Construction Delays: Which Method Should Be Used to Calculate Delay?
July 25, 2021 —
David Adelstein - Florida Construction Legal UpdatesIf you need to prove and allocate construction project delays, you should engage a scheduling consultant qualified with CPM (critical path method) analysis. You should also engage counsel to assist in preserving your rights, as well as presenting and maximing your arguments for delay.
There are numerous methodologies used to quantify and allocate delay. You want to discuss the most effective analysis for your case and facts including whether you want/should use a forward-looking prospective analysis or a backward-looking retrospective analysis that factors in as-built data. In doing so, you want to make sure you understand the pros and cons of each methodology including the bases to attack the methodology that will be subject to cross-examination. The five primary CPM methodologies are as follows:
- As-Planned Versus As-Built. This methodology compares the as-planned baseline schedule to an as-built schedule reflecting progress to assign delay. An as-built schedule that reflects progress includes actual start dates, finish dates, and durations. The actual dates and durations are compared with the as-planned dates and durations on the baseline schedule to determine delay. Under this methodology, the delay impact is determined retrospectively.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Insureds' Experts Insufficient to Survive Insurer's Motion for Summary Judgment
October 17, 2023 —
Tred R. Eyerly - Insurance Law HawaiiThe magistrate recommended that insurer's motion for summary judgment be granted due to the insureds' expert's inability to present genuine issues of material fact. Walker v. Century Sur. Co., 2023 U.S. Dist. LEXIS 142408 (E.D. Texas July 17, 2023).
The insureds' property sustained damage from Hurricane Laura. Colonial Claims inspected the property for Century and reported that a portion of the roof was damaged by the hurricane. Century paid insureds $2,212,34. Van Fisher, an engineer with Envista Forensics, then inspected the interior of the property on Century's behalf. Fisher reported that there was some covered interior damage caused by a leak from a storm-created opening in the roof. However, Fisher further reported that there was other interior damage caused by existing water leaks not attributed to the hurricane and thus not covered by the policy. Century then paid the insureds an additional $485.05 based on Fisher's inspection.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
The Harmon Hotel Construction Defect Trial to Begin
October 29, 2014 —
Beverley BevenFlorez-CDJ STAFFThe trial involving the Las Vegas Harmon Hotel, which is currently being demolished piece by piece due to construction defects, is ready to begin six years after the defects were first discovered, reported the Las Vegas Review-Journal. It’s an unusual case for multiple reasons. The trial is expected to last a year, and the number of attorneys involved in the case required chairs to be removed from the galley to accommodate lawyer tables, which are wired with monitors and microphones. In addition, “two 80-inch monitors are being installed for the jury.”
The Las Vegas Review-Journal further reported that “each party will have its own technology team to display the more than 3 million digitally stored pieces of evidence.” Michael Doan, the court’s information technology director, told the Las Vegas Review-Journal that the “paper list of that evidence fills more than 100 document-storage boxes.”
The case “involves more than $400 million in damage claims.” Construction on the Harmon Tower was stopped after a “structural engineer hired by MGM Resorts determined the building was unsafe and could topple if an earthquake of a magnitude of 7.7 were to hit Las Vegas.”
Read the court decisionRead the full story...Reprinted courtesy of
De-escalating The Impact of Price Escalation
August 10, 2021 —
Brian C. Padove - ConsensusDocsWhat happens when construction material prices abruptly rise by 15%, 35%, 50%? Moreover, what happens to a construction project when such volatility occurs? While there is no definite answer, delays in procuring such materials and associated cost overruns will likely impact the construction project. The last 15 months contractors have had to work through extraordinary construction material price increases, such as a 90% price increase for lumber from April 2020 to April 2021. While there is no statistic quantifying the impact these increases have had on the construction industry, the increases surely have had an influence, whether it has been through lost profits, delays, or damage to contractors’ otherwise strong reputation for timely performance.
Considerations Prior To Contract Execution
The first way to mitigate price escalation is identifying materials most susceptible to price volatility during the bidding process and then having an open discussion with upstream parties regarding the potential price volatility. Additionally, the bid may also include either (1) an allowance for the materials providing additional funds, if necessary, should the material price increase, or (2) a shortened timeframe in which the bid is open, which would lessen the time in which a price shift may occur.
Read the court decisionRead the full story...Reprinted courtesy of
Brian C. Padove, Watt, Tieder, Hoffar & Fitzgerald, LLPMr. Padove may be contacted at
bpadove@watttieder.com
Economic Loss Rule Bars Claims Against Manufacturer
November 02, 2020 —
David Adelstein - Florida Construction Legal UpdatesThe economic loss rule lives to bar a claim against a product manufacturer in a real estate transaction. In a products liability action, there needs to be personal injury or property damage, other than to the property itself, in order to recover economic damages. Otherwise, the economic loss rule will bar the recovery of such economic losses when the economic losses deal to the product itself. This is important to keep in mind in any product liability action against a manufacturer.
In a recent case, 2711 Hollywood Beach Condominium Assoc’n, Inc., v. TRG Holiday, Ltd., 45 Fla. L. Weekly D2179a (Fla. 3d DCA 2020), a condominium association purchased the condominium from the developer. Subsequently, it noticed leaks with the fire suppression system in the condominium and sued multiple parties for damages for repairs due to the leaks and the replacement of the fire suppression system. One of the parties sued in negligence and strict liability was a manufacturer of pipe fittings used in the fire suppression system. The manufacturer moved for summary judgment based on the economic loss rule and relying on the 1993 Florida Supreme Court opinion in Casa Clara Condominium Assoc’n v. Charley Toppino & Sons, Inc., 620 So.2d 1244 (Fla. 1993), holding “the economic loss rule limited a defendant’s tort liability for allegedly defective products to injuries caused to persons or damage caused to property other than the defective product itself.” 2711 Hollywood Beach Conominium Assoc’n, supra. The trial court agreed with the manufacturer and granted summary judgment. On appeal, the Third District affirmed based on the economic loss rule:
The Association bargained for, purchased and received a building; [the manufactuer’s] fittings were only a component of the FSS [fire suppression system], incorporated into the building. Applying the rule set forth in Casa Clara, the Association purchased a completed building from the developer. [The manufactuer’s] fittings were “an integral part of the finished product and, thus, did not injure ‘other’ property.” Injury to the building itself is not injury to “other” property because the product purchased by the Association was the building. See Casa Clara, 620 So. 2d at 1247. The economic loss rule therefore bars the Association’s recovery as to [the manufacturer] to the extent that it sought damages to replace the FSS [fire suppression system] and repair damage to the building.
2711 Hollywood Beach Conominium Assoc’n, supra (internal citations omitted).
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
The Brooklyn Condominium That’s Reinventing Outdoor Common Space
October 24, 2022 —
Alexandra Lange - BloombergCourtyard apartments have a long history in the US, particularly in temperate climes, where shaded outdoor corridors and centralized playspaces can be year-round amenities. New York City, however, has only selectively embraced this approach, with private yards and public parks taking up the slack. A new 18-unit condominium, 450 Warren — one of four planned Brooklyn collaborations between architects SO-IL and developers Tankhouse — aims to change that relationship, while also twisting the idea of common outdoor space into something that gets used.
Rather than creating one large courtyard, with the open space protected from the street by an L-shaped plan, SO-IL chopped up the outdoor amenities, betting that smaller, more carefully shaped and planted terraces would be more popular than a large undifferentiated expanse of grass. The building’s plan reads as three towers connected by curvy concrete walkways.
The building sits across the street from the Gowanus Houses, a public housing development, completed in 1949 with towers of up to 14 stories. The area was rezoned for denser mixed-use development in 2021, but when SO-IL and Tankhouse were developing the plans, regulations limited building heights to a maximum of five stories.
Read the court decisionRead the full story...Reprinted courtesy of
Alexandra Lange, Bloomberg
Near-Zero Carbon Cement Powers Sustainable 3D-Printed Homes
August 07, 2023 —
Aarni Heiskanen - AEC BusinessEco Material Technologies and Hive 3D have unveiled the first 3D-printed homes using near-zero carbon cement as part of a housing project called The Casitas @ The Halles.
The homes, ranging from 400 to 900 square feet, are constructed using Eco Material’s durable, longer-lasting cement called PozzoCEM Vite®. The cement replaces 100% of traditional Portland cement, has 92% lower emissions, and sets much faster.
Hive 3D has developed a system to mix Eco Material’s cement replacement products with locally-sourced aggregates on-site, enabling cost-efficient and affordable construction. The collaboration aims to offer sustainable housing solutions and transition the construction industry away from high-carbon materials.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Toll Brothers Honored at the Shore Builders Association of Central New Jersey Awards
May 13, 2024 —
Toll BrothersFREEHOLD, N.J., May 07, 2024 (GLOBE NEWSWIRE) --
Toll Brothers, Inc. (NYSE:TOL), the nation's leading builder of luxury homes, today announced that the Company's New Jersey Division was honored with six awards at the 2024 Fabulous Achievements in Marketing Excellence (FAME) Awards held at South Gate Manor in Freehold, New Jersey.
Presented by the Shore Builders Association of Central New Jersey, the FAME Awards honor home builders of the New Jersey Builders Associations who have made major contributions to the home building industry. The awards span categories from product and design to advertising, marketing, and professional achievements. Toll Brothers was selected as the winner in the following categories:
For more information on Toll Brothers communities in New Jersey, visit
TollBrothers.com/NewJersey.
About Toll Brothers
Toll Brothers, Inc., a Fortune 500 Company, is¬ the nation's leading builder of luxury homes. The Company was founded 57 years ago in 1967 and became a public company in 1986. Its common stock is listed on the New York Stock Exchange under the symbol "TOL." The Company serves first-time, move-up, empty-nester, active-adult, and second-home buyers, as well as urban and suburban renters. Toll Brothers builds in over 60 markets in 24 states: Arizona, California, Colorado, Connecticut, Delaware, Florida, Georgia, Idaho, Illinois, Maryland, Massachusetts, Michigan, Nevada, New Jersey, New York, North Carolina, Oregon, Pennsylvania, South Carolina, Tennessee, Texas, Utah, Virginia, and Washington, as well as in the District of Columbia. The Company operates its own architectural, engineering, mortgage, title, land development, smart home technology, and landscape subsidiaries. The Company also develops master-planned and golf course communities as well as operates its own lumber distribution, house component assembly, and manufacturing operations.
Read the court decisionRead the full story...Reprinted courtesy of