New Orleans Drainage System Recognized as Historic Civil Engineering Landmark
May 29, 2023 —
The American Society of Civil EngineersNEW ORLEANS, La. – The
American Society of Civil Engineers (ASCE) today recognized the New Orleans Drainage System in New Orleans, Louisiana as a
Historic Civil Engineering Landmark. The project was innovative and largely unprecedented for its time, and the first portions came online in the year 1900. The system now consists of 22 drainage pumping stations and 1,200 miles of network drains, as well as green infrastructure elements to manage stormwater runoff. The infrastructure is largely credited for making the existence of New Orleans possible, and the improved drainage and reduction in standing water contributed to better public health and reduced the number of malaria and typhoid deaths in the early 20th century.
New Orleans' position near the mouth of the Mississippi River made it a vital city for trade and commerce in the U.S. economy since the early 1800s, despite its problematic natural environment. The city was perched along the banks of the Mississippi River and next to Lake Pontchartrain, surrounded by swamps. Improvements to levee systems prevented the city from being inundated with flooding from the river, but rainfall became a pervasive issue as the city's population grew in the 1870s.
The drainage system was first proposed in 1876 to replace primitive "drainage machines," steam-powered paddle wheels that moved water runoff into canals that led to Lake Pontchartrain. The existing system was inefficient and could not handle the frequent, heavy tropical rain New Orleans experiences and could not lift water sufficiently to drain the city. After several proposals, construction on the current drainage system started in 1897, and the first portions of the system came online in 1900. The system drains stormwater through pipes and canals to reach drainage pump stations which expel the water into several bodies of water surrounding the city. Engineers have repeatedly expanded and enlarged the drainage system, including a massive investment in the drainage system authorized by the Southeast Louisiana Urban Flood Control Project and approved by Congress in 1996. The Sewerage and Water Board's green infrastructure plan is a critical partner and complement to the drainage system today.
The New Orleans Drainage System's design has inspired water management system design in communities around America and worldwide. In Southeastern Florida, water management systems using pumps and canals divert excess water away from heavily populated areas during heavy rain, including tropical storms and hurricanes. Engineers in Kolkata, India and Shanghai, China have also used drainage and pumping systems like the ones in New Orleans to assist with water management.
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
Replacement of Gym Floor Due to Sloppy Paint Job is Not Resulting Loss
January 02, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe court granted the insurer's motion for summary judgment finding damage to the gym floor due to a poor paint job was not a resulting loss. Bob Robinson Commercial Flooring, Inc. v. RLI Ins,. Co., 2023 U.S. Dist. LEXIS 196105 (D. Ark. Nov. 1, 2023).
Bob Robinson Commercial Flooring (BRCF) submitted a bid to the general contractor, Nabholz Construction Corporation, to install a vinyl athletic floor and striping at a middle school. The job also included the painting of a "Wildcat" logo the main gym floor. Therefore, BRCF's job was to install floors with proper painting and striping. Robert Liles and Robert Lines Parking Lot Services was the subcontractor hired to do the painting and striping. BRCF did not supervise or inspect Liles' work while it was ongoing.
Nabholz informed BRCF that there were problems with the floor painting, including crooked lines, incorrect markings, misplacement of the three point lines for the basketball surface, drips, smudges, etc. The gym floor was eventually rejected due to the nature of the vinyl flooring, once primer and paint were applied, the paint could not be removed and repainted. BRCF had to hire a new subcontractor to remove the flooring, install new flooring and then paint new lines. The cost for removal and replacement was $134,188.95.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Parol Evidence can be Used to Defeat Fraudulent Lien
March 27, 2019 —
David Adelstein - Florida Construction Legal UpdatesParol or extrinsic evidence can be used to defeat an argument that a lien is a fraudulent lien. And, just because a lien amount exceeds the total contract amount does not presumptively mean the lien is willfully exaggerated or recorded in bad faith. Finally, a ruling invalidating a construction lien can create the irreparable harm required to support a petition for writ of certiorari. All of these issues are important when dealing with and defending against a fraudulent lien and are explained in a recent case involving a dispute between an electrical subcontractor and its supplier.
In Farrey’s Wholesale Hardware Co., Inc. v. Coltin Electrical Services, LLC, 44 Fla.L.Weekly D130a (Fla. 2d DCA 2019), there were various revisions to the supplier’s initial purchase order, both from a qualitative and quantitative perspective, and a ninth-revised purchaser order was issued and accepted. The electrical subcontractor claimed that deliveries were late, unassembled, and did not include the required marking (likely the UL marking), to pass building inspections. As a result, the subcontractor withheld money from the supplier and the supplier recorded a lien in the amount of $853,773.16 and filed a foreclosure lawsuit.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
No Duty to Defend Suit That Is Threatened Under Strict Liability Statute
July 09, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe Washington Court of Appeals found there was no duty to defend the insured under a strict liability statute for alleged contamination when no action was threatened by the agency. Gull Indus., Inc. v. State Farm Fire and Cas. Co., 2014 Wash. App. LEXIS 1338 (Wa. Ct. App. June 2, 2014).
Gull leased a gas station to the Johnsons from 1972 to 1980. In 2005, Gull notified the Department of Ecology (DOE) that there had be a release of petroleum product at the station. DOE sent a letter acknowledging Gull's notice of suspected contamination. In 2009, Gull tendered its defense to its insurer, Transamerica Insurance Group. Gull also tendered its claims as an additional insured to the Johnson's insurer, State Farm. Neither insurer accepted the tenders.
Gull then sued the insurers, arguing they had a duty to defend. Gull contended that because the state statute imposed strict liability, the duty to defend arose whether or not an agency had sent any communications about the statute or cleanup obligations. The insurers moved for partial summary judgment. The trial court ruled in favor of the insurers.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Office REITs in U.S. Plan the Most Construction in Decade
July 09, 2014 —
Brian Louis – BloombergOffice buildings in top U.S. markets are getting so expensive that landlords are choosing to build rather than buy, spurring the most development by real estate investment trusts in at least a decade.
Office REITs, led by Boston Properties Inc. (BXP), Vornado Realty Trust (VNO) and Kilroy Realty Corp. (KRC), are planning to plow almost $11 billion into new projects, triple the amount just two years ago and the most in data going back to 2004, according to research firm Green Street Advisors Inc. Much of that is focused on the coasts, including San Francisco and New York, the areas with the most demand from both tenants and investors.
Prices for office buildings in major markets have surged past peak levels, lifted in part by sovereign-wealth funds and pensions willing to accept lower yields than other investors because they are seeking safe investments. For REITs, which have to answer to shareholders seeking higher returns, building is often a better option than competing with institutional buyers.
Read the court decisionRead the full story...Reprinted courtesy of
Brian Louis, BloombergMr. Louis may be contacted at
blouis1@bloomberg.net
Bert L. Howe & Associates Brings Professional Development Series to Their Houston Office
May 19, 2014 —
Beverley BevenFlorez-CDJ STAFFBHA’s Professional Development Series provides seminar attendees with a heightened level of knowledge and understanding on a wide range of subjects covering construction and construction defect litigation, tailored to the unique needs of local counsel and insureds.
The next seminar in this series, THE RESIDENTIAL CONSTRUCTION PROCESS & CONSTRUCTION DEFECT LITIGATION, will be presented on June 13th.
This course has been approved for Minimum Continuing Legal Education credit by the State Bar of Texas Committee on MCLE in the amount of 1.0 credit hours, of which 0.0 credit hours will apply to legal ethics/professional responsibility credit.
The seminar will be presented by Don MacGregor, general contractor and project manager, at BHA’s Houston office during the noontime hour, and luncheon will be provided. As with all BHA Professional Development activities, there is no cost for participation.
Water intrusion through doors, windows and roofing systems, as well as soil and foundation-related movement, and the resultant damage associated therewith, are the triggering effects for the vast majority of homeowner complaints today and serve as the basis for most residential construction defect litigation.
The graphic and animation-supported workshop/lecture activity will focus on the residential construction process, an examination of associated damages most often encountered when investigating construction defect claims, and the inter-relationships between the developer, general contractor, sub trades and design professionals.
Typical plaintiff homeowner/HOA expert allegations will be examined in connection with those building components most frequently associated with construction defect and claims litigation.
The workshop will examine:
* Typical construction materials, and terminology associated with residential construction
* The installation process and sequencing of major construction elements, including interrelationship with other building assemblies
* The parties (subcontractors) typically associated with major construction assemblies and components
* The various ASTM standard testing protocols utilized to field test buildings
* An analysis of exposure/allocation to responsible parties
Attendance at THE RESIDENTIAL CONSTRUCTION PROCESS & CONSTRUCTION DEFECT LITIGATION seminar will provide the attendee with:
* A greater understanding of the terms and conditions encountered when dealing with common construction defect issues
* A greater understanding of contractual scopes of work encountered when reviewing construction contract documents
* The ability to identify, both quickly and accurately, potentially responsible parties
* An understanding of damages most often associated with construction defects, as well as a greater ability to identify conditions triggering coverage
* Assistance in the satisfaction of important continuing education requirements.
Course #: 901290467
Sponsor #: 14152
BHA Houston Office
800 Town & Country Blvd.
Suite 300
Houston, TX 77024
To register for the event, please email Don MacGregor at dmac@berthowe.com.
Read the court decisionRead the full story...Reprinted courtesy of
Florida Insurance Legislation Alert - Part I
April 18, 2023 —
Gregory D. Podolak & Holly A. Rice - Saxe Doernberger & Vita, P.C.On March 24, 2023, Florida Governor Ron DeSantis signed into law House Bill 837 which significantly impacts several critical aspects of modern Florida civil litigation, particularly insurance disputes. SDV has actively monitored the evolution of this legislation, including substantial commentary from the legal and insurance communities that followed its enactment. In this multi-part series, we will explore the critical developments impacting policyholders and what to expect moving forward.
The insurance-related headlines overwhelmingly concentrate on one key area: the elimination of one-way attorney fee recovery for property insurance policyholders. This development represents a key change in longstanding Florida insurance law and is worthy of attention - but it doesn’t tell the whole story.
Reprinted courtesy of
Gregory D. Podolak, Saxe Doernberger & Vita, P.C. and
Holly A. Rice, Saxe Doernberger & Vita, P.C.
Mr. Podolak may be contacted at GPodolak@sdvlaw.com
Ms. Rice may be contacted at HRice@sdvlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Miller Act Claim for Unsigned Change Orders
June 30, 2016 —
David Adelstein – Florida Construction Legal UpdatesContracts and subcontracts often contain language that requires
change orders to be in writing and that no change order work shall be performed unless agreed to in advance in a signed change order. Oftentimes change order work is performed but the parties have not complied with the strict requirements of the contract by having this work signed off by the parties in a change order prior to the commencement of the work. Well, can such requirements be
waived? If so, can such change orders form the basis of a
Miller Act claim? The answer is generally yes provided the party arguing waiver can support the waiver with evidence (that the other party voluntarily relinquished the requirements through its course of conduct / actions).
Read the court decisionRead the full story...Reprinted courtesy of
David M. Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com