October 02, 2015 —
Yas Omidi – California Construction Law BlogIt’s football season again. Which means, of course, that in addition to touch downs and field goals, you’ll also see hooting and hollering when the ref throws down a yellow flag signaling that a foul has been committed.
In Judicial Council of California v. Jacob Facilities, Inc., Case Nos. A140890, A141393 (August 20, 2015), The California Court of Appeals for the First District threw down its own yellow flag under the dreaded Business and Professions Code section 7031, finding that a contractor was required to disgorge all monies received on a project – to the tune of a whopping $18 million – when its parent company allowed the subsidiary’s contractor’s license to lapse when it rebranded a new company to perform the work of the old company but never formally assigned the contract. I think someone in marketing may be in big trouble.
Read the court decisionRead the full story...Reprinted courtesy of
Yasmeen, Omidi, Wendel Rosen Black & Dean LLPMs. Omidi may be contacted at
yomidi@wendel.com
Predicting the Future of Texas’s Grid Is a Texas-Sized Challenge
June 27, 2022 —
Nathaniel Bullard - BloombergA little more than a year after a paralyzing winter freeze, the Texas power market just experienced the stress of extreme heat. Last week, power prices in Houston briefly jumped above $5,000 per megawatt-hour as high temperatures coincided with a number of generators being offline for maintenance.
Yet a few days earlier, power prices in west Texas had been negative $883 dollars per megawatt-hour, because at the time wind generation was abundant and demand was low.
“Dynamic” is one way to describe the price swings within the Electric Reliability Council of Texas (Ercot), the grid that provides the majority of the state’s power. “Jarring” or “terrifying” might be other words for it, particularly for those buying power in the spot market.
Read the court decisionRead the full story...Reprinted courtesy of
Nathaniel Bullard, Bloomberg
Delay In Noticing Insurer of Loss is Not Prejudicial
April 28, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe Tenth Circuit reversed a district court's determination that untimely notice of the loss was prejudicial, eliminating the insurer's coverage obligations. B.S.C. Holding, Inc. v. Lexington Ins. Co., 2014 U.S. App. LEXIS 4492 (10th Cir. March 11, 2014).
In January 2008, the insured's employees detected an inflow of water in a salt mine and feared dissolution of the salt or structural problems. The insured tried to devise a solution. Two and a half million dollars were spent to find the cause of the water inflow and to identify a solution. In April 2010, the insured determined the inflow was caused by an improperly sealed oil well. In July 2010, the insured notified Lexington of the water inflow. The ultimate proof of loss was for $7.5 million, which included remediation measures that the insured had performed before notifying Lexington.
Lexington's all-risk policy required the insured to notify the company in writing as soon as practicable.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Residential Contractors, Be Sure to Have these Clauses in Your Contracts
May 16, 2018 —
Christopher G. Hill - Construction Law MusingsI have often “mused” on the need to have a good solid construction contract at the beginning of a project. While this is always true, it is particularly true in residential contracting where a homeowner may or may not know the construction process or have experience with large scale construction. Often you, as a construction general contractor, are providing the first large scale construction that the homeowner has experienced. For this reason, through meetings and the construction contract, setting expectations early and often is key.
As a side note to this need to set expectations, the Virginia Department of Professional and Occupational Regulation (DPOR) and the Virginia General Assembly require certain clauses to be in every residential construction contract. DPOR strictly enforces these contractual items and failure to put them in your contracts can lead to fines, penalties and possibly even revocation of a contractor’s license.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Partner Jason Taylor and Senior Associate Danielle Kegley Successful in Appeal of Summary Disposition on Priority of Coverage Dispute in the Michigan Court of Appeals
December 11, 2023 —
Jason Taylor & Danielle K. Kegley - Traub LiebermanIn this appeal brought before the Michigan Court of Appeals, the appellate court ruled in favor of Traub Lieberman’s insurance carrier client (the “Carrier” or “Client”), affirming an award of summary disposition in favor of the Carrier in a coverage lawsuit. The coverage lawsuit involved a priority dispute between the Carrier and another insurer over which company’s policy had responsibility to cover the defense of their mutual insured, a heating and cooling contractor (the “Insured”) in an underlying lawsuit alleging carbon monoxide poisoning. The Carrier issued a contractor’s pollution liability policy and the other insurer issued a commercial general liability policy to the Insurer. Both the Carrier and the other insurer filed cross-motions for summary disposition in the trial court on the priority of coverage issue. The trial court granted the Client’s motion, holding that the CGL carrier was the primary insurer based on the language in the policies’ “other insurance” clauses. The trial court rejected the CGL carrier’s argument to apply the “total policy insuring intent” or “closest to the risk” tests—tests which Michigan courts have not adopted. Specifically, the court rejected the CGL carrier’s argument that the Client’s contractor’s pollution liability policy was more specifically tailored to the loss in the underlying lawsuit. The trial court also rejected CGL carrier’s alternative argument that the “other insurance” clauses in the policies were irreconcilable, requiring a pro rata allocation based on the respective limits of the policies.
Reprinted courtesy of
Jason Taylor, Traub Lieberman and
Danielle K. Kegley, Traub Lieberman
Mr. Taylor may be contacted at jtaylor@tlsslaw.com
Ms. Kegley may be contacted at dkegley@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Water Damage Sub-Limit Includes Tear-Out Costs
June 06, 2022 —
Tred R. Eyerly - Insurance Law HawaiiThe Florida Court of Appeals affirmed the trial court's ruling that the homeowner policy's sub-limit for water damage included tear-out costs. Sec. First Ins. Co. v. Vazquez, 2022 Fla. App. LEXIS 1205 (Fla. Ct. App. Feb. 18, 2022).
A discharge of water from the cast iron pipes caused damage to the home. The water escaped as a result of the failed cast iron pipes due to wear and tear, deterioration, and corrosion. The insurer acknowledged coverage for the water damage and paid $10,000 under the Limited Water Damage Endorsement (LWD Endorsement). The provision recited that "'[t]he limit of liability for all damage to covered property provided by this endorsement is $10,000 per loss." The insureds' suit argued they were entitled to additional benefits for the cost to tear out and replace a part of the concrete slab - an action necessary to reach the corroded pipes. The parties stipulated that the cost of the tear-out would be $40,000.
The parties agreed that the LWD Endorsement provided coverage of both water damage and tear-out costs. They also agreed that the cost to repair and/or replace the corroded pipes was not covered. They disagreed, however, over the proper interpretation of the limitation of liability provision in the LWD Endorsement. The insured argued that the $10,000 limit applied to both water damage and tear-out costs. The insureds argued that the $10,00 limit applied only to water damage to covered property.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
General Contractors Must Plan to Limit Liability for Subcontractor Injury
May 18, 2011 —
Douglas Reiser in the Builders Counsel BlogIt takes more than a hard hat, but safety checks, a good policy and a smart contract might save you some problems.If you are a general contractor, you will want to pay close attention to this article. A new Washington appellate decision showcases a general contractor’s liability to subcontractors who are injured on the job, when security barriers fail. But can a general limit this liability? Will its contract help?
In Wrought Corporation, Inc., Appellant V. Mario Interiano (quick note: this opinion is unpublished, but we are here to talk about an issue that was not determined on appeal – WISHA compliance), a subcontractor was injured when a security barrier failed and he fell into an elevator shaft.
A jury awarded a $1.56 million verdict against the general contractor, and the court of appeals affirmed on the basis that the general contractor has a non-delegable duty to ensure compliance with the Washington Industrial Safety and Health Act of 1973, codified under RCW 49.17 (WISHA).
Read the full story… Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com
Read the court decisionRead the full story...Reprinted courtesy of
Tennessee Court: Window Openings Too Small, Judgment Too Large
November 18, 2011 —
CDJ STAFFThe Tennessee Court of Appeals has issued a ruling in the case of Dayton v. Ackerman, upholding the decision of the lower court, even as they found that the award was incorrectly computed. The Daytons purchased a house that had been designed and built by the Ackermans, who operated a construction business. The court noted that the warranty with the house promised that “for a period of 60 days, the following items will be free of defects in materials or workmanship: doors (including hardware); windows; electric switches; receptacles; and fixtures; caulking around exterior openings; pluming fixtures; and cabinet work.”
Soon, the Daytons began to experience problems with the house. Many were addressed by the Ackermans, but the Daytons continued to have problems with the windows. Neither side could specify a firm date when the Ackermans were contacted by the Daytons about the window problems. The Ackermans maintained that more than two years passed before the Daytons complained about the windows. The lower court found the Daytons more credible in this.
Initially, the Daytons included the window manufacturer in their suit, but after preliminary investigations, the Daytons dropped Martin Doors from their suit. Martin Doors concluded that the windows were improperly installed, many of them “jammed into openings that were too small for them.”
After the Daytons dismissed Martin Doors, the Ackermans sought to file a third party complaint against them. This was denied by the court, as too much time had elapsed. The Ackermans also noted that not all of the window installations were defective, however, the courts found that the Daytons ought not to have mismatched windows.
Unfortunately for the Daytons, the window repair was done incorrectly and the windows were now too small for the openings. The firm that did the repair discounted the windows and Daytons concealed the problem with plantation shutters, totalling $400 less than the original lowest estimate. However, the appeals court noted that it was here that the trial court made their computation error. Correcting this, the appeals court assessed the Ackermans $12,016.20 instead of $13,016.20.
Finally, the Ackerman’s expert was excluded as he had changed his testimony between deposition and trial. The trial reviewed the expert’s testimony and had it been admissible, it would not have changed the ruling.
Read the court’s decision…