ABC Safety Report: Construction Companies Can Be Nearly 6 Times Safer Than the Industry Average Through Best Practices
May 06, 2024 —
Associated Builders and ContractorsWASHINGTON, April 30, 2024 (GLOBE NEWSWIRE) -- Associated Builders and Contractors today announced the findings from its
2024 Safety Performance Report, an annual guide to construction jobsite health and safety best practices. The report is unveiled to coincide with
Construction Safety Week, May 6-10.
The annual safety report also provides a comprehensive understanding of the impact of deploying
ABC's STEP Safety Management System, which enables top-performing ABC members to achieve incident rates 576% safer than the U.S. Bureau of Labor Statistics construction industry average. Established in 1989, STEP provides contractors and suppliers with a robust, no-cost framework for measuring safety data and benchmarking with peers in the industry.
ABC's research on more than 900 million work hours completed by participants in the construction, heavy construction, civil engineering and specialty trades in 2023 identified the following foundations of industry-leading safety best practices:
- Top management engagement: Employer involvement at the highest level of company management produces a 54% reduction in total recordable incident rates, or TRIR, and a 52% reduction in days away, restricted or transferred rates, or DART rates.
- Substance abuse prevention programs: Robust substance abuse prevention programs/policies with provisions for drug and alcohol testing where permitted lead to a 47% reduction in TRIR and a 48% reduction in DART rates.
- New hire safety orientation: Companies that conduct an in-depth indoctrination of new employees into the safety culture, systems and processes based on a documented orientation process experience incident rates that are 45% lower than companies that limit their orientations to basic health and safety compliance topics.
- Frequency of toolbox talks: Companies that conduct daily, 15-to-30-minute toolbox talks reduce TRIR and DART rates by 81% compared to companies that hold them monthly.
The 2024 ABC Safety Performance Report is based on submissions of unique company data gathered from members that deployed during the 2023 STEP term, Jan. 15-Dec. 15. ABC collects each company's trailing indicator data as reported on its annual Occupational Safety and Health Administration Form 300A ("Summary of Work-Related Injuries and Illnesses") and its self-assessment of leading indicator practices from its STEP application. Each data point collected is sorted using statistically valid methodology developed by the BLS for its annual Occupational Injuries and Illnesses Survey and then combined to produce analyses of STEP member performance against BLS industry average incident rates. The report demonstrates that applying industry-leading processes dramatically improves health and safety performance among participants regardless of company size or type of work.
Any company can participate in STEP. Visit abc.org/step to begin or continue your safety journey.
Read the court decisionRead the full story...Reprinted courtesy of
Understanding California’s Pure Comparative Negligence Law
November 13, 2023 —
Yaron Shaham - Kahana FeldIn order for a plaintiff to prove a defendant is negligent, the plaintiff must prove the defendant (1) owed a duty to plaintiff, (2) breached that duty, (3) the breach was the actual and proximate cause of plaintiff’s injury, and (4) the resulting monetary damage. However, for both plaintiffs and defendants it is not an all or nothing game in California. This is because California is a pure Comparative Negligence state.
California’s Comparative Negligence law provides that even if a plaintiff is deemed 99% at fault, the plaintiff can still recover 1% in damages from a defendant. Thus, even if a plaintiff is deemed to be more than 50% (or even 99%) at fault for the incident, the plaintiff could still recover some monetary amount, or the defendant will still have to pay plaintiff, depending on how you see it. In most instances, a jury decides what percentage of fault to assign to each party.
Just as a plaintiff must prove he/she/its negligence case against a defendant, if the defendant claims plaintiff was partially responsible for the incident, the defendant must prove plaintiff was also negligent and said negligence contributed to plaintiff’s injuries. The total amount of monetary responsibility distributed among all defendants and plaintiffs must equal 100%. As crazy as it may sound, a plaintiff found to be 99.9% at fault, is still entitled to recover 0.01% from a defendant in California.
Read the court decisionRead the full story...Reprinted courtesy of
Yaron Shaham, Kahana FeldMr. Shaham may be contacted at
yshaham@kahanafeld.com
When to use Arbitration to Resolve Construction Disputes
February 25, 2014 —
Beverley BevenFlorez-CDJ STAFFOn the blog Construction Contractor Advisor, Craig Martin answers the question of whether arbitration is always the best choice for resolving construction claims. His answer: “Some claims may benefit from arbitration, but the benefit is not always clear.”
Martin brings forth four points to consider. First, AIA Contracts do not “push Arbitration.” Second, the cost of arbitration may be expensive: “You could well spend over $5,000 just to have the arbitrator decide your case—again, not to mention your own attorneys fees.” Third, arbitration doesn’t avoid discovery. And finally, “mediation is always an option, regardless of which way you pursue your claim.”
Read the court decisionRead the full story...Reprinted courtesy of
Denial of Coverage for Bulge in Wall Upheld
November 26, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe insurer properly denied coverage for a bulge in a warehouse wall that the insured claimed was caused by Hurricane Ike. Russell v. Scottsdale Ins. Co., 2014 U.S. Dist. LEXIS 143882 (S.D. Tex. Sept. 30, 2014).
Hurricane Ike displaced metal roof coverings on the insured's warehouse, causing interior water damage to several rooms. Scottsdale eventually paid $84,820.36 for the loss of the roof, less the deductible. The parties disagreed on whether a horizontal bulge on the north wall of the warehouse was also caused by the hurricane. The bulging portion of the wall was not cracked, but cracks were seen around the corners and windows. The insured admitted to an engineer retained by Scottsdale that the cracks in the exterior walls had been filled with caulking on several occasions prior to Hurricane Ike.
Scottsdale denied coverage for the damage to the north wall under exclusions for soil sinking, rising, or shifting and for damage from faulty, inadequate or defective design, construction, and repair.The insured later sent a demand for $800,000 for the damage to the wall. A suit was eventually filed by the insured.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Construction Jobs Expected to Rise in Post-Hurricane Rebuilding
November 07, 2012 —
CDJ STAFFBusinessweek reports that construction jobs and materials will see increased demand as property owners in New York and New Jersey rebuild after hurricane Sandy. Tom Jeffery, of Irvine, California-based CoreLogic, a real estate information service, noted that “a high percent of damaged properties are going to be repaired.” Experts estimate property damage to total anywhere from $7 billion to $40 billion.
It is also estimated that about 739,000 properties in the area are underwater in the way that has nothing to do with flooding, with negative equity of 25 percent or more. Many of these homeowners are likely to walk away from their mortgages.
Ken Simonson, chief economist of the Associated General Contractors of America, expects “localized spikes in construction employment throughout November and the winter.” Martin Connor, the chief financial officer of Toll Brothers, expects to see more a rise in labor costs than in materials.
Read the court decisionRead the full story...Reprinted courtesy of
Should CGL Insurer have Duty to Defend Insured During Chapter 558 Notice of Construction Defects Process???
September 01, 2016 —
David Adelstein – Florida Construction Legal UpdatesDoes a CGL insurer have a duty to defend its insured-contractor during Florida Statutes Chapter 558 notice of construction defects pre-suit process? This answer is currently undecided and will be up to the Florida Supreme Court to decide. (It is on appeal stemming from a federal district court saying that an insurer does not have a duty to defend its insured-contractor in the 558 process based on the definition of the word “suit” in the CGL policy.)
Why is this an important issue?
The 558 pre-suit notice of construction defects process is designed to facilitate an avenue for construction defect lawsuits to get resolved without having to file a lawsuit or, at least, have issues narrowed before a lawsuit needs to be filed. (Check here for a summary of the 558 process.) It requires pre-suit notifications so that implicated parties can become aware of the defects and have an opportunity to inspect the defects / damage, test the defects / damage, and respond to the notice of construction defects; it provides an avenue for beneficial pre-suit discovery. Through participating in the 558 process, the contractor and/or design professional (and those downstream from them) can: (i) offer to remedy the defect, (ii) settle the defect, whether through money or a combination of money and repairs, (iii) dispute the defect, or (iv) advise that available insurance proceeds will be determined by its liability insurer. See Fla. Stat. s. 558.004.
Read the court decisionRead the full story...Reprinted courtesy of
David M. Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
The COVID-19 Impact: Navigating the Legal Landscape’s New Normal
July 27, 2020 —
Amanda Mathieu - Lewis BrisboisWhile most of the country has been at a standstill since March, you might be wondering, what about my lawsuit or my administrative charge? For the past couple of months, most litigation cases have largely been put on pause in the courts and at administrative agencies. However, as we adjust to what is clearly a new normal in both our lives and the legal landscape as we know it, cases will begin to pick up speed again, albeit with new strategies and challenges to keep in mind.
As courts begin to reopen, judges are emphasizing in many jurisdictions that criminal cases will take priority in an effort to attend to constitutionally required timelines. Nevertheless, it will remain just as important as before the pause button was hit to keep cases moving forward. This ramp up period presents a unique opportunity for clients and attorneys to invest meaningful time into investigating and developing defenses to claims while the court system and related case pace remains slowed.
Read the court decisionRead the full story...Reprinted courtesy of
Amanda Mathieu, Lewis BrisboisMs. Mathieu may be contacted at
Amanda.Mathieu@lewisbrisbois.com
Timely Written Notice to Insurer and Cooperating with Insurer
June 21, 2017 —
David Adelstein - Florida Construction Legal UpdatesI harp on notifying a liability insurer in writing once a claim is asserted against you. As soon as possible. I harp on this because as an insured you want to remove any doubt or argument that the insurer was prejudiced due to a lack of timely notice.
In a recent opinion, Zurich American Insurance Co. v. European Tile and Floors, Inc., 2017 WL 2427172 (M.D.Fla. 2017), the insurer moved for summary judgment in a coverage action arguing that its insured failed to provide it timely written notice. Specifically, the insurer argued that the insured violated the clause in the liability policy that states:
2. Duties in the Event of Occurrence, Offense, Claim or Suit
b. If a claim is made or “suit” is brought against any insured, you must:
- Immediately record the specifics of the claim or “suit” and the date received; and
- Notify us as soon as practicable.
You must see to it that we receive written notice of the claim or “suit” as soon as practicable.
c. You and any other insured must:
- Immediately send us copies of any demands, notices, summonses or legal papers received in connection with the claim or “suit”;
- Authorize us to obtain records and other information;
- Cooperate with us in the investigation, settlement or defense of the claim or “suit”; and
- Assist us, upon our request, in the enforcement of any right against any person or organization which may be liable to the insured because of injury or damage to which this insurance may also apply.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
Dadelstein@gmail.com