Iowa Court Holds Defective Work Performed by Insured's Subcontractor Constitutes an "Occurrence"
July 28, 2016 —
Tred R. Eyerly – Insurance Law HawaiiThe Iowa Supreme Court held that property damage caused by a subcontractor's defective work was an "occurrence." Nat'l Sur. Corp. v. Westlake Invs., LLC, 2016 Iowa LEXIS 71 (Iowa June 10, 2016).
In 2002, the insureds, the developers and general contractor, began construction on an apartment complex. While the complex was still under construction, it was purchased by Westlake Investments, LLC.
During construction, numerous problems surfaced, including visible water penetration issues in several buildings. In February 2008, Westlake sued the insureds, seeking to recover lost profits, repair costs, and other damages under tort and contract theories. Arch Insurance Group defended under the primary policy. A settlement was eventually reached whereby a consent judgment for $15,600,000 was entered against the insureds and in favor of Westlake. Arch contributed its policy limits of $1,000,000 to the settlement. Other third party defendants contributed $1,737,500, leaving $12,762,500 of the judgment unsatisfied. The insureds assigned rights under their excess policy with National Surety Corporation (NSC) to Westlake. NSC's policy was a following-form policy.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
New York Court Holds That the “Lesser of Two” Doctrine Limits Recoverable Damages in Subrogation Actions
September 23, 2019 —
Michael L. DeBona - The Subrogation StrategistIn New York Cent. Mut. Ins. Co. v. TopBuild Home Servs., Inc., 2019 U.S. Dist. LEXIS 69634 (April 24, 2019), the United States District Court for the Eastern District of New York recently held that the “lesser of two” doctrine applies to subrogation actions, thereby limiting property damages to the lesser of repair costs or the property’s diminution in value.
In New York Cent. Mut. Ins. Co., New York Central Mutual Insurance Company’s (New York Central) insureds, Paul and Karen Mazzola, suffered a fire to their home. After the fire, New York Central paid the Mazzolas $708,465.74 to repair the property. New York Central brought a subrogation action against TopBuild Home Services, Inc. (TopBuild), alleging that the fire was caused by negligent work performed by TopBuild. New York Central sought to recover the repair costs it paid to the Mazzolas. TopBuild conceded liability but disputed the proper measure of damages.
TopBuild filed a motion for partial summary judgment, arguing that under the “lesser of two” doctrine, New York Central could recover only the lesser of the costs to repair the property or the property’s diminution in value. TopBuild, therefore, asserted that New York Central was not entitled to the repair costs of $708,465.74 but, rather, could recover only the property’s decline in value following the fire – approximately $250,000.[1] In response, New York Central argued that New York’s “lesser of two” doctrine does not apply to subrogation actions because an insurance company cannot mitigate the payment it makes to its insured.
Read the court decisionRead the full story...Reprinted courtesy of
Michael L. DeBona, White and Williams LLPMr. DeBona may be contacted at
debonam@whiteandwilliams.com
COVID-izing Your Construction Contract
December 21, 2020 —
Frederick E. Hedberg - Construction ExecutiveThe global COVID-19 pandemic has changed the world forever, disrupting many industries, as well as creating unprecedented challenges that threaten many businesses. The construction industry is no different. Projects throughout the country have been adversely affected by unplanned work stoppages, delays, disruptions to the supply chain, price escalations and other unanticipated events.
It is critical that owners, developers, contractors and suppliers learn from their experiences over the past year and account for the COVID-19 pandemic when drafting and negotiating contracts for their projects.
First and foremost, parties should clearly define their rights and responsibilities to properly manage risks due to COVID-19 and its impacts. COVID-19 and other key related terms should be defined, relying on the CDC and state governments for guidance, to eliminate any uncertainties. The contract should also identify executive orders, guidelines and regulations that have been issued concerning COVID-19 by states, municipalities and other authorities that have jurisdiction where the project is located.
Reprinted courtesy of
Frederick E. Hedberg, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Mr. Hedberg may be contacted at fhedberg@rc.com
Read the court decisionRead the full story...Reprinted courtesy of
Fewer NYC Construction Deaths as Safety Law Awaits Governor's Signature
July 25, 2022 —
Richard Korman - Engineering News-RecordThe hoped-for progress in New York City construction safety is coming too late for laborer Jose Fortina Armenta Hernandez. At 8:37 a.m. on May 27, 2021, while jackhammering a roof section on a Brooklyn building, the section on which Armenta stood gave way and he fell 60 ft. When last year his family sent his body from New York City to Mexico to be buried, they used a GoFundMe page to raise money for the laborer's funeral.
Reprinted courtesy of
Richard Korman, Engineering News-Record
Mr. Korman may be contacted at kormanr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Once Again: Contract Terms Matter
May 11, 2020 —
Christopher G. Hill - Construction Law MusingsI know, you’ve heard this over and over again here at Construction Law Musings: courts in Virginia will interpret a contract strictly and in a manner that gives meaning to its unambiguous terms.
A recent case out of the Eastern District of Virginia federal court, White Oak Power Constructors v. Mitsubishi Hitachi Power Systems, reinforces this point. The basic facts of the case relevant to this discussion and the Court’s opinion are these. Old Dominion Electric Cooperative (ODEC) hired White Oak Power Constructors (White Oak) to build a natural gas power plant. The contract between ODEC and White Oak provided for liquidated damages for delay and also contained a risk of loss provision making ODEC responsible for certain losses or damages due to property damage at the plant. I highly recommend that you read the facts of the case in full to get the details of the terms of these clauses.
Needless to say (or this case wouldn’t be the subject of a construction law blog), the project ran past completion date and liquidated damages were assessed to the tune of more than $50,000,000.00. The delay was alleged to have been caused in substantial part by property damage due to weather, fire, and ice among other causes.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Coverage for Collapse Ordered on Summary Judgment
November 21, 2022 —
Tred R. Eyerly - Insurance Law HawaiiA collapsed floor in a restaurant was found to be covered. J&J Fish on Center Street, Inc. v. Crum & Forster Spec. Ins. Co., 2022 U.S. Dist. LEXIS 163661 (D. Wis. Sept. 12, 2022).
J&J Fish rented property from Vision. Vision was obligated to keep the premises insured under an all-risk policy. Vision was also responsible for maintaining and repairing the property "including the slab flooring exterior walls of the premises." Vision never obtained insurance on the building, but J&J Fish secured a commercial property policy from Crum & Forster.
On May 29, 2020, approximately 25% of the building's slab floor, the section beneath the walk-in cooler, collapsed into the crawl space below. Dr. Daniel Wojnowski inspected the crawl space and observed overall dampness as well as a pool of water in the space. He concluded that the collapse occurred because the steel support beams and steel elements of the floor corroded after prolonged exposure to moisture. Based on this report, Crum & Forster denied coverage. J&J Fish sued and the parties moved for summary judgment.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
New York High Court: “Issued or Delivered” Includes Policies Insuring Risks in New York
December 20, 2017 —
Bethany Barrese & Samantha Martino - Case Alert BlogOn November 20th, the New York Court of Appeals reinstated a case seeking more than six million dollars in damages against the insurers for DHL Worldwide Express Inc. (“DHL”), originating from a fatal head-on car crash between Claudia Carlson and a truck owned by MVP Delivery and Logistics Inc. (“MVP”), a DHL contractor. The truck, which bore DHL’s logo, was owned by MVP and driven by an MVP employee. The MVP employee was running an errand unrelated to his job at the time of the accident. Mrs. Carlson’s husband sued the employee, DHL, and MVP. The jury award of $20 million was reduced to $7.3 million by the Appellate Division. MVP’s insurer paid Mr. Carlson just over $1 million, and the employee assigned his rights to any other insurance coverage to Mr. Carlson
Mr. Carlson sued DHL and its insurers, seeking the balance of the outstanding judgment pursuant to New York Insurance Law § 3420. The defendants successfully moved to dismiss Mr. Carlson’s claims, which dismissal was affirmed by the Appellate Division on the basis that § 3420 did not apply since the policies in question were not “issued or delivered” in New York; they had been issued in New Jersey and delivered in Washington and Florida. The Court of Appeals was subsequently presented with two questions: (1) whether the DHL policies fell within the purview of Insurance Law § 3420 as policies “issued or delivered” in New York; and (2) whether MVP was an “insured” pursuant to the “hired auto” provisions of DHL’s policies.
Reprinted courtesy of
Bethany Barrese, Saxe Doernberger & Vita, P.C. and
Samantha Martino, Saxe Doernberger & Vita, P.C.
Ms. Barrese may be contacted at blb@sdvlaw.com
Ms. Martino may be contacted at smm@sdvlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Structural Engineer Found Liable for Defects that Rendered a Condominium Dangerously Unsafe
June 22, 2016 —
Paul R. Cressman, Jr. – Ahlers & Cressman Construction Law BlogOn May 3, 2016, the Washington State Court of Appeals affirmed a jury’s verdict in favor of a condominium HOA against a structural engineer for $1,149,332 in damages.[1]
The project in question was The Pointe, an upscale condominium building in Westport, Washington. The developer was Dodson-Duus, LLC. The architect was Elkins Architects (“Elkins”). The structural engineer was Engineers Northwest, Inc. (“ENW”). ENW contracted with Elkins for the structural engineering work.
Birds flying past 3 construction cranesBoth the design and construction of the building suffered from defects. In particular, the lateral force resistance system was insufficient to withstand a large seismic event. The defects included improperly nailed shear walls, weak connections between shear walls and floor joists, improperly-sized floor sheathing, a weak second-floor diaphragm, and omitted hold-downs connecting shear walls to a steel beam. The use of gypsum sheathing also created a risk of corrosion to the building’s steel structure. Evidence tied each of these defects to some aspect of ENW’s structural calculations and designs. Evidence also tied omission of the hold-downs to the contractor’s construction decisions.
Read the court decisionRead the full story...Reprinted courtesy of
Paul R. Cressman, Jr., Ahlers & Cressman PLLC Mr. Cressman may be contacted at
pcressman@ac-lawyers.com