California MCLE Seminar at BHA Sacramento July 11th
June 11, 2014 —
Kimberly Albarq-CDJ STAFFThere are just three weeks remaining to sign up for Bert L. Howe & Associate’s next California MCLE seminar, UNDERSTANDING CONSTRUCTION DEFECT LITIGATION.
This activity will be presented on Friday, July 11th at noon, at BHA’s Sacramento office:
2520 Venture Oaks Way
Suite 435
Sacramento, CA 95833
There is no cost for attendance at this seminar and lunch will be provided.
This course has been approved for Minimum Continuing Legal Education credit by the State Bar of California Committee on MCLE in the amount of 1.0 credit hours, of which 0.0 credit hours will apply to legal ethics/professional responsibility credit. The seminar will be presented by Don MacGregor, general contractor and project manager.
Water intrusion through doors, windows and roofing systems, as well as soil and foundation-related movement, and the resultant damage associated therewith, are the triggering effects for the vast majority of homeowner complaints today and serve as the basis for most residential construction defect litigation. The graphic and animation-supported workshop/lecture activity will focus on the residential construction process from site preparation through occupancy, an examination of associated damages most often encountered when investigating construction defect claims, and the inter-relationships between the developer, general contractor, sub trades and design professionals. Typical plaintiff homeowner/HOA expert allegations will be examined in connection with those building components most frequently associated with construction defect and claims litigation.
The workshop will examine:
* Typical construction materials, and terminology associated with residential construction
* The installation process and sequencing of major construction elements, including interrelationship with other building assemblies
* The parties (subcontractors) typically associated with major construction assemblies and components
* An analysis of exposure/allocation to responsible parties.
Attendance at THE UNDERSTANDING CONSTRUCTION DEFECT LITIGATION seminar will provide the attendee with:
* A greater understanding of the terms and conditions encountered when dealing with common construction defect issues
* A greater understanding of contractual scopes of work encountered when reviewing construction contract documents
* The ability to identify, both quickly and accurately, potentially responsible parties
* An understanding of damages most often associated with construction defects, as well as a greater ability to identify conditions triggering coverage
To register for the event, please email Don MacGregor at dmac@berthowe.com. If you have any questions, please feel free to contact Don at (800) 482-1822 (office) or (714) 713-4956 (cell).
Read the court decisionRead the full story...Reprinted courtesy of
Consult with Counsel when Preparing Construction Liens
April 13, 2017 —
David Adelstein – Florida Construction Legal UpdatesAll too often entities prepare their own construction liens. Sure, it is an effective way to save a few bucks. No doubt about it. But, by doing so, you are (i) not relying on advice of counsel that is important when it comes to lien preparation and (ii) not relying on strategy that goes along with the preparation of a lien. When you are liening, the reason you are doing so is because you have not been paid. You therefore want to collateralize your nonpayment against the real property—the leverage of a construction lien. This is a very beneficial statutory tool if implemented correctly, so it only makes sense to do it “strategically” right.
A construction lien is a statutory form. So, how hard can it be? Filling out the “form” is not hard, however, there is legal significance to the information and amounts included in a lien. For instance:
- There is significance to the amount you are liening. Are you liening for disputed change order work? Are you liening for amounts unrelated to base contract work?
- There is significance to the final furnishing date. Are you liening within 90 days of performing base contract work unrelated to punchlist or warranty work?
- There is significance to date the Notice to Owner was served (if you are not in privity with the owner). Was the Notice to Owner served within 45 days of initial furnishing?
- There is significance to the legal description identified in the lien. Are you liening the right property based on the type of project you are working on?
- There can even be significance to the initial furnishing date. Assuming you are the general contractor, what was your initial furnishing date in comparison with when the Notice of Commencement was recorded? If you are not a general contractor, when was the initial furnishing date in comparison with when you served the Notice to Owner?
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
Parties to an Agreement to Arbitrate May be Compelled to Arbitrate with Non-Parties
February 28, 2022 —
Paul R. Cressman Jr. - Ahlers Cressman & Sleight PLLCIn a recent case decided by Division III of the Washington Court of Appeals, David Terry Investments, LLC – PRC v. Headwaters Development Group LLC,[1] the court held that parties to an arbitration agreement can be compelled to arbitrate related claims with non-parties to the agreement based on the doctrine of equitable estoppel.
The case involved six joint venture agreements to develop three separate properties in Spokane, two joint venture agreements per property. One entity, David Terry Investments, LLC – PRC (“DTI”), owned by David Terry, was a partner in each of the six joint venture agreements. DTI joint ventured with S.G. Spady Consulting (“SGSC”) and with Headwaters Development Group LLC (“HDG”) separately for each of the three properties. HDG owned the three properties, and SGSC was to provide construction management advice. Steve Spady was the principal of both HDG and SGSC. Stoneridge was a licensed general contractor, the principal of which was also Steve Spady.
Read the court decisionRead the full story...Reprinted courtesy of
Paul R. Cressman Jr., Ahlers Cressman & Sleight PLLCMr. Cressman may be contacted at
paul.cressman@acslawyers.com
Washington’s Court of Appeals Protects Contracting Parties’ Rights to Define the Terms of their Indemnity Agreements
March 19, 2024 —
Margarita Kutsin - Ahlers Cressman & Sleight PLLCIt has long been the law in Washington that contracting parties are free to draft contractual indemnity agreements to allocate risk arising from performance of the work, and Courts will generally enforce those agreements as written. This well-settled principle was recently reaffirmed in King County v. CPM Development Corp., dba ICON Materials[1] a decision from Division I of the Washington Court of Appeals, wherein one party to an indemnity agreement attempted to evade its contractual obligations by arguing that certain common law indemnity principles supersede the written terms. This appeal followed a multi-week jury trial from which the client and Ahlers Cressman and Sleight legal team, including Lindsay Watkins, Klien Hilliard, and Christina Granquist, obtained a seven-figure judgment in the client’s favor, including an award of all attorneys’ fees and costs.
ICON was the general contractor on a Vashon Island Highway Pavement project for King County. Part of the work on the project involved hauling away and disposing of ground milled asphalt (the “millings”) at King County-approved sites. ICON and D&R Excavating Inc., (“D&R”) executed a subcontract for D&R to perform that work. The subcontract incorporated the contract between ICON and King County, including the obligation to stockpile millings only at approved sites. D&R, however, did not obtain the requisite approvals from King County, and placed the millings at various sites on the Island, including locations that King County explicitly rejected.
Read the court decisionRead the full story...Reprinted courtesy of
Margarita Kutsin, Ahlers Cressman & Sleight PLLCMs. Kutsin may be contacted at
margarita.kutsin@acslawyers.com
Can a Non-Union Company Be Compelled to Arbitrate?
August 02, 2017 —
Wally Zimolong - Supplemental ConditionsSome of the most viewed topics on this blog are those concerning double breasted company. That is a two separate firms, commonly owned, one that is a signatory to a union and the other that is merit shop.
An issue frequently encountered with double breasted construction companies is an union arbitrator’s jurisdiction over the non-signatory firm. The issue usually goes something like this. A signatory employer’s collective bargaining agreement contains language prohibiting double breasting (which could be invalid). The collective bargaining agreement also contains an arbitration provision requiring all disputes concerning a breach of the agreement (a grievance) be decided by an arbitrator in private arbitration. The union files a demand for arbitration claiming that the union signatory has breached the collective bargaining agreement’s anti-dual shop provision. The union names the non-union firm as a party to the arbitration based on its status as an alleged “single employer.”
Read the court decisionRead the full story...Reprinted courtesy of
Wally Zimolong, Zimolong LLCMr. Zimolong may be contacted at
wally@zimolonglaw.com
Denver Airport Terminates P3 Contract For Main Terminal Renovation
November 12, 2019 —
Mark Shaw - Engineering News-RecordIn a move that stunned transportation planners around the country, Denver International Airport terminated the contractor team working on a $650-million terminal renovation. The move also ended the airport’s $1.8-billion public-private partnership with Great Hall Partners, a consortium led by Ferrovial Airports, with partners Saunders/JLC Infrastructure.
Mark Shaw, Engineering News-Record
Mr. Shaw may be contacted at shawm@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Construction Law Job Opps and How to Create Them
October 24, 2021 —
Christopher G. Hill - Construction Law MusingsFor this weeks Guest Post Friday, Kirsten Grant (@kgrantcareers on Twitter) has graced us with her thoughts on a very timely topic: How to get a job as a construction attorney. Before becoming a career specialist at Kaplan University, one of the largest online universities in the nation, Kirsten Grant had faxed almost 1000 resumes, e-mailed close to 300 resumes, personally mailed 20 resumes with each one featuring “special inserts” to encourage hiring managers to read her resume (50% of those resumes received calls for an interview) and interviewed with 50 companies over the course of 5 months. Based on the feedback hiring managers provided, in addition to 10 years experience in human resources, training, recruiting and staffing she REALLY learned what hiring managers look for in a candidate and today helps over 40,000 adult learners understand how to conduct successful job searches and earn a promotions.
As the real estate industry makes torrid adjustments to right itself due to foreclosures, short sales, and falling house prices, court rooms are seeing more construction law cases. As houses and properties fall into states of disrepair and as efforts are taken to repair them a chain of events take place:
- Property is purchased
- Contractors are hired to make repairs to a property
- The selected contractor files permits for the type of work performed
- After work has been performed, contactor receives compensation
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Business Risk Exclusions (j) 5 and (j) 6 Found Ambiguous
April 22, 2019 —
Tred R. Eyerly - Insurance Law HawaiiReversing the district court's grant of summary judgment in favor of the insurer, the Tenth Circuit found that exclusions (j) 5 and (j) 6 were ambiguous as applied to the facts of the case. MTI, Inc. v. Emplrs. Ins. Co., 2019 U.S. App. LEXIS 2543 (10th Cir. Jan. 25, 2019).
Western Farmers Electrical Cooperative (WFEC) owned cooling towers which were serviced by MTI, Inc. Wausau provided a CGL policy to MTI.
In 2011, MTI found that anchor bolts in Cooling Tower 1 were corroded. WFEC hired MTI to make repairs by installing new anchor castings with anchor bolts and anchor adhesive.
On May 23, 2011, MTI employees removed all of the corroded anchor bolts in Tower 1. Because the adhesive applicator had not yet arrived, MTI did not immediately install new anchor bolts. On the night of May 24, strong winds struck the tower, causing it to lean and several structural components broke. Due to the extent of the structural damage, removal and replacement of the tower was determined to be the only viable option.
Read the court decisionRead the full story...Reprinted courtesy of