Court Orders City to Pay for Sewer Backups
March 31, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to The Courier-Journal, in August of 2009 “raw sewage” backed “up into several houses during a torrential downpour” in Jeffersonville, Indiana. Now, a “Clark County judge has ordered the city of Jeffersonville to pay nearly $100,000 plus 8 percent annual interest for the city's negligence that led to” the incident.
The problems allegedly began after a new lift station and force main, which “previously flowed southward to the Ohio River,” was “re-routed it to Springdale.” The city was eventually “cited by the Indiana Department of Environmental Management for failing to obtain a required local permit for the Springdale upgrade.”
The Courier-Journal reported that Jeffersonville “agreed to take several steps to remedy the problem for residents and satisfy the state, which ultimately considered the issue resolved in October 2012.” Since the upgrade was completed, there have not been any further sewer backups, according to the city’s utility director, Len Ashack, as quoted by The Courier-Journal.
Read the court decisionRead the full story...Reprinted courtesy of
2017 Legislative Changes Affecting the Construction Industry
July 13, 2017 —
Melinda S. Gentile – Peckar & Abramson, P.C.The 2017 Florida Legislative Session recently concluded, and a number of important construction-related House Bills (HB) and Senate Bills (SB) were presented during the Session, most notably SB 204/HB 377. These Bills may impact General Contractors and Construction Managers in a number of ways, not the least of which is the period of time that a cause of action may be initiated for the design, planning or construction of an improvement.
The following construction-related Bills passed in both the House and Senate and will become law if approved by the Governor.
Senate Bill (SB) 204/House Bill (HB) 377: Relating to the Statute of Repose for causes of action based on design, planning or construction of an improvement to real property. This bill passed both the House and the Senate and was approved by the Governor on June 14, 2017. This bill becomes effective on July 1, 2017.
Read the court decisionRead the full story...Reprinted courtesy of
Melinda S. Gentile, Peckar & Abramson, P.C.Ms. Gentile may be contacted at
mgentile@pecklaw.com
Big Policyholder Win in Michigan
January 05, 2017 —
Jeremiah M. Welch – Saxe Doernberger & Vita, P.C.Jeremiah Welch and
Michael Barrese recently had a big win in front of the Michigan Court of Appeals.
The case (Skanska-Schweitzer v. Farm Bureau General Insurance Company of Michigan) involved Skanska’s claim for defense and indemnity from Farm Bureau Ins. Co. of Michigan for an injury to an elementary school student arising out of the removal of playground equipment by a landscaping company, Horrocks. Farm Bureau denied coverage because it claimed that the work was not part of Horrocks’ contract with the project owner and therefore Skanska, the construction manager, did not qualify as an additional insured on the policy.
SDV argued that the AI endorsement did not specify that Horrocks’ work be performed as part of its contract with the owner; it only required that the work be performed “for Skanska.”
Read the court decisionRead the full story...Reprinted courtesy of
Jeremiah M. Welch, Saxe Doernberger & Vita, P.C.Mr. Welch may be contacted at
jmw@sdvlaw.com
The Construction Industry's Health Kick
October 02, 2018 —
Erin Ansley - Construction ExecutiveThe construction industry appears to be on a health kick, and by all accounts it isn’t a fad. Trends identified in recent years in the health care sector are strengthening with a surge of new projects nationwide.
“All parts of the country are experiencing significant health care design and construction activity,” observes Hank Adams, HDR’s global director of health. “We’re expecting continued growth into the near future and feel optimistic that the marketplace will continue to be strong.”
Modern urban planning strategies, engineering advancements and sophisticated design take center stage as oversized hospitals serving large patient populations within a 100-mile radius make way for more specialized centers that target the overall wellness of the local community.
Reprinted courtesy of
Erin Ansley, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Substituting Materials and Failure to Comply with Contractual Requirements
November 19, 2021 —
David Adelstein - Florida Construction Legal UpdatesIt is important to remember that if you are going to substitute materials from those specified, you need to make sure there is proper approval in doing so–make sure to comply with the contractual requirements to substitute materials. Otherwise, you could be in a situation where you are contractually required to remove the installed substituted materials and replace with the correct specified materials. This is not the situation you want to find yourself in because this is oftentimes a costly endeavor. This was the situation in Appeal-of-Sauer, Inc., discussed below, on a federal project. The best thing that you can do is comply with the contractual requirements if you want to substitute materials. If you are in the situation where it is too late, i.e., you already installed incorrect materials, you want to demonstrate the substituted materials are functionally equivalent to the specified materials and/or come up with an engineering solution, as required, that could be less costly then ripping out the installed material and replacing with the correct material. Even doing so, however, is not a “get out of jail free card” and does not necessarily mean there is not a strong basis to require you to install the correct specified material.
In Appeal of- Sauer, Inc., ASBCA 61847, 2021 WL 4888192 (ASBCA September 29, 2021), a federal project’s engineering requirements required cast iron piping for the above ground sanitary system. However, the prime contractor installed PVC piping instead of cast iron piping. The prime contractor believed it had the appropriate approval through its submittal. The government, through its contracting officer, directed the prime contractor to remove installed PVC piping to replace with cast iron. The government did not believe PVC piping was the functional equivalent of cast iron piping for the above ground sanitary system due to its concern with the noise level of waste materials flowing through the piping. The prime contractor submitted a claim for its removal and replacement costs which was denied by the contracting officer. On appeal with the Armed Services Board of Contract Appeals, the Board agreed with the contracting officer explaining: “While we agree that a design change could be approved by the designer of record and brought to the attention of the government before being incorporated into the design documents, the [prime contractor’s] task order required that such a design change meet the minimum requirements of the solicitation and accepted proposal. The plumbing submittal [the prime contractor] issued here, showing the use of PVC instead of cast iron for the above ground waste piping, did not meet the minimum requirements of the solicitation.” Appeal of-Sauer, Inc., supra.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Construction Delays for China’s Bahamas Resort Project
October 01, 2014 —
Beverley BevenFlorez-CDJ STAFFThe Wall Street Journal reported that the $3.5 billion resort and casino China’s building in the Bahamas is being undermined by delays and labor crashes, which is “dulling the buzz surrounding the venture and threaten to undermine China's future business.”
Once finished, the project “will include 2,200 new hotel rooms, luxury condominiums priced as high as $12 million, a 100,000-square-foot casino and an 18-hole golf course. Singer Lenny Kravitz is designing the nightclub.”
Baha Mar, the developers, told the Wall Street Journal that they will not be meeting their December 2014 deadline, and instead are “focused on late spring 2015.”
Read the court decisionRead the full story...Reprinted courtesy of
Construction Defects through the Years
July 31, 2013 —
CDJ STAFFBuilder has an article on the some building changes over the years that have led to construction defect problems. Is insulation evil? Well, that what some thought in the 1930s. Early attempts at insulating walls trapped moisture causing paint to peel. Then in the 1960s, the rise of aluminum wire lead to an even more serious problem: house fires.
And it continues. The plastic piping that was though to last forever when it was installed in the late 70s turned out to have about a decade of life. It’s a short forever. Eventually, polybutylene plumbing was forbidden by building codes.
The article has a series of building innovations that seemed like great ideas at the time, but were later found to be problematic.
Read the court decisionRead the full story...Reprinted courtesy of
Renters ‘Sold Out’ by NYC Pensions Press Mayor on Housing
May 19, 2014 —
Martin Z. Braun – BloombergElevators break down, ceilings leak and security is lax at the Metro North apartments overlooking the East River in Harlem, says retired rehabilitation technician Bob Montesi, who’s lived there for more than three decades.
Even as deterioration accelerates at the 761-unit complex, which used to be in a state affordable-housing program, some tenants are facing rent increases of as much as 80 percent.
For Montesi, 74, who worked at a New York City-run hospital for 41 years, the changes are especially galling. One of the owners of the building is his pension fund.
Read the court decisionRead the full story...Reprinted courtesy of
Martin Z. Braun, BloombergMr. Braun may be contacted at
mbraun6@bloomberg.net