as a result of hacking, inadvertence, or theft. Formal Opinion No. 2020-203 outlines how a lawyer is to handle access to client confidential information and anticipation of potential security issues. This article will briefly cover the key aspects addressed in Formal Opinion No. 2020-203.
What is the duty owed by a lawyer to his or her client regarding the use of technology?
At the outset, the CBA reminds lawyers of the ongoing duty of competence (Rule 1.1) and the duty to safeguard clients’ confidences and secrets (Rule 1.6; Cal. Bus. & Prof. Code, § 6068(e)) which impose the requirement that a lawyer must have a basic understanding of the risks posed when using a given technology and (if necessary) obtain help from appropriate experts to assess those risks and take reasonable steps to prevent data breaches.
Read the court decisionRead the full story...Reprinted courtesy of
Bremer Whyte Brown & O'Meara LLP
Benefit of the Coblentz Agreement and Consent Judgment
August 26, 2024 —
David Adelstein - Florida Construction Legal UpdatesIf you are not familiar with the concept of what is commonly known as a Coblentz agreement relative to an insurance coverage dispute, review these prior postings (
here and
here and
here). This is a good-to-know agreement if you are a claimant and need to consider an avenue of collection if the insured’s carrier denies coverage out of the gate (meaning the carrier has denied both the duty to defend and the duty to indemnify).
A recent Eleventh Circuit Court of Appeals opinion demonstrates the Coblentz agreement concept. In Barrs v. Auto-Owners Ins. Co., 2024 WL 3673089 (11th Cir. 2024), an owner asserted a construction defect claim against its contractor. The owner hired the contractor to deconstruct a building and the contractor hired a demolition subcontractor. The owner noticed work was not being performed and materials (e.g., lumber) were missing; the demolition subcontractor had stolen materials. The subcontractor was terminated, and the owner claimed the contractor’s negligence allowed the theft and delayed his project. The contractor’s commercial general liability (CGL) insurer notified the insured-contractor that coverage did not exist and refused to defend the contractor. The owner sued the contractor under various theories of liability. The owner and contractor entered into a settlement agreement (i.e., the Coblentz agreement) where the contractor “admitted liability in the amount of $557,500.00….A consent judgment was entered against [the contractor] that closely tracked the settlement agreement but did not indicate which portion of the damages award was attributed to which claims. The agreement also assigned [owner] and all of [the contractor’s] rights to claim coverage and to recover available funds under [the contractor’s CGL policy].”
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
A Lack of Sophistication With the Construction Contract Can Play Out In an Ugly Dispute
November 07, 2022 —
David Adelstein - Florida Construction Legal UpdatesThere are times where a lack of sophistication can come back to haunt you. This is not referring to a lack of sophistication of the parties. The parties, themselves, could be quite sophisticated. This is referring to a lack of sophistication with the construction contract forming the basis of the relationship. While parties don’t always want to buy into the contract drafting and negotiation process, it is oftentimes the first document reviewed. Because contract terms and conditions are important. They govern the relationship, the risk, scope, amount, and certain outcomes with disputes. However, a lack of sophistication can play out when that contract that should govern the relationship, the risk, the scope, the amount, and certain outcomes doesn’t actually do that, or if it does, it does it poorly. An example of how bad a dispute can play out when it comes to the lack of sophistication on the front end is Avant Design Group, Inc. v. Aquastar Holdings, LLC, 2022 WL 6852227 (Fla. 3d DCA 2022), where a cost-plus contract was treated as a lump sum contract.
Here, an owner planned to perform an extensive interior build-out to a residential unit. The owner had an out-of-country architect; because the architect was not licensed in Florida, the owner hired a local architect/designer to oversee construction and obtain goods and services for the residential interior build-out. The contract was nothing but a proposal of items and costs. The proposal stated the owner “would pay the cost of goods and services of the vendors, plus pay a ‘20% Interior Design & Administrative Fee’” to the local designer. Avant Design Group, 2022 WL at *1. The proposal further stated, “This preliminary budget of the Client’s construction costs include [sic] anticipated costs for construction materials, labor and sales tax. Any other cost, including but not limited to freight, cartage, shipping, receiving, storage and delivery are not included in the preliminary budget and will be invoiced separately.” Id., n.2.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
COVID-19 Business Interruption Lawsuits Begin: Iconic Oceana Grill in New Orleans Files Insurance Coverage Lawsuit
April 20, 2020 —
Jeffrey J. Vita & William S. Bennett - Saxe Doernberger & Vita, P.C.On Monday, the iconic New Orleans restaurant, Oceana Grill, filed the first Coronavirus-related business interruption insurance coverage lawsuit in a US jurisdiction. The declaratory judgment action styled Cajun Conti, LLC, et. al. d/b/a Oceana Grill v. Certain Underwriters at Lloyd’s, London was filed in Louisiana state court for the Parish of Orleans. As a direct result of the government-mandated closures and restrictions on public gatherings implemented by the City of New Orleans and State of Louisiana, Oceana Grill’s petition anticipates a significant loss of business income.
Based on allegations in the petition, there are several aspects of Oceana Grill’s policy that make this a good test case for business interruption coverage stemming from the Coronavirus. Although the specific policy language is not quoted in the petition, coverage provisions are categorically identified throughout.
As a preliminary matter, the policy at issue appears to be written on an “all risks” basis, meaning the insuring agreement of the policy would likely be triggered generally by all risks of “physical loss or damage” unless specifically excluded. This basis for coverage, which is common in property policies, is advantageous to policyholders, as it limits the insured’s burden of proof to establishing that there was physical loss or damage while leaving the burden of applying any more specific exclusion to the insurance company.
Reprinted courtesy of
Jeffrey J. Vita, Saxe Doernberger & Vita, P.C. and
William S. Bennett, Saxe Doernberger & Vita, P.C.
Mr. Vita may be contacted at jjv@sdvlaw.com
Mr. Bennett may be contacted at wsb@sdvlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
U.S. Stocks Fluctuate Near Record After Housing Data
February 25, 2014 —
Lu Wang and Callie Bost – BloombergU.S. stocks fluctuated near a record high after data showed slower growth in home prices and a drop in consumer confidence, while Macy’s Inc. and Home Depot Inc. reported higher-than-estimated earnings.
Macy’s and Home Depot rose at least 3.1 percent. Tesla Motors Inc. climbed 16 percent as Morgan Stanley more than doubled its projected price for the stock. Office Depot Inc. slumped 11 percent after reporting an unexpected loss. Tenet Healthcare Corp. declined 11 percent as its forecast missed analysts’ estimates.
The S&P 500 (SPX) gained 0.1 percent to 1,848.59 at 1:59 p.m. in New York, poised for the highest close ever. Earlier, the U.S. equity benchmark lost 0.4 percent. The Dow Jones Industrial Average advanced 14.05 points, or 0.1 percent, to 16,221.19. Trading in S&P 500 stocks was 7 percent below the 30-day average during this time of the day.
Ms. Wang may be contacted at lwang8@bloomberg.net; Ms. Bost may be contacted at cbost2@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
Lu Wang and Callie Bost, Bloomberg
Colorado Passes Construction Defect Reform Bill
June 05, 2017 —
David Suggs – Bert L. Howe & Associates, Inc.According to Daniel E. Evans of Gordon & Rees Scully Mansukhani, Colorado’s state legislature recently passed a bill “designed to reduce litigation risk associated with building condos by requiring a majority of actual condo unit owners, as opposed to a majority of the HOA board members, to approve the filing of a lawsuit over construction defects.” Evans stated that this “legislation cannot be viewed as sweeping reform” and that “future legislative sessions will undoubtedly see additional efforts to reform construction defect litigation.”
Perhaps the most significant aspect of HB 1279 is the requirement for a majority of condo owners in a development to approve a lawsuit, Evans reported. Furthermore, HB 1279 “requires the HOA board to notify all condo unit owners and builders about plans to pursue a construction lawsuit. It further requires the HOA board to hold a meeting to allow the board and the developer to present facts and arguments to the individual condo unit owners, including arguments of the potential benefits and detriments of filing a lawsuit.”
Unlike its failed predecessors, HB 1279 does not require arbitration.
Read the court decisionRead the full story...Reprinted courtesy of
Responding to Ransomware Learning from Colonial Pipeline
June 07, 2021 —
J. Kyle Janecek - Newmeyer DillionRecently, ransomware has taken to the forefront in national news. The most prevalent ransomware attack, the one perpetrated against Colonial Pipeline by the now-defunct "Dark Side" hackers, has served to remind businesses about the risks of ransomware. What happened to Colonial Pipeline? What should businesses do to learn from Colonial Pipeline's response? What should a business avoid?
What happened to Colonial Pipeline?
Colonial Pipeline, a Georgia based operator of fuel pipelines, had its billing software compromised by Dark Side's ransomware attack.1 Following this, Colonial Pipeline took proactive measures to (1) shut down their systems; (2) evaluate the issue; and (3) safely brought systems back on line after ensuring that they were not compromised.
Following this, Colonial Pipeline did eventually pay the 4.4 million dollar ransom demand from Dark Side. What it got in return was a decryption key, as promised, which ended up being slower than Colonial Pipeline's own backups.2 The ultimate result of this event being an initial cost of $4.4 million, in addition to lost profits, additional security costs, reputational costs, and litigation costs as consumers had filed a class-action lawsuit to hold Colonial Pipeline accountable for their perceived lapse in security.3 Further, the fall-out from Colonial Pipeline had prompted additional cybersecurity efforts and changes by the Biden administration, including proposed regulations requiring pipeline companies to inform the Department of Homeland Security of cybersecurity incidents within 12 hours, in addition to keeping a cybersecurity coordinator on staff at all times, and reviews of current security measures.
Read the court decisionRead the full story...Reprinted courtesy of