Tacoma Construction Site Uncovers Gravestones
August 11, 2011 —
CDJ STAFFThe Seattle Times reports that a transit construction project has uncovered about twenty-five gravestones. The area was historically sensitive, as it is in territory once occupied by the Puyallup Tribe. At current report, no human remains have been found and the article cites the project?s archeological consultant as describing the gravestones as “not historically significant.”
Read the full story…
Read the court decisionRead the full story...Reprinted courtesy of
California Senator Proposes Bill to Require Contractors to Report Construction Defect Cases
January 04, 2018 —
David Suggs - Bert L. Howe & Associates, Inc.According to Renne Schiavone’s of Patch.com in her article “Sen. Hill Wants Contractors to Report Construction Defect Cases”, Senator Jerry Hill of San Mateo County proposed a bill on December 21st, 2017 requiring construction defect settlements to be reported by contractors to the licensing board. This proposal comes after the tragic incident that took place back on June 16, 2015 during which a balcony on the fifth floor of a Berkeley apartment complex collapsed. This resulted in the death of six students and serious injuries for an additional seven individuals.
An investigation revealed that three years prior to the balcony collapse, Segue Construction, who built the apartment complex, had paid $26.5 million in construction defect lawsuit settlements. Since the law doesn’t require these settlements to be reported by contractors, the Contractors State License Board (CSLB) wasn’t aware of the case.
"Working together we can take even stronger steps to protect the public by ensuring that this critically important data is accessible to the Contractors State License Board," said Senator Hill. Senate Bill 465 will aim to protect consumers with more regulation and transparency. Senator Hill is also working on Senate Bill 721 which would require periodic condo and apartment building inspections of exterior elevated walking surfaces, stairwells, and balconies.
Read the court decisionRead the full story...Reprinted courtesy of
Montrose III: Appeals Court Rejects “Elective Vertical Stacking,” but Declines to Find “Universal Horizontal Exhaustion” Absent Proof of Policy Wordings
September 14, 2017 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn Montrose Chemical Corp. v. Superior Court (No. B272387; filed 8/31/17) (Montrose III), a California appeals court found that excess insurance is not triggered for continuous and progressive losses until there has been horizontal exhaustion of underlying insurance, but there is no “universal horizontal exhaustion” because the order or sequence in which excess policies may be accessed depends on the specific policy wording at issue.
The coverage lawsuit was initiated by Montrose in 1990, when it was named in environmental actions for continuous and progressive property damage emanating from its Torrance chemical plant since the 1960s. Montrose had varying levels of insurance coverage throughout, but the total limits and attachment points of differing levels of excess coverage in any given year had changed from year-to-year. The coverage action was stayed in 2006 due to concern of prejudice to the underlying defense, but the stay was lifted in 2014 with Montrose entering a consent decree in the CERCLA action.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Before Celebrating the Market Rebound, Builders Need to Read the Fine Print: New Changes in Construction Law Coming Out of the Recession
November 26, 2014 —
Alan H. Packer - Newmeyer & Dillion, LLPAs the homebuilding market continues to improve, many builders find themselves maneuvering familiar roads. That said, important new realities have taken hold since the market collapse. Navigating these changes requires extra thought for practical and legal reasons.
Using Old Designs “Off the Shelf”?
The adoption of the California Building Standards Code in 2010, with an updated schedule to go into effect January 1, may complicate the use of older designs. In addition, some builders are contemplating building on pads constructed five or more years ago, temporarily shelved until market conditions improved. Because of changes in both the applicable Code and due to possible changes in the underlying soils and drainage, these projects require additional scrutiny before starting construction.
Mechanic’s Lien Law Changes
Not too long ago, the California Legislature recently overhauled the entire mechanic’s lien law system in California. New forms, new statutory references, new rules and deadlines are all applicable to projects under construction now. Make sure your documents are up to date, as the use of older forms (particularly for liens, progress payments, and final payments) could create legal problems in the future.
Indemnity Law Changes
Since 2006, California lawmakers have passed four rounds of legislation aimed at limiting indemnity provisions in construction contracts. The laws are aimed at two aspects of indemnity law: “Type 1” indemnity provisions, and liability for the costs of defending a claim.
Type 1 Indemnity. California law previously permitted a builder to obtain “Type 1” indemnity from its subcontractors for all claims. Under a Type 1 provision, if a claim arose out of the trade’s work, the trade was fully responsible to defend and indemnify the builder – even if other trades or the Builder were partially at fault. Some cases even allowed, typically in a commercial context, the builder to obtain Type 1 indemnity even if the trade was not negligent, as long as the claim involved its work.
Defense Obligation. In 2008, California’s highest court issued an opinion in Crawford v. Weather Shield, evaluating an indemnity provision requiring trade (a window supplier/manufacturer) to defend the builder in claims involving allegations of damages arising out of the trade’s work. Because the trade had contractually agreed to defend the builder, the Court held it responsible for the builder’s defense costs -- even though, ultimately, the trade was found
not liable for the actual damages claimed.
Recent legislation after Crawford has dramatically shifted how indemnity provisions will be enforced. Builders may no longer obtain Type 1 indemnity for residential construction defect claims covered by SB800; instead, indemnity is limited to the extent a claim arises out of the trade’s work. Even more recent legislation applied these changes to claims arising out of commercial construction projects. The recent legislation allows the trades “options” on how to defend the builder, with an eye toward requiring that they pay only a “reasonably allocated” portion for the builder’s defense costs.
Smart builders are refining their contract documents to take into account these new limitations on indemnity provisions.
Insurance Market Changes
Due to uncertainties in subcontractor insurance and other factors, many builders have also converted their liability insurance from a “bring your own” model to “wrap-up” insurance, where the builder’s policy also covers their trades. Builders should carefully examine their subcontracts in light of this change as well.
Trade Partner Changes
On a practical level, many trade partners, particularly in the residential sector, have gone out of business or moved on to greener pastures. Builders need to find and negotiate contracts with new trade partners on the fly, and educate them on the builders’ procedures for payment and construction.
SB800 documentation
A decade ago, most builders updated their purchase documents and subcontracts for California’s “Right to Repair Law” (also known as SB800), which set forth functionality standards for construction defects in residential housing, and procedures for resolving claims prior to litigation. Builders ramping up to meet market demand should examine how they implemented SB800 changes in contract documents. Issues to consider:
- Whether to opt out of -- or back into -- statutory procedures.
- Whether to include arbitration or judicial reference provisions to control where claims are litigated after the SB800 process.
- Re-training personnel to preserve SB800 rights, including sign-offs on purchase documentation and recordation of key documents.
- Recent Court of Appeal decisions have complicated the SB800 landscape, potentially opening the door to “common law” tort claims in at least subrogation contexts. Strategic planning at the document stage may be a good way to mitigate this risk as the cases wind their way through the judicial process.
The continuing surge in building activity is a welcome sign for builders who have weathered the storm. Before taking too many steps, builders should consult with counsel, their designers, and their insurance advisors to take into account the new realities of this recovering housing market.
About the Author
Alan H. Packer is a partner in the expanding Walnut Creek, CA, office of the law firm of
Newmeyer & Dillion LLP whose specialties include real estate, insurance, and construction litigation. To reach Alan, call 925.988.3200 or email him at alan.packer@ndlf.com.
Read the court decisionRead the full story...Reprinted courtesy of
Breaking with Tradition, The Current NLRB is on a Rulemaking Tear: Election Procedures, Recognition Bar, and 9(a) Collective Bargaining Relationships
September 09, 2019 —
Keahn Morris, John Bolesta & James Hays - Construction and Infrastructure Law BlogIn its 84-year history, the National Labor Relations Board (NLRB, Board or Agency) has promulgated a very small number of rules pursuant to the Administrative Procedures Act, relying, instead, on individualized adjudications to establish the Board’s legislative policies. However, breaking with that long tradition, the current Board now appears to be on the verge of a formal rulemaking jag for on May 22, the Board released its “Unified Agenda” of anticipated regulatory actions which, in addition to proceeding with rulemaking regarding joint employer standards, announced the Board’s intention to consider formal rulemaking in a number of critical areas. Consistent with that wide-ranging Agenda, on August 12, the Board published a Notice of Proposed Rulemaking (NPRM) over the objection of Democratic appointee, Lauren McFerran, that would amend the Agency’s rules and regulations governing the filing and processing of election petitions in three very important ways. This NPRM, therefore, deserves attention.
The first possible amendment will modify the Board’s administrative election blocking charge practice by establishing a regulation-based vote and impound procedure to be used when a party, typically a union facing possible decertification, files an unfair labor practice (ULP) charge and, based thereon, seeks to block the holding of an election.
The second possible amendment will modify the Board’s current recognition bar case law by codifying prior Board case doctrine and creating a regulation-based requirement of notice of voluntary recognition to affected employees and a 45-day open period within which affected employees may call for an election before that voluntary recognition will be allowed to operate as a bar to employees raising later questions concerning the union’s representative status (QCR).
Reprinted courtesy of Sheppard Mullin attorneys
Keahn Morris,
John Bolesta and
James Hays
Mr. Morris may be contacted at kmorris@sheppardmullin.com
Mr. Bolesta may be contacted at jbolesta@sheppardmullin.com
Mr. Hays may be contacted at jhays@sheppardmullin.com
Read the court decisionRead the full story...Reprinted courtesy of
Berger: FIGG Is Slow To Hand Over All Bridge Collapse Data
November 12, 2019 —
Richard Korman - Engineering News-RecordThe Florida International University Tragedy
About half an hour before the almost-completed pedestrian bridge collapsed onto a busy Miami-area road last year, killing six people, Denney Pate, the bridge’s engineer-of-record, sent a text to Linda Figg, the chief executive of FIGG Bridge Engineers.
Richard Korman, Engineering News-Record
Mr. Korman may be contacted at kormanr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Bay Area Firm Offers Construction Consulting to Remodels
October 02, 2013 —
CDJ STAFFHomeowners sometimes aren’t too clear on questions of “building codes, permit process or where to find the right materials,” according to Benoni Mocanu, the owner of MB Development. He’s ready to step in an help by offering construction consulting to homeowners doing their own remodeling projects. In addition to providing the advice to help them through their projects, they’re ready to step in if a homeowner finds that they can’t finish the project.
Read the court decisionRead the full story...Reprinted courtesy of
A Community Constantly on the Brink of Disaster
February 06, 2023 —
Jason Daniel Feld - Kahana FeldIn the beautiful coastline region along the famous Pacific Coast Highway between Ventura and Santa Barbara rests the small cottage town of La Conchita. With unobstructed ocean views, this community is only 820 feet wide on a narrow strip of land abutting a 590 feet high cliffside bluff. The bluff has a slope of approximately 35 degrees and consists of poorly cemented marine sediments. This is the perfect recipe for constant disaster from a geological perspective and the site of several major landslides that have devastated this community. Geologic evidence indicates that landslides, which are part of the larger Rincon Mountain slides, have been occurring at and near La Conchita for many thousands of years up to the present with reported landslides beginning as early as 1865. In both 1889 and 1909, the
Southern Pacific Rail Line
running along the coast was inundated. In the 1909 slide, a train was buried. Since that time, other slides have occurred, covering at times cultivated land, roadways, and the community itself. The two most devastating landslides occurred in 1995 and 2005.
1995 Landslide
From October 1994-March 1995, there was double the amount of seasonal rainfall for the area – in excess of 30 inches. The slide occurred on March 3, 1995, when surface cracks in the upper part of the slope opened on the hillside, and
surface runoff was infiltrating into the subsurface. The heavy rains essentially saturated the slope causing a massive slide. On March 4, 1995, the hill behind La Conchita failed, moving tens of meters in minutes, and buried nine homes with no loss of life. The
County of Ventura immediately declared the whole community a
Geological Hazard Area, imposing building restrictions on the community to restrict new construction. On March 10, 1995, a subsequent debris flow from a canyon to the northwest damaged five additional houses in the northwestern part of La Conchita. In total, the slide measured approximately 390 feet wide, 1080 feet long and 98 feet deep. The deposit covered approximately 9.9 acres, and the volume was estimated to be approximately 1.7 million cubic yards of sediment. The devastation was immeasurable and the damage to homes, property and infrastructure was in the millions of dollars to repair. Litigation quickly arose following the 1995 slide with seventy-one homeowners suing the La Conchita Ranch Co. in Bateman v. La Conchita Ranch Co. The judge ruled that irrigation was not the major cause of the slide and that the ranch owners were not responsible.
Read the court decisionRead the full story...Reprinted courtesy of
Jason Daniel Feld, Kahana FeldMr. Feld may be contacted at
jfeld@kahanafeld.com