Seller Cannot Compel Arbitration for Its Role in Construction Defect Case<
March 01, 2012 —
CDJ STAFFThe buyer of a leaky home in Venice, California cannot be compelled to arbitration with the seller in a construction defect lawsuit, according to a decision in Lindemann v. Hume, which was heard in the California Court of Appeals. Lindemann was the trustee of the Schlei Trust which bought the home and then sued the seller and the builder for construction defects.
The initial owner was the Hancock Park Trust, a real estate trust for Nicholas Cage. Richard Hume was the trustee. In 2002, Cage agreed to buy the home which was being built by the Lee Group. Cage transferred the agreement to the Hancock Park Trust. Hancock had Richard Nazarin, a general contractor, conduct a pre-closing walk through. They also engaged an inspector. Before escrow closed, the Lee Group agreed to provide a ten-year warranty “to remedy and repair any and all damage resulting from water infiltration, intrusion, or flooding due to the fact that the door on the second and third floors of the residence at the Property were not originally installed at least one-half inch (1/2”) to one inch (1”) above the adjacent outside patio tile/floor on each of the second and third floors.”
Cage moved in and experienced water intrusion and flooding. The Lee Group was unable to fix the problems. Hume listed the home for sale. The Kamienowiczs went as far as escrow before backing out of the purchase over concerns about water, after the seller’s agent disclosed “a problem with the drainage system that is currently being addressed by the Lee Group.”
The house was subsequently bought by the Schlei Trust. The purchase agreement included an arbitration clause which included an agreement that “any dispute or claim in Law or equity arising between them out of this Agreement or any resulting transaction, which is not settled through mediation, shall be decided by neutral, binding arbitration.” The warranty the Lee Group had given to Hancock was transferred to the Schlei trust and Mr. Schlei moved into the home in May 2003.
Lindemann enquired as to whether the work done would prevent future flooding. Nazarin sent Schlei a letter that said that measures had been taken “to prevent that situation from recurring.” In February, 2004, there was flooding and water intrusion. Lindemann filed a lawsuit against the Lee Group and then added the Hancock Park defendants.
The Hancock Park defendants invoked the arbitration clause, arguing that Lindemann’s claims “were only tangentially related to her construction defect causes of action against the Lee Group.” On June 9, 2010, the trial court rejected this claim, ruling that there was a possibility of conflicting rulings on common issues of law. “With respect to both the developer defendants and the seller defendants, the threshold issue is whether there was a problem with the construction of the property in the first instance. If there was no problem with the construction of the property, then there was nothing to fail to disclose.” Later in the ruling, the trial court noted that “the jury could find there was no construction defect on the property, while the arbitration finds there was a construction defect, the sellers knew about it, and the sellers failed to disclose it.” The appeals court noted that while Hancock Park had disclosed the drainage problems to the Kamienowiczs, no such disclosure was made to Sclei.
The appeals court described Hancock Park’s argument that there is no risk of inconsistent rulings as “without merit.” The appeals court said that the issue “is not whether inconsistent rulings are inevitable but whether they are possible if arbitration is ordered.” Further, the court noted that “the Hancock Park defendants and the Lee Group have filed cross-complaints for indemnification against each other, further increasing the risk of inconsistent rulings.”
The court found for Lindemann, awarding her costs.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Attorney Risks Disqualification If After Receiving Presumptively Privileged Communication Fails to Notify Privilege Holder and Uses Document Pending Privilege Determination by Court
May 03, 2017 —
David W. Evans & Stephen J. Squillario - Haight Brown & Bonesteel LLPIn McDermott Will & Emery LLP v. Superior Court (4/18/2017 – No. G053623), the Fourth Appellate District, in a 2-1 decision, considered two distinct issues: 1. Whether the attorney-client privilege for a confidential e-mail communication between a client and his attorney had been waived by the client’s inadvertent disclosure of the communication to a third party; and 2. Whether the opposing counsel’s failure to respect the claimed privilege as to the inadvertently produced document or to follow the rules for handling such documents set forth in State Compensation Ins. Fund v WPS, Inc. (1999) 70 Cal.App.4th 644 (State Fund) supported the trial court’s disqualification of counsel and his law firm.
This case arose from an intra-family dispute over the deceased matriarch’s substantial investment holdings, a related probate matter, and two subsequent legal malpractice actions. The opinion sets forth in great detail the facts surrounding the claimed inadvertent disclosure by the client (i.e., the privilege holder) of the subject attorney-client e-mail communication, its subsequent dissemination to, and use by, the client’s family members, the ultimate receipt and review by an opposing family member’s counsel, the efforts by the client’s counsel to assert the privilege and “claw-back” the document, and in the face of this privilege claim, the opposing counsel’s extensive use of the document during discovery, including depositions, in the legal malpractice actions. The opposing counsel, who had received the subject document from his own client, had independently concluded that the clearly privileged document lost its privileged status, believing that the privilege had been waived either because of disclosure to third parties or that his obligation to return inadvertently disclosed documents only applied to those produced in litigation during discovery. As a result, the opposing counsel refused all demands for the return or destruction of the document and insisted upon continuing to use it. This dispute finally came to a head over two years after the client’s disclosure in the context of the client’s motion for a judicial determination that the document was privileged (which the trial court granted) and then a motion to disqualify the opposing counsel (which the trial court also granted); both decisions were eventually reviewed by the appellate court.
Reprinted courtesy of
David W. Evans, Haight Brown & Bonesteel LLP and
Stephen J. Squillario, Haight Brown & Bonesteel LLP
Mr. Evans may be contacted at devans@hbblaw.com
Mr. Squillario may be contacted at ssquillario@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Does the UCC Apply to the Contract for the Sale of Goods and Services
July 03, 2022 —
David Adelstein - Florida Construction Legal UpdatesWhat governs the transaction for the hybrid contract that includes both goods and services–the Uniform Commercial Code (UCC) or the common law? A question that is asked in numerous disputes. A good example is the recent case out of the Eleventh Circuit Court of Appeals, Wadley Crushed Stone Company, LLC v. Positive Step, Inc., 2022 WL 1639011 (11th Cir. 2022), dealing with Alabama law.
In this case, the plaintiff (buyer) wanted to build a granite plant in Alabama that would process 500 tons of granite per hour. The plaintiff reached out to a defendant company to start the process of building a granite plant. The defendant company engaged vendors and professionals in the due diligence process to determine the equipment the plaintiff would need. After this due diligence, plaintiff and defendant entered into a contract that included equipment and services. Thereafter, the parties modified the contract to reduce the amount for the erection, installation, and electrical work (about $1.5 Million) as plaintiff planned to independently hire the contractor to perform that work. The modified contract was worth $4,059,224.43 of which there were 25 lines items for equipment totaling $3,887,274.43 with the balance (less than 5% of the contract amount) for engineering (done by a third party), installation, setup, and calibration of scales.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Can a Receiver Prime and Strip Liens Against Real Property?
September 20, 2021 —
Ben Reeves - Snell & Wilmer Real Estate Litigation BlogCourts overseeing receivers generally enjoy broad discretion in directing and approving a receiver’s proposed actions. But does that authority extend to a receiver not only granting a super-priority lien ahead of existing liens, but also selling the real property free and clear of all liens? In County of Sonoma v. Quail, 56 Cal.App.5th 657 (Ct. App. 2020), the California Court of Appeals answered that question in the affirmative.
Quail involved a 47,480 square-foot lot with two houses, a few garages, several outbuildings, and numerous trailers surrounded by a veritable junk yard. Despite many of these structures being uninhabitable, unsanitary, and dangerous, multiple families resided on the lot. Although Sonoma County (the “County”) ordered the owner to remediate the property several times, he failed and refused to do so. After several years of these violations going unabated, the County ultimately sought and obtained the appointment of a receiver over the real property.
To obtain funds necessary to repair the property, the receiver asked the court for permission to borrow money through the issuance of a receivership certificate to be secured by a super-priority lien—i.e., a lien ahead of all other liens—against the real property. Although the trial court initially declined to prime existing liens, when the receiver could find no one to lend money (since the land lacked equity), the trial court relented and approved a super-priority lien despite the senior secured lender’s objection (the “lender”).
Read the court decisionRead the full story...Reprinted courtesy of
Ben Reeves, Snell & WilmerMr. Reeves may be contacted at
breeves@swlaw.com
New York Appellate Court Expands Policyholders’ Ability to Plead and Seek Consequential Damages
February 27, 2019 —
Michael S. Levine & Joshua S. Paster - Hunton Andrews KurthIn a huge win for policyholders, a New York appellate court, in D.K. Property, Inc. v National Union Fire Insurance Company of Pittsburgh, Pa., held that an insured need not provide a detailed factual description or explanation for why consequential damages are recoverable at the pleading stage. Rather, an insured’s complaint must only (i) specify the types of consequential damages claimed; and (ii) allege that those damages reasonably were contemplated by the parties prior to contracting.
Here, D.K. Property’s building was damaged as a result of construction on an adjoining building, and it timely filed a claim with National Union under a policy that covers “direct physical loss or damage to” the building. National Union neither paid the claim nor disclaimed coverage. Instead, according to D.K. Property, National Union made unreasonable and increasingly burdensome information demands over a three-year period, which it alleges was a “tactic” to make pursuing the claim so expensive that D.K. Property would abandon the claim. As a result of the delay, D.K. Property alleges the structural damage to its building has worsened.
Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth and
Joshua S. Paster, Hunton Andrews Kurth
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Paster may be contacted at jpaster@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Design-Build Contracting: Is the Shine Off the Apple?
March 09, 2020 —
John P. Ahlers - Ahlers Cressman & Sleight PLLCThe design-build delivery method offers many benefits to owners. Among the cited benefits are that projects are generally completed faster, at a lower cost, by allowing innovative approaches through early and continual contractor involvement in the design process. The design contractor serves as a single point of contact responsible for both the design and construction of the project.
The Washington State Department of Transportation (“WSDOT”) utilized the design-build procurement method on the largest project ($2 billion) of its type in the state of Washington: the Highway 99 Tunnel, which was finished almost three years late after the tunnel-boring machine (“Bertha”) broke down six years ago. The sorted tale of the SR-99 Tunnel Project was the source of many of this firm’s blog articles.[1] The State of Washington staunchly maintained that the design-build contract protected its taxpayers from covering the repair costs to the tunnel-boring machine when it broke down in 2013. Bertha did not resume tunneling for almost two years, putting on hold removal of the Alaska Way viaduct and rebuilding of the Seattle Waterfront without an elevated highway.
In December 2013, the contractor for the project, Seattle Tunnel Partners (“STP”), contended that a 110-foot long 8” steel pipe which Bertha hit caused the breakdown. That pipe had been installed for groundwater testing by WSDOT in 2002 during its preliminary engineering for the viaduct replacement project. The project’s Dispute Review Board (“DRB”) composed of three tunneling experts found that the pipe constituted a “differing site condition” for which the State was responsible to disclose to contractors. The Board, whose views were non-binding, did not opine about how much damage the undisclosed pipe cost.[2] In other words, the mere fact that a differing site condition occurred did not establish that there was a causal connection between the damages which STP was seeking (in excess of $600 million) and the differing site condition (the 8” steel pipe which WSDOT lawyers at trial derisively referred to as “nothing more than a toothpick for Bertha’s massive cutter head”). STP maintained that Bertha had made steady progress except for three days immediately after hitting the pipe. It didn’t help the contractors’ case that during the discovery phase of the two-month trial, WSDOT lawyers uncovered documents showing that the contractor’s tunnel workers encountered and logged the pipe before digging began.[3]
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers Cressman & Sleight PLLCMr. Ahlers may be contacted at
john.ahlers@acslawyers.com
Court Adopts Magistrate's Recommendation to Deny Insurer's Summary Judgment Motion in Collapse Case
June 06, 2018 —
Tred R. Eyerly - Insurance Law HawaiiThe district court accepted the magistrate's recommended ruling denying the insurer's motion for summary judgment on breach of contract and bad faith claims in a case involving collapse. Jang v. Liberty Mut. Fire Ins. Co., 2018 U.S. Dist. LEXIS 51880 (D. Conn. March 27, 2018).
After purchase of their home, the insureds' inspector found large cracks in the foundation. Liberty denied coverage, contending that the basement wall was collapsing due to settling earth or movement. The insureds' expert later found the foundation had cracks from the oxidation of iron sulfide minerals in the foundation's concrete. The insureds sued for breach of contract, bad faith, and violations of the Connecticut Unfair Insurance Practice Act and the Unfair Trade Practices Act.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
The Value of Photographic Evidence in Construction Litigation
April 26, 2021 —
Marie Mueller - Construction ExecutiveIf a picture is worth a thousand words, can it be worth a thousand dollars? Ten thousand? Maybe, if it provides key evidence in a construction dispute. Litigating a construction case involves each side telling their story. Details and visual context make a story compelling. Evidence and corroboration make a story persuasive. Photographs can help on both of these fronts.
The Value of Photographic Evidence in Construction Litigation
Consider the following examples:
- A dispute relates to the timeliness of particular work. An employee has a memory of a load of materials arriving to the site later than it should have, but the records are incomplete or ambiguous about when it actually occurred. If the employee also took a photo of the materials, on the day they arrived, they could match up the date of the photo to their memory and build a clear timeline.
- A dispute relates to the presence or absence of obstructions in drilled shafts. There are no available photographs or videos of the work due to site restrictions. Presentation of this type of case may be severely limited by not being able to show photos depicting the size, shape and type of material removed from the shafts, and by the lack of video depicting the work.
Reprinted courtesy of
Marie Mueller, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of