The Air in There: Offices, and Issues, That Seem to Make Us Stupid
October 28, 2015 —
Eric Roston – BloombergIt's tempting to conclude from the climate change debate that all that carbon dioxide in the air is making everybody dumber.
In fact, all that carbon dioxide in the air is making everybody dumber.
Workers showed diminished cognitive functioning after spending several hours in office air that had normal levels of CO2 and chemical pollutants and ordinary ventilation, in a study published this week in Environmental Health Perspectives. Researchers tinkered with the levels of carbon dioxide and volatile organic compounds (airborne chemicals) and the amount of outside air pumped in, while the subjects did their regular work, though at a Syracuse University lab. The levels were chosen to simulate the indoor environment of conventional offices, LEED Platinum "green" buildings, and green buildings with an elevated outdoor ventilation rate ("Green+"). The 24 participants, including architects, engineers, and marketing professionals, were exposed to different conditions on different days during the six-day study, not knowing of the changes.
At 3 pm every day, the researchers administered computer-based cognitive tests of strategy-setting and focus, for example, and recorded the results and the kind of air the participants had been breathing. A day spent in the air of an extra-ventilated green building correlated with the best performance on the tests. Participants performed 61 percent better in green-building air than in conventional air, and 101 percent higher in the Green+ scenario. The research was supported in part by a United Technologies gift to Harvard's T.H. Chan School of Public Health. United Technologies, which makes building systems, wasn't involved in the experiment itself.
Read the court decisionRead the full story...Reprinted courtesy of
Eric Roston, Bloomberg
Restaurant Wants SCOTUS to Dust Off Eleventh Circuit’s “Physical Loss” Ruling
February 01, 2021 —
Michael S. Levine & Geoffrey B. Fehling - Hunton Insurance Recovery BlogA South Florida restaurant has asked the US Supreme Court to overturn a federal district court’s ruling that the restaurant is not entitled to coverage under an “all risk” commercial property insurance policy for lost income and extra expenses resulting from nearby road construction. In the underlying coverage action, the policyholder, Mama Jo’s (operating as Berries in the Grove), sought coverage under its all-risk policy for business income losses and expenses caused by construction dust and debris that migrated into the restaurant. Should the Supreme Court grant certiorari, the case will be closely watched by insurers and policyholders alike as an indicator of the scope of coverage available under all-risk policies and whether the principles pertinent to construction dust and debris (at issue in Mama Jo’s claim) have any application to the thousands of pending claims for COVID-19-related business interruption losses pending in the state and federal court systems.
As previously discussed on this blog, the Eleventh Circuit’s decision deviates from Florida precedent on the issue of “direct physical loss” and even its own understanding of that term as described in the August 18, 2020 decision now at issue before the Supreme Court. Mama Jo’s points to this in its petition along with several other errors arguing, for example, that the appellate court’s ruling renders entire areas of coverage nonexistent by requiring “tangible destruction” of property under all-risk policies that expressly afford coverage for types of clean-up costs required to remove debris from covered property.
Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth and
Geoffrey B. Fehling, Hunton Andrews Kurth
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Fehling may be contacted at gfehling@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Contractors: A Lesson on Being Friendly
April 06, 2016 —
Garret Murai – California Construction Law BlogI know.
You’re just trying to be friendly.
Don’t.
Particularly when you’re a contractor bidding on a public works project.
Those dinners at swanky restaurants, tickets to The Jersey Boys, and all expense paid trips to the Napa Valley have a way of appearing less “friendly” in hindsight, and more like bribery, or as they say, “pay to play.”
In Sweetwater Union High School District v. Gilbane Building Company, California Court of Appeals for the Fourth District, Case No. D067383 (February 24, 2016), three contractors, Gilbane Building Company (“Gilbane”), The Seville Group, Inc. (“Seville”) and Gilbane/SGI Joint Venture (“Gilbane/SGI”) (collectively “Contractors”) were sued by the Sweetwater Union School District (“District”) to void their contracts with the District and for disgorgement of all monies paid to them under Government Code section 1090 after it was discovered that the Contractors had engaged in a “pay to play” scheme involving several officials of the District.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Presenting a “Total Time” Delay Claim Is Not Sufficient
September 12, 2022 —
David Adelstein - Florida Construction Legal UpdatesWhen presenting a delay-type of claim on a construction project, a claimant MUST be in a position to properly PROVE the claim. Trying to present a delay claim loosey-goosey is not a recipe for success. In fact, it can be a recipe for an easy loss. This is not what you want. To combat this, make sure you engage a delay expert that understands delay methodologies and how to calculate delay and do NOT present a total time claim. Presenting a delay claim using a total time approach, discussed below, makes it too easy to attack the flaws and credibility of the approach. Per the discussion of the case below, a total time claim with a contractor that used its project manager, versus a delay expert, to support its claim turned the contractor’s claim into a loss.
In French Construction, LLC v. Department of Veteran Affairs, 2022 WL 3134507, CBCA 6490 (CBCA 2022), a contractor submitted a delay claim to the government for almost $400,000. The contractor was hired to construct a two-story corridor to connect hospital buildings. The contractor was required to be complete within 365 days. It was not. The contractor was seeking 419 days of delay from the government. The contractor’s “delay expert” was its project manager who compared the contractor’s as-planned schedule to an as-built schedule he prepared for the claim.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Coverage Denied for Ensuing Loss After Foundation Damage
February 07, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe insureds attempt to secure coverage for ensuing losses after foundation damage was properly denied by the insurer. Walker v. Nationwide Prop. & Cas. Ins. Co., 2014 U.S. Dist. LEXIS 6683 (W.D. Tex. Jan. 6, 2014).
Two provisions excluding coverage under Nationwide's homeowner's policy were key to the court's decision. Exclusion 3 (e) barred coverage for "continuous or repeated seepage or leakage of water or stem over a period of time . . . ." Exclusion 3 (f) (6) precluded coverage for settling, cracking, shrinking, bulging or expansion of pavements, patios, foundations, walls, floors, roof or ceiling.
The policy also included a Dwelling Foundation Endorsement which covered settling, cracking, bulging of floor slabs or footings that supported the dwelling caused by seepage or leakage of water or steam. This endorsement stated the limit of liability would not exceed an amount equal to 15% of the limit of coverage for the dwelling.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Architect Searches for Lost Identity in a City Ravaged by War
March 14, 2022 —
Donna Abu-Nasr & Mohamed Sheikh Nor - BloombergOmar Degan got used to being ridiculed when he sat down with developers. The architect wanted buildings to incorporate green spaces, use less glass but have bigger windows to allow in more air. They wanted to maximize profit.
Such a clash of visions between designer and constructor could, of course, happen anywhere. But the gulf between them was particularly wide in a place where people have been more focused on survival than sustainability.
Degan, 31, wants to transform the Somali capital of Mogadishu, a lofty ambition in a city that’s been defined by violence, piracy and terrorism over the past three decades. His persistence, though, has led to prominence by championing cultural heritage and buildings that are in tune with the environment during the frenzy of reconstruction in recent years.
Reprinted courtesy of
Donna Abu-Nasr, Bloomberg and
Mohamed Sheikh Nor, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
The EEOC Targets Construction Industry For Heightened Enforcement
May 15, 2023 —
Meghan Douris & Andrew Scroggins - The Construction SeytSeyfarth Synopsis: On January 10, 2023, the Equal Employment Opportunity Commission (EEOC) released for public comment its
draft 2023-2027 Strategic Enforcement Plan (“SEP”)—a document that will guide the Commission’s enforcement priorities for the next five years. The EEOC’s prior Strategic Plan described how it would pursue its enforcement goals. (See our earlier blog on the Strategic Plan
here). The Strategic Enforcement Plan, on the other hand, describes what the EEOC’s enforcement priorities will be. Earlier actions by the EEOC suggested that it might be turning its attention to the construction industry. In the SEP, the EEOC makes its intentions explicit, putting the construction industry—and especially those receiving federal funding—squarely in its sights.
History of the SEP
The EEOC’s
first SEP covered Fiscal Years 2013-2016 (the EEOC’s fiscal years begin on October 1) and identified six broad subject-matter priorities. The EEOC’s
second SEP set the course for enforcement priorities for FY2017-2022. The
latest proposed SEP, published in the Federal Register for comment for the first time, provides notable additional details that put the employer community on notice of the Commission’s intentions for FY2023-2027.[
1]
Reprinted courtesy of
Meghan Douris, Seyfarth and
Andrew Scroggins, Seyfarth
Ms. Douris may be contacted at mdouris@seyfarth.com
Mr. Scroggins may be contacted ascroggins@seyfarth.com
Read the court decisionRead the full story...Reprinted courtesy of
Economic Loss Rule Bars Claims Against Manufacturer
November 02, 2020 —
David Adelstein - Florida Construction Legal UpdatesThe economic loss rule lives to bar a claim against a product manufacturer in a real estate transaction. In a products liability action, there needs to be personal injury or property damage, other than to the property itself, in order to recover economic damages. Otherwise, the economic loss rule will bar the recovery of such economic losses when the economic losses deal to the product itself. This is important to keep in mind in any product liability action against a manufacturer.
In a recent case, 2711 Hollywood Beach Condominium Assoc’n, Inc., v. TRG Holiday, Ltd., 45 Fla. L. Weekly D2179a (Fla. 3d DCA 2020), a condominium association purchased the condominium from the developer. Subsequently, it noticed leaks with the fire suppression system in the condominium and sued multiple parties for damages for repairs due to the leaks and the replacement of the fire suppression system. One of the parties sued in negligence and strict liability was a manufacturer of pipe fittings used in the fire suppression system. The manufacturer moved for summary judgment based on the economic loss rule and relying on the 1993 Florida Supreme Court opinion in Casa Clara Condominium Assoc’n v. Charley Toppino & Sons, Inc., 620 So.2d 1244 (Fla. 1993), holding “the economic loss rule limited a defendant’s tort liability for allegedly defective products to injuries caused to persons or damage caused to property other than the defective product itself.” 2711 Hollywood Beach Conominium Assoc’n, supra. The trial court agreed with the manufacturer and granted summary judgment. On appeal, the Third District affirmed based on the economic loss rule:
The Association bargained for, purchased and received a building; [the manufactuer’s] fittings were only a component of the FSS [fire suppression system], incorporated into the building. Applying the rule set forth in Casa Clara, the Association purchased a completed building from the developer. [The manufactuer’s] fittings were “an integral part of the finished product and, thus, did not injure ‘other’ property.” Injury to the building itself is not injury to “other” property because the product purchased by the Association was the building. See Casa Clara, 620 So. 2d at 1247. The economic loss rule therefore bars the Association’s recovery as to [the manufacturer] to the extent that it sought damages to replace the FSS [fire suppression system] and repair damage to the building.
2711 Hollywood Beach Conominium Assoc’n, supra (internal citations omitted).
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at