    custom homes building expert Seattle Washington hospital construction building expert Seattle Washington concrete tilt-up building expert Seattle Washington high-rise construction building expert Seattle Washington landscaping construction building expert Seattle Washington institutional building building expert Seattle Washington casino resort building expert Seattle Washington production housing building expert Seattle Washington Medical building building expert Seattle Washington multi family housing building expert Seattle Washington office building building expert Seattle Washington tract home building expert Seattle Washington industrial building building expert Seattle Washington retail construction building expert Seattle Washington Subterranean parking building expert Seattle Washington mid-rise construction building expert Seattle Washington parking structure building expert Seattle Washington townhome construction building expert Seattle Washington structural steel construction building expert Seattle Washington housing building expert Seattle Washington condominium building expert Seattle Washington condominiums building expert Seattle Washington
    Seattle Washington roofing and waterproofing expert witnessSeattle Washington multi family design expert witnessSeattle Washington hospital construction expert witnessSeattle Washington building code compliance expert witnessSeattle Washington delay claim expert witnessSeattle Washington construction expertsSeattle Washington construction defect expert witness
    Arrange No Cost Consultation
    Building Expert Builders Information
    Seattle, Washington

    Washington Builders Right To Repair Current Law Summary:

    Current Law Summary: (SB 5536) The legislature passed a contractor protection bill that reduces contractors' exposure to lawsuits to six years from 12, and gives builders seven "affirmative defenses" to counter defect complaints from homeowners. Claimant must provide notice no later than 45 days before filing action; within 21 days of notice of claim, "construction professional" must serve response; claimant must accept or reject inspection proposal or settlement offer within 30 days; within 14 days following inspection, construction pro must serve written offer to remedy/compromise/settle; claimant can reject all offers; statutes of limitations are tolled until 60 days after period of time during which filing of action is barred under section 3 of the act. This law applies to single-family dwellings and condos.


    Building Expert Contractors Licensing
    Guidelines Seattle Washington

    A license is required for plumbing, and electrical trades. Businesses must register with the Secretary of State.


    Building Expert Contractors Building Industry
    Association Directory
    MBuilders Association of King & Snohomish Counties
    Local # 4955
    335 116th Ave SE
    Bellevue, WA 98004

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Kitsap County
    Local # 4944
    5251 Auto Ctr Way
    Bremerton, WA 98312

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Spokane
    Local # 4966
    5813 E 4th Ave Ste 201
    Spokane, WA 99212

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of North Central
    Local # 4957
    PO Box 2065
    Wenatchee, WA 98801

    Seattle Washington Building Expert 10/ 10

    MBuilders Association of Pierce County
    Local # 4977
    PO Box 1913 Suite 301
    Tacoma, WA 98401

    Seattle Washington Building Expert 10/ 10

    North Peninsula Builders Association
    Local # 4927
    PO Box 748
    Port Angeles, WA 98362
    Seattle Washington Building Expert 10/ 10

    Jefferson County Home Builders Association
    Local # 4947
    PO Box 1399
    Port Hadlock, WA 98339

    Seattle Washington Building Expert 10/ 10


    Building Expert News and Information
    For Seattle Washington


    A New AAA Study Confirms that Arbitration is Faster to Resolution Than Court – And the Difference Can be Assessed Monetarily

    Consequential Damage Claims for Insurer's Bad Faith Dismissed

    Ahlers, Cressman & Sleight PLLC Ranked Top Washington Law Firm By Construction Executive

    A Closer Look at an HOA Board Member’s Duty to Homeowners

    3 Common Cash Flow Issues That Plague The Construction Industry

    Reasonableness of Liquidated Damages Determined at Time of Contract (or, You Can’t Look Back Again)

    Wreckage Removal Underway at Site of Collapsed Key Bridge in Baltimore, But Weather Slows Progress

    Failure to Comply with Sprinkler Endorsement Bars Coverage for Fire Damage

    Second Circuit Denies Petitions for Review of EPA’s Final Regulations to Establish Requirements for Cooling Water Intake Structures

    ASCE Statement on Passing of Senator Dianne Feinstein

    Condo Owners Allege Construction Defects at Trump Towers

    An Overview of the New EPA HVAC Refrigerant Regulations and Its Implications for the Construction Industry

    The 2021 Top 50 Construction Law Firms™

    An Additional Insured’s Reasonable Expectations may be Different from the Named Insured’s and Must be Considered to Determine whether the Additional Insured is Entitled to Defense from the Insurer of a Commercial Excess & Umbrella Liability Policy

    Nevada Assembly Passes Construction Defect Bill

    Research Institute: A Shared Information Platform Reduces Construction Costs Considerably

    Construction May Begin with Documents, but It Shouldn’t End That Way

    Power & Energy - Emerging Insurance Coverage Cases of Interest

    LA Metro To Pay Kiewit $297.8M Settlement on Freeway Job

    No Duty to Indemnify When Discovery Shows Faulty Workmanship Damages Insured’s Own Work

    A Race to the Finish on Oroville Dam Spillway Fix

    Developers Can Tap into DOE’s $400 Million for Remote and Rural Clean Energy Projects

    Anatomy of a Data Center

    Consumer Product Safety Commission Recalls

    Settlement Reached in California Animal Shelter Construction Defect Case

    Construction Litigation Roundup: “The New Empty Chair.”

    Multiple Construction Errors Contributed to Mexico Subway Collapse

    Revel Closing Shows Gambling Is No Sure Thing for Renewal

    Study May Come Too Late for Construction Defect Bill

    Eastern District of Pennsylvania Confirms Carrier Owes No Duty to Defend Against Claims for Faulty Workmanship

    Key Legal Issues to Consider Before and After Natural Disasters

    New Index Tracking Mortgages for New Homes

    Hunton Andrews Kurth’s Insurance Recovery Practice, Partners Larry Bracken and Mike Levine Receive Band 1 Honors from Chambers USA in Georgia

    Alabama Supreme Court Reverses Determination of Coverage for Faulty Workmanship

    Ohio Court of Appeals: Absolute Pollution Exclusion Bars Coverage For Workplace Coal-Tar Pitch Exposure Claims

    A Property Boom Is Coming to China's Smaller Cities

    9th Circuit Plumbs Through the Federal and State False Claims Acts

    Anatomy of an Indemnity Provision

    General Contractor Cited for Safety Violations after Worker Fatality

    DoD Testing New Roofing System that Saves Energy and Water

    Lewis Brisbois Successfully Concludes Privacy Dispute for Comedian Kathy Griffin Following Calif. Supreme Court Denial of Review

    Hollywood Legend Betty Grable’s Former Home for Sale

    Real Estate & Construction News Roundup (3/20/24) – Construction Backlog Falls, National Association of Realtors Settle Litigation, and Commercial Real Estate Market’s Effect on City Cuts

    Gordon & Rees Ranked #4 of Top 50 Construction Law Firms in the Nation by Construction Executive Magazine

    One Colorado Court Allows Negligence Claim by General Contractor Against Subcontractor

    BHA at The Basic Course in Texas Construction Law

    EEOC Issues Anti-Harassment Guidance To Construction-Industry Employers

    Equitable Subrogation Part Deux: Mechanic’s Lien vs. Later Bank Deed of Trust

    Arbitration and Mediation: What’s the Difference? What to Expect.

    Occurrence Definition Trends Analyzed
    Corporate Profile

    SEATTLE WASHINGTON BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    The Seattle, Washington Building Expert Group at BHA, leverages from the experience gained through more than 7,000 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Leveraging from this considerable body of experience, BHA provides construction related trial support and expert services to Seattle's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Building Expert News & Info
    Seattle, Washington

    Arizona Court of Appeals Decision in $8.475 Million Construction Defect Class Action Suit

    May 09, 2011 —

    In the case of Leflet v. Fire (Ariz. App., 2011), which involved an $8.475 million settlement in a construction defect class action suit, the question put forth to the Appeals court was “whether an insured and an insurer can join in a Morris agreement that avoids the primary insurer’s obligation to pay policy limits and passes liability in excess of those limits on to other insurers.” The Appeals court provided several reasons for their decision to affirm the validity of the settlement agreement as to the Non-Participatory Insurers (NPIs) and to vacate and remand the attorney fee awards.

    First, the Appeals court stated, “The settlement agreement is not a compliant Morris agreement and provides no basis for claims against the NPIs.” They conclude, “Appellants attempt to avoid the doctrinal underpinnings of Morris by arguing that ‘the cooperation clause did not prohibit Hancock from assigning its rights to anyone, including Appellants.’ This narrow reading of the cooperation clause ignores the fact that Hancock did not merely assign its rights — it assigned its rights after stipulating to an $8.475 million judgment that neither it nor its Direct Insurers could ever be liable to pay. Neither Morris nor any other case defines such conduct as actual ‘cooperation’—rather, Morris simply defines limited circumstances in which an insured is relieved of its duty to cooperate. Because Morris agreements are fraught with risk of abuse, a settlement that mimics Morris in form but does not find support in the legal and economic realities that gave rise to that decision is both unenforceable and offensive to the policy’s cooperation clause.”

    The Appeals court further concluded that “even if the agreement had qualified under Morris, plaintiffs did not provide the required notice to the NPIs.” The court continued, “Because an insurer who defends under a reservation of rights is always aware of the possibility of a Morris agreement, the mere threat of Morris in the course of settlement negotiations does not constitute sufficient notice. Instead, the insurer must be made aware that it may waive its reservation of rights and provide an unqualified defense, or defend solely on coverage and reasonableness grounds against the judgment resulting from the Morris agreement. The NPIs were not given the protections of this choice before the agreement was entered, and therefore can face no liability for the resulting stipulated judgment.”

    Next, the Appeals court declared that “the trial court abused its discretion in awarding attorney’s fees under A.R.S § 12-341.” The Appeals court reasoned, “In this case, the NPIs prevailed in their attack on the settlement. But the litigation did not test the merits of their coverage defenses or the reasonableness of the settlement amount. And Plaintiffs never sued the NPIs, either in their own right or as the assignees of Hancock. Rather, the NPIs intervened to test the conceptual validity of the settlement agreement (to which they were not parties) before such an action could commence. In these circumstances, though it might be appropriate to offset a fee award against some future recovery by the Plaintiff Leflet v. Fire (Ariz. App., 2011) class, the purposes of A.R.S. § 12-341.01 would not be served by an award of fees against them jointly and severally. We therefore conclude that the trial court abused its discretion in awarding fees against Plaintiffs ‘jointly and severally.’”

    The Appeals court made the following conclusion: “we affirm the judgment of the trial court concerning the validity of the settlement agreement as to the NPIs. We vacate and remand the award of attorney’s fees. In our discretion, we decline to award the NPIs the attorney’s fees they have requested on appeal pursuant to A.R.S. § 12-341.01(A).”

    Read the court’s decision…

    Read the court decision
    Read the full story...
    Reprinted courtesy of

    COVID-19 Response: Recent Executive Orders Present Opportunities for Businesses Seeking Regulatory and Enforcement Relief and Expedited Project Development

    June 15, 2020 —
    Washington, D.C. (June 8, 2020) - Two recent Executive Orders (EO) aimed at promoting economic recovery from the COVID-19 crisis offer regulatory and enforcement relief and encourage agencies to expedite infrastructure project approvals. The May 19, 2020 EO 13924, “Regulatory Relief to Support Economic Recovery,” directs agencies to determine whether previous regulatory reforms would promote economic recovery if made permanent and encourages compliance assistance through exercising enforcement discretion, including declining enforcement. And the June 4, 2020 EO 13927, “Accelerating the Nation’s Economic Recovery from the COVID-19 Emergency by Expediting Infrastructure Investments and Other Activities,” aims to speed up the permitting process for infrastructure projects to strengthen the national economy. As businesses look to move forward and recover from the COVID-19 pandemic, they should closely review these EOs for opportunities to take advantage of streamlined treatment and faster project approvals. EO 13294 supplements the Administration’s efforts to address the economic crisis brought on by the COVID-19 pandemic by encouraging federal agencies to rescind, modify, waive, or provide exemptions from federal regulations that may inhibit economic recovery and to provide guidance to businesses, particularly small businesses, on what is required of them under federal law for reopening. Specifically, the EO directs agency heads to identify regulatory standards that may inhibit economic recovery and consider rescinding or waiving those regulations, exempting regulated entities from compliance, exercising enforcement discretion, or extending regulatory compliance and enforcement deadlines. It also allows for compliance assistance through accelerated regulatory procedures to receive a pre-enforcement ruling and directs agencies to assess previous regulatory reforms to determine whether making them permanent would promote economic recovery. Since taking office, the Trump Administration has made regulatory reform a cornerstone of its agenda. This Executive Order is a continuation of the aggressive steps taken by the Administration to reduce the regulatory burden faced by American businesses that many argue increases operating costs, inhibits job creation, and stifles economic growth. Reprinted courtesy of Lewis Brisbois attorneys Karen C. Bennett, Jane C. Luxton and Amanda L. Tharpe Ms. Bennett may be contacted at Karen.Bennett@lewisbrisbois.com Ms. Luxton may be contacted at Jane.Luxton@lewisbrisbois.com Ms. Tharpe may be contacted at Amanda.Tharpe@lewisbrisbois.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    The Living Makes Buildings Better with Computational Design

    November 12, 2019 —
    The AEC industry has a responsibility and mandate when it comes to addressing significant global challenges in the sector and improving operational practice. Professionals such as Lorenzo Villaggi, Senior Research Scientist at The Living, believe that new design technologies hold the key to better-performing built environments. “Although I’m trained as an architect, I’ve always had an interest in how technology can interact with and have an impact on design processes,” says Lorenzo. “I’ve developed a familiarity with advanced computational tools and eventually developed my own.” These computational tools are primarily designed to assist with the generation of design options and improve performance analysis. They range from small systems that help users design faster, all the way to elaborate software that can perform complex, mission-critical tasks. Read the court decision
    Read the full story...
    Reprinted courtesy of Aarni Heiskanen, AEC Business
    Mr. Heiskanen may be contacted at aec-business@aepartners.fi

    EPA and the Corps of Engineers Repeal the 2015 “Waters of the United States” Rule

    January 13, 2020 —
    The pre-publication version of the final rule to be promulgated by EPA and the U.S. Army Corps of Engineers (ACOE) to repeal the 2015 redefinition of the Clean Water Act’s term “Waters of the United States” which is the linchpin of these agencies’ regulatory power under the CWA, was made available on September 12, 2019. The rule should be published in the Federal Register in the next few weeks, and it will be effective 60 days thereafter. Many challenges are expected to be filed in the federal courts. The 2015 rule was very controversial, and petitions challenging the rule were filed in many federal district courts, several courts of appeal, and finally in the Supreme Court (see NAM v. Department of Defense), which held that all initial challenges must be filed in the federal district courts. The upshot of these challenges is that, at this time, the 2015 rule has been enjoined in more than half the states while the other states are bound by the 2015 rule, a situation which is frustrating for everyone. In addition to repealing the 2015 rule, the agencies also restored the pre-2015 definition had had been in place since 1986. As a result, the pre-2015 definition of waters of the U.S. will again govern the application of the following rules: (a) the ACOE’s definition of “waters of the U.S.” at 33 CFR Section 328.3; (b) EPA’s general Oil Discharge rule at 40 CFR Section 110; (c) the SPCC rules at 40 CFR Part 112; (d) EPA’s designation of hazardous substances at 40 CFR Part 116; (e) EPA’s hazardous substance reportable quantity rule at 40 CFR Part 117; (f) the NPDES permitting rules at 40 CFR Part 122; (g) the guidelines for dredged or fill disposal sites at 40 CFR Part 230; (g) Exempt activities not requiring a CWA 404 permit (guidelines for 404 disposal sites at 40 CFR Part 232); (h) the National Contingency Plan rules at 40 CFR Part 300; (i) the designation of reportable quantities of hazardous substances at 40 CFR Part 302; and (j) EPA’s Effluent Guidelines standards at 40 CFR Part 401. Read the court decision
    Read the full story...
    Reprinted courtesy of Anthony B. Cavender, Pillsbury
    Mr. Cavender may be contacted at anthony.cavender@pillsburylaw.com

    The Five-Step Protocol to Reopening a Business

    August 03, 2020 —
    Over the past few months, guidance on how to create a safer, low-risk workplace has frequently changed. Fortunately, the state of California has finally reached a point where comprehensive and concrete advice is now available. On June 24, 2020, the California Statewide Industry Guidance to Reduce Risk website was updated. In addition to providing industry-specific guidance and opening checklists for approximately 40 different industries, the website now unambiguously requires all businesses—regardless of which “phase” they reopen—to follow a five-step protocol (as described in greater detail throughout this article):
    • Perform a detailed risk assessment and create a site-specific protection plan.
    • Train employees on how to limit the spread of COVID-19. This includes how to screen themselves for symptoms and when to stay home.
    • Set up individual control measures and screenings.
    • Put disinfection protocols in place.
    • Establish physical distancing guidelines
    Reprinted courtesy of Amy R. Patton, Payne & Fears and Rana Ayazi, Payne & Fears Ms. Patton may be contacted at arp@paynefears.com Ms. Ayazi may be contacted at ra@paynefears.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Walking the Tightrope of SB 35

    December 22, 2019 —
    Developers in California know that getting approval to build new housing projects can be extremely difficult, time-consuming, and expensive. But a new policy is finally coming into full effect which could help developers cut through those barriers. SB 35, enacted in 2017, streamlines the approval process for housing developments in areas with inadequate housing supply, so long as the developments meet certain criteria. We have written elsewhere about the initial impacts of SB 35. SB 35 has successfully allowed some developers to obtain their entitlements quickly and easily through a streamlined process, but some local governments have resisted the use of SB 35. For example, the City of Los Altos denied an application that attempted to obtain streamlining through SB 35, prompting a nonprofit housing organization to sue. In Cupertino, the Planning Commission Chairman advocated in April 2019 for rescinding the SB 35 approval of the redevelopment of the Vallco Mall, which would include over 2,400 units of housing, while some residents have sued to block the development. As a result, it is crucial for developers to understand the details of SB 35 and make sure to meet all of its requirements. Any misstep may allow a recalcitrant local government to deny that a development project qualifies for SB 35 treatment and attempt to block it. In November 2018, the state Department of Housing and Community Development (HCD) released Guidelines to clarify the criteria for SB 35 and assist cities in determining whether projects qualify for streamlining. Reprinted courtesy of Pillsbury attorneys Robert Howard, Alexander Walker and Matt Olhausen Mr. Howard may be contacted at robert.howard@pillsburylaw.com Mr. Walker may be contacted at alexander.walker@pillsburylaw.com Mr. Olhausen may be contacted at matt.olhausen@pillsburylaw.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    At Least 46 Killed in Taiwanese Apartment Building Inferno

    November 01, 2021 —
    Kaohsiung, Taiwan (AP) -- At least 46 people were killed and another 41 injured after a fire broke out early Thursday in a run-down mixed commercial and residential building in the Taiwanese port city of Kaohsiung, officials said. Neighborhood residents said the 13-story building was home to many poor, elderly and disabled people and it wasn’t clear how many of the 120 units were occupied. Witnesses said they heard something that sounded like an explosion at about 3 a.m. when the blaze erupted in the building's lower floors, which housed a closed movie theater, abandoned restaurants and karaoke clubs. Read the court decision
    Read the full story...
    Reprinted courtesy of Bloomberg

    General Liability Alert: A Mixed Cause of Action with Protected and Non-Protected Activity Not Subject to Anti-SLAPP Motion

    February 18, 2015 —
    In Baral v. Schnitt (filed 2/5/2015, No. B253620), the California Court of Appeal, Second Appellate District, held that California’s anti-SLAPP statute does not authorize the striking of allegations of protected activity in a cause of action that also contains meritorious allegations of non-protected activity not within the purview of the statute. In so holding, the court attempted to resolve, or at least add its voice to, the growing conflict among appellate districts on the issue. A SLAPP lawsuit (Strategic Lawsuit Against Public Participation) seeks to chill or punish the exercise of constitutional rights to free speech and to petition the government for redress of grievances. California’s Legislature enacted the anti-SLAPP statute to permit a defendant to file a special motion to strike as to any cause of action that arises out of an act in furtherance of such rights. In Baral, the plaintiff alleged that his business partner had violated fiduciary duties in usurping the plaintiff’s ownership and management interests in their jointly owned company, so that the defendant could benefit from a secret sale of the company. The complaint alleged that the defendant hired a public accounting firm and prevented the plaintiff from participating in its investigation in order to force the plaintiff's cooperation of the sale of the company. The defendant filed an anti-SLAPP motion, seeking to strike all references to the accounting firm's audit. The trial court denied the motion, on the ground that the anti-SLAPP statute applies to causes of action, not allegations. Reprinted courtesy of Haight Brown & Bonesteel LLP attorneys Valerie A. Moore, Lawrence S. Zucker II and Blythe Golay Ms. Moore may be contacted at vmoore@hbblaw.com. Mr. Zucker may be contacted at lzucker@hbblaw.com. Ms. Golay may be contacted at bgolay@hbblaw.com. Read the court decision
    Read the full story...
    Reprinted courtesy of