Court Denies Insured's Motion to Dismiss Complaint Seeking to Compel Appraisal
March 13, 2023 —
Tred R. Eyerly - Insurance Law HawaiiThe court denied the insured's motion to dismiss after the insurer filed suit to compel an appraisal. Allied Trust Ins. Co. v. Tsang, 2023 U.S. Dist. LEXIS 352 (E.D. La. Jan. 3, 2023).
The insureds reported damage to their property arising from Hurricane Ida. The insurer, Allied Trust, investigated and determined that the covered damage was $1,978.18, which was less that the policy's deductible. The insureds estimated that the covered damage was $135,270.78.
Allied Trust invoked the appraisal provision. Allied Trust later filed suit alleging the insureds failed to comply and participate in the appraisal. The insureds moved to dismiss the complaint as moot. In their motion, the insureds argued that because they were now complying with the appraisal clause, all relief sought by Allied Trust had either already occurred or was currently underway.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Fifth Circuit Reverses Summary Judgment Award to Insurer on Hurricane Damage Claim
December 18, 2022 —
Tred R. Eyerly - Insurance Law HawaiiThe Fifth Circuit reversed the district court's grant of summary judgment to the insurer on a property damage claim arising from Hurricane Harvey. Advanced Indicator and Manufacturing, Inc. v. Acadia Ins. Co., 50 F.4th 469 (2022).
After Hurricane Harvey struck southern Texas in 2017, Advanced submitted a claim to Acadia for damage to its building that it claimed was caused by the hurricane's winds. Acadia sent an adjuster, Nick Warren, as well as an engineer, Jason Watson. Watson determined that pre-existing conditions - including ongoing leaks from deterioration and poor workmanship - caused the damage, rather than winds from Hurricane Harvey. Warren adopted these conclusions in his recommendations to Acadia. Acadia denied Advanced's claim based on these reports.
Advanced sued Acadia, alleging breach of contract and bad faith. Advanced filed a motion to remand to state court which was denied. Acadia moved for summary judgment arguing that it did not breach the policy and that Advanced could not segregate any damages caused by hurricane from pre-existing damage. The district court granted Acadia's motion, finding that Acadia's denial of Advanced's claim was based on "extensive consideration of the evidence." Further, Advanced failed to carry its burden of showing that covered and non-covered damages could be segregated as required by Texas's concurrent causation doctrine. Finally, the bad faith claim was dismissed because there was no breach of contract.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
15 Wilke Fleury Lawyers Recognized in 2020 Northern California Super Lawyers and Rising Stars Lists
August 17, 2020 —
Wilke Fleury LLPWilke Fleury is proud to announce that 15 of our astounding attorneys were featured in the Annual List of Top Attorneys in the 2020 Northern California Super Lawyers magazine.
Super Lawyers rates attorneys in each state using a patented selection process; they also publish a yearly magazine issue that regularly produces award-winning features on selected attorneys.
Wilke Fleury LLP
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
In All Fairness: Illinois Appellate Court Finds That Arbitration Clause in a Residential Construction Contract Was Unconscionable and Unenforceable
August 22, 2022 —
Gus Sara - The Subrogation StrategistIn Bain v. Airoom, LLC, No. 1-21-001, 2022 Ill. App. LEXIS 241, the Appellate Court of Illinois (Appellate Court) considered whether the lower court erred in enforcing an arbitration clause in a construction contract between the parties and, as a result, dismissing the plaintiff’s lawsuit. The Appellate Court found that even if the arbitration clause was enforceable, the appropriate action would have been for the court to stay the lawsuit, as opposed to dismissing the case entirely. The Appellate Court then considered the language of the arbitration clause and found that several provisions were substantively unconscionable, which rendered the entire arbitration clause unenforceable. The Appellate Court reversed the lower court’s decision compelling arbitration and reinstated the plaintiff’s complaint.
In 2018, the plaintiff, Ms. Bain, a disabled senior citizen, hired the defendant, Airoom, LLC (Airoom), to renovate her home. Airoom provided its “Cash Sales Contract,” which included a binding arbitration clause. The clause required that any dispute arising or relating to the contract be resolved by binding arbitration through the American Arbitration Association (AAA), using the Construction Industry Arbitration Rules and Mediation Procedures (Construction Industry Rules).
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
New Jersey Traffic Circle to be Eliminated after 12 Years of Discussion
February 04, 2014 —
Beverley BevenFlorez-CDJ STAFFThe online publication New Jersey.com reported that on February 6th a “Pre-Construction Public Information hearing” will be held in Little Ferry, New Jersey, to discuss “the upcoming Route 46 Circle Elimination construction project.” The project includes “installation of a storm water pump station” as well as reconfiguring the circle into “a conventional four-way signalized intersection with a brand new traffic signal.”
Conti Enterprises of Edison was awarded the bid “at a cost of $33,837,739,” according to New Jersey.com. The project, which has been discussed for over a decade, stalled over combining the elimination of the traffic school with rehabilitation of a bridge. Improvements include “replacing of the entire bridge deck, structural steel member replacement and strengthening, sidewalk replacement on both sides of the structure and substructure patching, crack sealing and reconstruction where needed.”
The informational meeting will introduce the public to the engineer and contractor for the project. "This information session will help residents learn more about the project and what to expect as the state undertakes this work," Little Ferry Mayor Mauro Raguseo told New Jersey.com. "I wish we could fast forward to the completion of the project so we can realize the benefits without the headaches, but that's not reality. We all need to be prepared."
Read the court decisionRead the full story...Reprinted courtesy of
Massachusetts Pulls Phased Trigger On Its Statute of Repose
December 21, 2020 —
Kyle Rice - The Subrogation SpecialistIn D’Allesandro v. Lennar Hingham Holdings, LLC, 486 Mass 150, 2020 Mass. LEXIS 721, the Supreme Judicial Court of Massachusetts answered a certified question regarding how to apply the Massachusetts statute of repose, Mass. Gen. Laws ch. 260, § 2B, in regards to phased construction projects. The court held that, in this context, the completion of each individual “improvement” to its intended use, or the substantial completion of the individual building and the taking of possession for occupancy by the owner or owners, triggers the statute of repose with respect to the common areas and limited common areas of that building. Additionally, the court held that where a particular improvement is integral to, and intended to serve, multiple buildings (or the development as a whole), the statute of repose is triggered when the discrete improvement is substantially complete and open to its intended use.
In D’Allesandro, the action arose out of the construction, marketing, sale and management of the Hewitts Landing Condominium (the Condominium) project. Ultimately, 150 units were constructed over 24 phases of construction, enclosed in 28 different buildings. Throughout construction, the project’s architect submitted declarations to the Town of Hingham swearing that the individual units were “substantially complete” and could be occupied for their intended use. The Town of Hingham then issued certificates of occupancy for the unit or building.
Read the court decisionRead the full story...Reprinted courtesy of
Kyle Rice, White and WilliamsMr. Rice may be contacted at
ricek@whiteandwilliams.com
Beginning of the 2020 Colorado Legislative Session: Here We Go Again
February 10, 2020 —
David M. McLain – Colorado Construction LitigationThe 2020 Colorado legislative session started on Wednesday, January 8th. It seems like there will be plenty of issues this year to which home builders will want to pay close attention. On January 13th, Senators Fenberg, Foote, and Jackson sponsored SB 20-093, known as the “Consumer and Employee Dispute Resolution Fairness Act.”
For certain consumer and employment arbitrations, the act:
- Prohibits the waiver of standards for and challenges for evident partiality prior to a claim being filed and requires any waiver of such provisions after the claim is filed to be in writing;
- Provides that the right of a party to challenge an arbitrator based on evident partiality is waived if not raised within a reasonable time of learning of the information leading to the challenge but that such right is not waived if caused by the opposing party;
- Establishes ethical standards for arbitrators; and
- Requires specified public disclosures by arbitration services providers but includes protections for certain confidential information.
Read the court decisionRead the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & RoswellMr. McLain may be contacted at
mclain@hhmrlaw.com
Is Equipment Installed as Part of Building Renovations a “Product” or “Construction”?
April 10, 2019 —
Joshua Lane - Ahlers Cressman & Sleight PLLCA statute of repose terminates the right to file a claim after a specified time even if the injury has not yet occurred.[1] The construction statute of repose bars claims arising from construction, design, or engineering of any improvement upon real property that has not accrued within six years after substantial completion.[2] But what constitutes an “improvement upon real property” necessitating application of the six-year bar, and when does the bar NOT apply?
The Washington Court of Appeals recently addressed these questions in Puente v. Resources Conservation Co., Int’l.[3] There, the personal representative of the estate of Javier Puente sued several parties after Mr. Puente, an employee of a manufacturer, suffered fatal boric acid burns in 2012 while performing maintenance on a pump system installed at the manufacturer’s facility in 2002. The estate alleged claims of negligence and liability under the Washington Product Liability Act (WPLA).[4] The trial court granted summary judgment to defendants, concluding that the installed pump system constituted a statutory “improvement upon real property” and the six-year statute of repose applied. The estate appealed.