Water Damage Sub-Limit Includes Tear-Out Costs
June 06, 2022 —
Tred R. Eyerly - Insurance Law HawaiiThe Florida Court of Appeals affirmed the trial court's ruling that the homeowner policy's sub-limit for water damage included tear-out costs. Sec. First Ins. Co. v. Vazquez, 2022 Fla. App. LEXIS 1205 (Fla. Ct. App. Feb. 18, 2022).
A discharge of water from the cast iron pipes caused damage to the home. The water escaped as a result of the failed cast iron pipes due to wear and tear, deterioration, and corrosion. The insurer acknowledged coverage for the water damage and paid $10,000 under the Limited Water Damage Endorsement (LWD Endorsement). The provision recited that "'[t]he limit of liability for all damage to covered property provided by this endorsement is $10,000 per loss." The insureds' suit argued they were entitled to additional benefits for the cost to tear out and replace a part of the concrete slab - an action necessary to reach the corroded pipes. The parties stipulated that the cost of the tear-out would be $40,000.
The parties agreed that the LWD Endorsement provided coverage of both water damage and tear-out costs. They also agreed that the cost to repair and/or replace the corroded pipes was not covered. They disagreed, however, over the proper interpretation of the limitation of liability provision in the LWD Endorsement. The insured argued that the $10,000 limit applied to both water damage and tear-out costs. The insureds argued that the $10,00 limit applied only to water damage to covered property.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Connecticut Federal District Court Keeps Busy With Collapse Cases
October 19, 2017 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court for the district of Connecticut has faced a slew of collapse cases, recently dismissing several such cases.
The policies under consideration in each case cover the "entire collapse of a covered building structure" or "the entire collapse of part of a covered building structure." The collapse must be "a sudden and accidental physical loss caused by one of a list of specific causes such as defective methods or materials. In most of the recent cases, the insured alleged that the concrete in basement walls or foundations was cracking due to a chemical reaction. It was further alleged that the chemical reaction would continue to progressively deteriorate, rendering the building structurally unstable.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
MTA Implements Revised Contractors Debarment Regulations
July 06, 2020 —
Steven M. Charney, Gregory H. Chertoff & Paul Monte - Peckar & Abramson, P.C.On June 3, 2020, the Metropolitan Transit Authority (“MTA”) published and implemented revised regulations pertaining to the debarment of contractors. The revised regulations address many of the deep concerns raised by the contracting community.
Under relevant administrative procedure, the MTA publication of the revised regulations starts a 45 day notice period before the regulations can be adopted as final.
The prior regulations essentially required that debarment occur upon a purely formulaic calculation establishing that a contractor: 1) was more than 10% late, or 2) had submitted invalid claims that exceeded the adjusted contract price by a measure of 10%.
The revised regulations represent improvements over the prior regulations.
Critically, the revised regulations address the primary concern raised by the contracting community, that being the mandate of purely formulaic debarment. Instead, the revised regulations establish a process that includes greater flexibility and discretion before debarment may ensue.
Reprinted courtesy of Peckar & Abramson, P.C. attorneys
Steven M. Charney,
Gregory H. Chertoff and
Paul Monte
Mr. Charney may be contacted at scharney@pecklaw.com
Mr. Chertoff may be contacted at gchertoff@pecklaw.com
Mr. Monte may be contacted at pmonte@pecklaw.com
Read the court decisionRead the full story...Reprinted courtesy of
The Courts and Changing Views on Construction Defect Coverage
October 02, 2013 —
CDJ STAFFThere have been changes recently in how courts interpret commercial general liability policies. Writing for Claims Journal, Burke Coleman, who is legal counsel and Compliance Manager for Demotech, looks at five recent cases and how they show changing views of CGL policies and construction defect claims.
He notes that the Ohio Supreme Court concluded that “defective construction itself does not trigger coverage.” The court’s view in Westfield Ins. Co. v. Custom Agri Systems, Inc. was that a CGL policy does not protect contractors from every risk, but instead covers damage to other property that occur due to its work.
But, conversely, the Georgia Supreme Court found that construction defect claims could be covered under a commercial general liability policy, noting that “the limits of coverage do not have to be found in the word ‘occurrence,’ inasmuch as the other words of the insuring agreement — as well as the policy exclusions — have their own roles to play in marking the limits of coverage.” This decision was reached in Taylor Morrison Services v. HDI-Gerling America.
The Connecticut Supreme Court also concluded that defective construction could trigger coverage from a CGL policy, however, as Mr. Coleman notes, “only damage to non-defective property may be entitled to coverage.” He concludes that the North Dakota Supreme Court “has taken an even broader approach to the issue.” That court found that construction defects were covered “if the faulty work was unexpected and unintended.”
Finally, the Supreme Court of Appeals of West Virginia held that faulty work can be property damage. He notes “the policy at issue included a ‘your work’ exclusion that excluded coverage for work performed by the insured, but subcontractors were excepted from the exclusion.” However, another clause excluded work performed on the behalf of the insured.
Read the court decisionRead the full story...Reprinted courtesy of
California Supreme Court Finds that When it Comes to Intentional Interference Claims, Public Works Projects are Just Different, Special Even
November 21, 2017 —
Garret Murai - California Construction Law BlogOriginally published by CDJ on April 20, 2017
Earlier, we reported on a California Court of Appeals decision – Roy Allan Slurry Seal, Inc. v. American Asphalt South, Inc. – which held for the first time that a second-place bidder on a public works contract could sue a winning bidder who failed to pay its workers prevailing wages, under the business tort of intentional interference with prospective economic advantage.
Fast forward nearly two years, several amicus briefs, and “one doghouse”* later and the California Supreme Court has . . . reversed.
The Roy Allan Slurry Seal Case
To catch you up, or rather, refresh your recollection . . .
Between 2009 and 2012, American Asphalt South, Inc. was awarded 23 public works contracts totaling more than $14.6 million throughout Los Angeles, Orange, San Bernardino and San Diego counties. Two of the losing bidders on those projects – Roy Allan Slurry Seal, Inc. and Doug Martin Contracting, Inc. – sued American in each of these counties for intentional interference with prospective economic advantage as well as under the Unfair Practices Act (“UPA”) (Bus. & Prof. Code §§ 17000 et seq.) and the Unfair Competition Law (“UCL”) (Bus. & Prof. Code §17200).
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
The BUILDCHAIN Project Enhances Data Exchange and Transparency in the EU Construction Industry
January 23, 2023 —
Aarni Heiskanen - AEC BusinessTrace Labs, a WEB 3 developer, joins the EU’s efforts to create a smarter and more sustainable built environment with the
BUILDCHAIN project. With its 11 EU partners, Trace Labs aims to improve efficiency, reduce errors, and increase transparency and trust in construction.
Efficient, transparent, and trusted data exchange is a powerful tool for driving sustainability, resilience, and energy efficiency in construction. However, there are several obstacles to trusted data exchange in the industry today:
- Data silos: Construction projects involve multiple parties and stakeholders, each of which may have its systems for storing and sharing information. This can lead to data silos and a lack of coordination, making it difficult to access and trust the data.
- Lack of standardization: Construction projects may use different formats for storing and sharing data, leading to difficulties in comparing and combining information from various projects.
- Data security: Construction projects often involve sensitive information, such as building plans, materials lists, and inspection results. Ensuring this information is secure and protected from unauthorized access can be a significant challenge.
- Lack of incentives: There are often few incentives for construction companies and other stakeholders to share data and collaborate on projects, making establishing trust and transparency challenging.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Former Hoboken, New Jersey Mayor Disbarred for Taking Bribes
September 17, 2014 —
Beverley BevenFlorez-CDJ STAFFThe New Jersey Law Journal reported that Peter Cammarano III, a former Hoboken, New Jersey, mayor, was disbarred after admitting “four years ago that he took $25,000 in bribes from a federal informant in exchange for promising his help in getting approval for a high-rise.” Cammarano “was one of 44 public officials and rabbis arrested in July 2009 as part of a massive federal investigation, known as Operation Bid Rig, into public corruption and money laundering operations.”
The Disciplinary review board had recommended a three year suspension, however, the New Jersey Supreme Court rejected that recommendation.
“An elected official who sells his office—who offers favored treatment in exchange for money—betrays a solemn public trust,” Justice Barry Albin wrote for the court, as quoted by the New Jersey Law Journal. “This form of corruption is corrosive to our democracy and undermines public confidence in honest government, and its rippling pernicious effects are incalculable.”
“I believe the Disciplinary Review Board’s decision was right,” Joseph Jr. Hayden, Cammarano’s attorney, told the New Jersey Law Journal. “There were sufficient mitigating factors to justify only a suspension.”
Read the court decisionRead the full story...Reprinted courtesy of
Too Late for The Blame Game: Massachusetts Court Holds That the Statute of Repose Barred a Product Manufacturer from Seeking Contribution from a Product Installer
March 21, 2022 —
Gus Sara - The Subrogation StrategistIn State Farm Fire & Cas. Co. v. Wangs Alliance Corp., No. 21-cv-10389-AK, 2022 U.S. Dist. LEXIS 26712, the United States District Court for the District of Massachusetts (District Court) considered whether a product manufacturer was barred by the Commonwealth’s six-year statute of repose for improvements to real property from joining the installer of the product as a third-party defendant. The court denied the defendant’s motion for leave to file a third-party complaint to join the installer, finding that the installer completed its work more than six years prior to the motion being filed. This case reminds us that Massachusetts’ six-year statute of repose for improvement to real property also bars a defendant’s contribution claims against third parties.
The Wangs Alliance case involves a subrogation action filed by State Farm Fire & Casualty Insurance (Insurer) against Wangs Alliance Corp. (Wangs), a manufacturer of rope lighting. Insurer insured the homeowners, who experienced a fire in their home in 2018. The home was originally built in 2002 by Wellen Construction (Wellen). As part of the original construction, Wellen installed rope lighting manufactured by Wangs in the house.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at