Lump Sum Subcontract? Perhaps Not.
August 20, 2019 —
David Adelstein - Florida Construction Legal UpdatesLump sum subcontract? Perhaps not due to a recent ruling where the trial court said “No!” based on the language in the subcontract and contract documents generally incorporated into the subcontract.
This is a ruling on an interpretation of a subcontract and contract documents incorporated into the subcontract that I do not agree with and struggle to fully comprehend. The issue was whether the subcontract amount was a lump sum or subject to an audit, adjustment, and definitization based on actual costs incurred. Of course, the subcontractor (or any person in any business) is not just interested in recouping actual costs, but there needs to be a margin to cover profit and home office overhead that does not get factored into field general conditions.
In United States v. Travelers Casualty and Surety Company, 2018 WL 6571234 (M.D.Fla. 2018), a prime contractor was hired to perform work on a federal project. During the work, the Government issued the prime contractor a Modification that had a not-to-exceed value and required the prime contractor to track its costs for this Modification separate from other contract costs. In other words, based on this Modification, the prime contractor was paid its costs up to a maximum amount and the prime contractor would separately cost-code and track the costs for this work differently than other work it was performing under the prime contract.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Idaho Supreme Court Address Water Exclusion in Commercial Property Exclusion
March 09, 2020 —
James M. Eastham - Traub LiebermanIn ABK, LLC v. Mid-Century Ins. Co., 2019 WL 7046393 (Idaho Dec. 23, 2019) an insured gas station owner sued its property insurance carrier for breach of contract and bad faith after the carrier denied coverage for loss caused by water contamination of the insured’s underground storage tanks. Mid-Century had denied coverage because the underground storage tanks were damaged by water -- which was an excluded peril under the policy. Mid-Century issued Business Owners Special Property Coverage to the insured which provided all-risk coverage for physical loss or damage. The policy contained a number of exclusionary provisions including a water exclusion which provided that the policy did not pay for loss or damage caused directly or indirectly by:
- Flood, surface water, waves, tides, tidal waves, overflow or any body of water, or their spray, all whether driven by wind or not; ...
- Water under the ground surface pressing on, or flowing or seeping through:
- Foundations, walls, floors or paved surfaces:
- Basements, whether paved or not; or
- Doors, windows or other openings.
In upholding the District Court’s ruling in favor of Mid-Century, the Idaho Supreme Court held that a clear reading of the unambiguous policy provides damage caused by surface water or water under the ground when flowing or seeping through other openings is excluded from coverage.
Read the court decisionRead the full story...Reprinted courtesy of
James M. Eastham, Traub LiebermanMr. Eastham may be contacted at
jeastham@tlsslaw.com
A Lack of Sophistication With the Construction Contract Can Play Out In an Ugly Dispute
November 07, 2022 —
David Adelstein - Florida Construction Legal UpdatesThere are times where a lack of sophistication can come back to haunt you. This is not referring to a lack of sophistication of the parties. The parties, themselves, could be quite sophisticated. This is referring to a lack of sophistication with the construction contract forming the basis of the relationship. While parties don’t always want to buy into the contract drafting and negotiation process, it is oftentimes the first document reviewed. Because contract terms and conditions are important. They govern the relationship, the risk, scope, amount, and certain outcomes with disputes. However, a lack of sophistication can play out when that contract that should govern the relationship, the risk, the scope, the amount, and certain outcomes doesn’t actually do that, or if it does, it does it poorly. An example of how bad a dispute can play out when it comes to the lack of sophistication on the front end is Avant Design Group, Inc. v. Aquastar Holdings, LLC, 2022 WL 6852227 (Fla. 3d DCA 2022), where a cost-plus contract was treated as a lump sum contract.
Here, an owner planned to perform an extensive interior build-out to a residential unit. The owner had an out-of-country architect; because the architect was not licensed in Florida, the owner hired a local architect/designer to oversee construction and obtain goods and services for the residential interior build-out. The contract was nothing but a proposal of items and costs. The proposal stated the owner “would pay the cost of goods and services of the vendors, plus pay a ‘20% Interior Design & Administrative Fee’” to the local designer. Avant Design Group, 2022 WL at *1. The proposal further stated, “This preliminary budget of the Client’s construction costs include [sic] anticipated costs for construction materials, labor and sales tax. Any other cost, including but not limited to freight, cartage, shipping, receiving, storage and delivery are not included in the preliminary budget and will be invoiced separately.” Id., n.2.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
California Court of Appeal Holds a Tenant Owes No Duty to Protect a Social Guest From a Defective Sidewalk Leading to a Condominium Unit
May 22, 2023 —
Garrett A. Smee & Lawrence S. Zucker II - Haight Brown & Bonesteel LLPOn May 5, 2023, the California First District Court of Appeal, Division One, issued an opinion in Moses v. Roger-McKeever (A164405), holding that a condominium tenant owes no duty to a social guest using a walkway that leads to the unit.
Eleanor Moses fell on a walkway outside a condo rented by Pascale Roger-McKeever. Moses would not have used the walkway but for Roger-McKeever’s invite to a small gathering for members of a political activist group. Upon entering the condo for the event that night, Moses brought to Roger-McKeever’s attention the poor lighting in the entryway. Roger-McKeever apologized, and stated that her landlord had delayed repairing the porch light. The accident supposedly happened on a short walkway that had three steps leading away from a street sidewalk. Supposedly, Moses tripped on the second step while leaving the social gathering because of the poor lighting.
Reprinted courtesy of
Garrett A. Smee, Haight Brown & Bonesteel and
Lawrence S. Zucker II, Haight Brown & Bonesteel
Mr. Smee may be contacted at gsmee@hbblaw.com
Mr. Zucker may be contacted at lzucker@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Client Alert: Service Via Tag Jurisdiction Insufficient to Subject Corporation to General Personal Jurisdiction
August 27, 2014 —
R. Bryan Martin and Kristian B. Moriarty - Haight Brown & Bonesteel LLPIn Martinez v. Aero Caribbean (No. 3:11-cv-03194-WHA, filed 8/21/2014), the United States Court of Appeals for the Ninth Circuit held service of process on a corporation's officer, within the forum state, does not establish general personal jurisdiction over the corporation unless the corporation's contacts with the forum render it essentially at home in the state.
Decedent, Lorenzo Corazon Mendoza, was traveling by airplane when the plane crashed, killing everyone aboard. Defendant Avions De Transport Régional (ATR) manufactured the airplane that crashed. Plaintiffs Lorenzo Martinez, Eliezer Martinez, Eliu Mendoza and Gloria Montes (Plaintiffs) filed suit against ATR as heirs of decedent.
ATR is a business entity organized under French law with its principal place of business in France. It is not licensed to do business in California, and it has no office or other physical presence there. It has purchased parts from California suppliers, sent representatives to California to promote its business, and advertised in trade publications available in California. It has also sold airplanes to a California corporation. Empire Airlines flies from Santa Barbara to Ontario using ATR planes on a regular basis; however, Empire Airlines purchased the ATR planes secondhand from third parties, and never directly from ATR. At the time of the crash, ATR North America (a wholly owned subsidiary of ATR) had its headquarters in Virginia, and has since relocated to Florida.
Reprinted courtesy of
R. Bryan Martin, Haight Brown & Bonesteel LLP and
Kristian B. Moriarty, Haight Brown & Bonesteel LLP
Mr. Martin may be contacted at bmartin@hbblaw.com; Mr. Moriarty may be contacted at kmoriarty@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Hammer & Hand’s Top Ten Predictions for US High Performance Building in 2014
January 22, 2014 —
Beverley BevenFlorez-CDJ STAFFOn Hammer & Hand’s blog, Sam Hagerman, Skylar Swinford, and Dan Whitmore discuss how they expect US high performance building policy to evolve in 2014. The three consultants and builders have built “some of the most notable high performance green building projects around, including Karuna House,” “Pumpkin Ridge Passive House,” and the “Glasswood Commercial Passive House Retrofit,” according to the blog. Hagerman and Whitmore also have served on the Passive House Alliance US board. Predictions cover topics such as Net Zero Energy to Net Positive Energy buildings, renewable energy productions, building energy codes, CO2 heat pumps, and more.
Read the court decisionRead the full story...Reprinted courtesy of
Orchestrating Bias: Arbitrator’s Undisclosed Membership in Philharmonic Group with Pauly Shore’s Attorney Not Grounds to Reverse Award in Real Estate Dispute
June 21, 2017 —
Lyndsey Torp - Snell & Wilmer Real Estate Litigation BlogThe California court of appeal recently issued an unpublished decision in Knispel v. Shore, 2017 WL 2492535, affirming a judgment confirming an arbitration award in a real estate dispute involving Pauly Shore. The court of appeal held that the arbitrator’s failure to disclose her membership in the Los Angeles Lawyers Philharmonic Group with the attorney representing Pauly was not grounds to overturn the judgment.
The underlying arbitration involved a dispute between Michael Scott Shore, on the one hand, and his brother, Pauly, among others, on the other hand, regarding certain residential property located on Sunset Boulevard near The Comedy Store in West Hollywood (owned and operated by their mother, Mitzi Shore). The parties agreed to arbitrate their dispute before Judge Aviva K. Bobb (Ret.) of the Alternative Resolution Center. Judge Bobb issued an award in favor of Pauly, and he petitioned the trial court to affirm the award. Michael opposed, contending the arbitrator failed to disclose that she and Pauly’s attorney had both been members of the Lawyers Philharmonic, for which they had been practicing and performing together since November 2010.
Read the court decisionRead the full story...Reprinted courtesy of
Lyndsey Torp, Snell & WilmerMs. Torp may be contacted at
ltorp@swlaw.com
Make Sure to Properly Perfect and Preserve Construction Lien Rights
December 07, 2020 —
David Adelstein - Florida Construction Legal UpdatesIf you recording a construction lien (referred to as a claim of lien) and looking to perfect your construction lien foreclosure rights, it is imperative that you work with counsel to ensure your rights are properly preserved. This is good practice!
A claim of lien must be served on an owner within 15 days after recording. Florida Statute s. 713.08(4)(c) says: “The claim of lien shall be served on the owner. Failure to serve any claim of lien in the manner provided in s. 713.18 before recording or within 15 days after recording shall render the claim of lien voidable to the extent that the failure or delay is shown to have been prejudicial to any person entitled to rely on the service.”
Florida Statute s. 713.18, hyperlinked for your review, includes the statutory ways to serve “notices, claims of lien, affidavits, assignments, and other instruments permitted or required under [Florida Statutes Chapter 713].”
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com