Builder’s Risk Coverage—Construction Defects
August 20, 2019 —
Brian Hearst - Construction ExecutiveThis is the second of three articles bringing clarity to the complex and challenging course of construction exposures and providing solutions for mitigating risk through builder’s risk insurance coverage. Part I, Builder’s Risk Coverage – Language Matters, addressed a select few critical exposures to projects under the course of construction. Part II addresses how a standard builder’s risk policy may respond to a loss arising from defective construction and alternative insurance market offerings that can help with specific costs associated with construction defect loss.
Coverage for Loss Ensuing from Faulty Workmanship
Part I tackled the standard builder’s risk exclusion that applies to losses arising from faulty materials or workmanship. Traditionally, carriers do not have an appetite for covering a contractor’s failure to perform their work properly. There is one exception, which is coverage is available for ensuing loss – or the resulting damage to other property from faulty workmanship.
If the excluded cause of loss (i.e., faulty workmanship) causes resultant damage, the builder’s risk policy will cover the damages to the extent the peril of fire is covered. The ensuing loss exception limits the faulty work exclusion to costs directly related to repairing or replacing the faulty work.
For example, suppose faulty wiring work leads to a fire which damages part of a structure under construction. The faulty workmanship exclusion would apply to the actual faulty wiring work, but if fire is a covered peril under the policy (this is nearly always the case), the policy would respond to the structure’s fire damage.
Reprinted courtesy of
Brian Hearst, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Hearst may be contacted at
Brian.Hearst@lockton.com
Exclusions Bar Coverage for Damage Caused by Chinese Drywall
July 05, 2011 —
Tred R. EyerlyThe insured homeowners were unsuccessful in arguing around the policy's exclusions when seeking coverage for damage caused by Chinese drywall. Ross v. C. Adams. Constr. & Design, L.L.C., 2011 La. App. LEXIS 769 (La. Ct. App. June 14, 2011).
Before the insureds purchased and moved into their home, it was renovated. After moving in, the insures discovered foreign gypsum drywall, or Chinese drywall. The insureds submitted a claim to Louisiana Citizens Property Insurance Company. In an investigation, the insurer confirmed the presence of Chinese drywall and damage to the metal surfaces caused by corrosion. Louisiana Citizens refused coverage and the insureds sued. The trial court denied the insured's motion for summary judgment and granted summary judgment to Louisiana Citizens.
The court of appeal affirmed. Initially, the court determined the insureds sustained a direct physical loss. The inherent qualities of the Chinese drywall created a physical loss to the home and required that the drywall be removed and replaced.
Four exclusions, however, barred coverage. First, damages due to faulty or defective materials were excluded from coverage. The Chinese drywall emitted high levels of sulfuric gas which caused the damage to the insured's plumbing, electrical wiring and metal components.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
Deferred Maintenance?
December 17, 2024 —
Daniel Lund III - LexologyA Tennessee-based “outsourced maintenance vendor” to an engine company filed suit in Louisiana state court seeking to recover nearly $150,000 on “open account,” for work previously performed. The engine company removed the case to the Federal District Court in New Orleans and asserted as a defense that the vendor lacked a proper Louisiana construction contractor’s license. The engine company filed a motion for summary judgment based on the defense.
Under Louisiana law, a contract between parties is “absolutely null”--considered to have never existed--where one of the parties performed services without a required Louisiana contractor’s license, and the combined work reaches a $50,000 threshold. The engine company asserted that the vendor performed typical construction contractor work, including plywood flooring, applied epoxy to concrete flooring, erected part of a commercial carport, undertook certain heavy demolition, and installed fences, guardrails, and wire racks.
Read the court decisionRead the full story...Reprinted courtesy of
Daniel Lund III, PhelpsMr. Lund may be contacted at
daniel.lund@phelps.com
Insurer's Withheld Discovery Must be Produced in Bad Faith Case
November 03, 2016 —
Tred R. Eyerly – Insurance Law HawaiiThe United States District Court for the Western District of Washington granted the insureds' motion to compel and ordered that the insurer produce withheld discovery. Bagley v. Travelers Home & Marine Ins. Co., 2016 U.S. Dist. LEXIS 115028 (W.D. Wash. Aug. 25, 2016).
The insureds' dock and boat ramp were damaged in a storm. Travelers refused to pay for the damage, arguing it was not covered. After Plaintiffs filed suit, Travelers admitted coverage and agreed to pay. The insureds' suit included a claim that Travelers wrongfully denied coverage, thereby costing the insureds money.
The insureds moved the court to compel Travelers to respond to certain discovery requests. First, the insureds requested the claims file Travelers maintained on their claim. The court did not order the production of privileged documents, but documents related to claims handling were not privileged. Travelers was ordered to produce all documents in the insureds' claim file that related to claim handling, even if the documents were created after the commencement of litigation.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
No Coverage Under Installation Policy When Read Together with Insurance Application
January 16, 2024 —
David Adelstein - Florida Construction Legal UpdatesA recent case out of the Eleventh Circuit denied an underground contractor’s claim under what appears to be a commercial property installation floater policy (inland marine coverage) that covers the contractor’s materials. Whereas a builder’s risk policy is more expansive, an installation floater is narrower and can provide protection to a contractor for materials and equipment in transit, stored, or being installed subject to the terms of the installation floater policy. It can provide coverage to a trade subcontractor for materials that aren’t covered by builder’s risk.
In Travelers Property Casualty Company of America v. Talcon Group, LLC, 2023 WL 8798053 (11th Cir. 2023), an underground utility contractor that had a general contractor’s license had an installation policy that provided coverage “only for underground utility operations and the site development work tied to those operations.” Talcon Group, supra, at *1. The utility contractor was constructing two residential homes that was on land owned by an affiliated family entity. During construction of the residential homes, a wildfire destroyed the homes prior to the issuance of certificates of occupancy. The utility contractor submitted a notice of loss to its insurance carrier that provided the installation policy. The carrier denied the claim because the construction of the homes was NOT the same type of work as the installation of underground utilities which was covered. An insurance coverage lawsuit ensued.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Purse Tycoon Aims at Ultra-Rich With $85 Million Home
September 24, 2014 —
John Gittelsohn and Nadja Brandt – BloombergThe eight-bedroom, 15-bath Beverly Hills, California, mansion has $5,600 toilets, a wall of caramel onyx and an 18-seat screening room with doors clad in Italian lizard skin. Asking price: $85 million.
Rapper Jay Z has taken two tours of the hillside aerie with views that sweep from downtown Los Angeles to the Pacific Ocean. The estate was developed by Bruce Makowsky, who made his fortune selling handbags through department stores and the QVC television channel.
“There was a void of homes for super-wealthy people, and that’s why I did it,” Makowsky said while sitting near a curved 54-foot (16-meter) glass wall that slides open to an infinity pool with iPad-controlled fountains. “I don’t think there’s anybody who’s served up $85 million-to-$100 million homes at this level for somebody to step into and buy.”
Mr. Gittelsohn may be contacted at johngitt@bloomberg.net; Ms. Brandt may be contacted at nbrandt@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
John Gittelsohn and Nadja Brandt, Bloomberg
A Court-Side Seat: Clean Air, Clean Water, Citizen Suits and the Summer of 2022
November 01, 2022 —
Anthony B. Cavender - Gravel2GavelThis is a selection of significant environmental and regulatory law cases decided by the federal courts after the Supreme Court’s 2021 Term concluded.
The U.S. Court of Appeals for the DC Circuit
National Association of Broadcasters v. Federal Communications Commission
On July 12, 2022, the DC Circuit held that an order of the FCC requiring radio broadcasters to follow a prescribed five-step process to verify the identity of program sponsors was not authorized by the Communications Act. According to the court, the FCC “decreed a duty that the statute does not require, and that the statute does not empower the FCC to impose.” Here, the agency failed to identify the statutory authority it needed to authorize the issuance of such an order. While certainly not as significant as the Supreme Court’s ruling in West Virginia v. EPA, decided only a few days before this decision was released, it is a strong reminder that the courts want to know if a challenged rule is authorized by law.
Humane Society of the U.S., et al., v. U.S. Department of Agriculture
On July 22, 2022, the court decided a case involving the steps the Administrative Procedure Act and the Federal Register Act require to be taken before a final agency rule is legally promulgated. Customarily, when there has been a change in Presidential administrations, the incoming administration “quietly” withdraws rules awaiting Federal Register publication without much ceremony. The majority of this panel agreed that public notice should have been provided to the regulated community to comment on the new administration’s action to pull back a new rule which had been made available for public inspection before Federal Register publication that would have strengthened the protections afforded “show horses,” as now required by law. The court noted that “it seems clear that filing with the Federal Register constituted promulgation of a regulation even though publication may not occur until a later date.” Circuit Judge Rao filed a strong dissent. “By cutting off agency discretion at public inspection, the majority imposes judicial burden on agency procedures that conflicts with circuit precedent, the statutory framework and a longstanding regulation permitting withdrawals prior to publication.” There could be a further review of this unique ruling.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Make Sure to Properly Perfect and Preserve Construction Lien Rights
December 07, 2020 —
David Adelstein - Florida Construction Legal UpdatesIf you recording a construction lien (referred to as a claim of lien) and looking to perfect your construction lien foreclosure rights, it is imperative that you work with counsel to ensure your rights are properly preserved. This is good practice!
A claim of lien must be served on an owner within 15 days after recording. Florida Statute s. 713.08(4)(c) says: “The claim of lien shall be served on the owner. Failure to serve any claim of lien in the manner provided in s. 713.18 before recording or within 15 days after recording shall render the claim of lien voidable to the extent that the failure or delay is shown to have been prejudicial to any person entitled to rely on the service.”
Florida Statute s. 713.18, hyperlinked for your review, includes the statutory ways to serve “notices, claims of lien, affidavits, assignments, and other instruments permitted or required under [Florida Statutes Chapter 713].”
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com