Billionaire Behind Victoria’s Secret Built His Version of the American Heartland
June 25, 2019 —
Sophie Alexander - BloombergBeyond emerald-green golf links, over snow-white fences, and past tree-lined cul-de-sacs rises the American fantasyland of billionaire Les Wexner.
Here in the middle of Ohio, of all places, Wexner—the man behind Victoria’s Secret and its push-up-bra notions of female beauty—has brought to life his singular vision of the heartland.
Read the court decisionRead the full story...Reprinted courtesy of
Sophie Alexander, Bloomberg
Building Codes Evolve With High Wind Events
November 14, 2018 —
William L. Coulbourne - Construction ExecutiveDesigns for wind loads have been in building codes for a long time. Prior to the creation of the International Building Code, the three primary legacy codes had wind load provisions but they mostly dealt with wind loads on the building frame and had little load information about the building components or the exterior cladding.
Since Hurricane Andrew in 1992, building codes include more wind design information that comes from disaster investigations and wind engineering research conducted primarily at the university level. In 2000, the legacy building codes were replaced with the International Building Code (IBC). Residential buildings must comply with the International Residential Code (IRC). Both of these building code documents reference the engineering load standard, ASCE 7 Minimum Design Loads and Other Criteria for Buildings and Other Structures. This load standard has also been in existence for a long time; it now is revised every six years and the building codes revised every three years (IBC and IRC) reference ASCE 7 so the provisions in ASCE 7 become part of the building code requirements.
Reprinted courtesy of
William L. Coulbourne, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Courthouse Reporter Series: Two Recent Cases Address Copyright Protection for Architectural Works
January 16, 2024 —
Stu Richeson - The Dispute ResolverRecent decisions by the Seventh Circuit and the Eight Circuit have addressed the scope of protection afforded to architectural works under copyright law. The Seventh Circuit case of Design Basics, LLC v. Signature Constr., Inc., 994 F.3d 879 (7th Cir. 2021), took a somewhat narrow view of the copyright protection afforded to the design of an “affordable, multipurpose, suburban, single-family home.” In Designworks Homes, Inc. v. Columbia House of Brokers Realty, Inc., 9 F.4th 803 (8th Cir. 2021), cert. denied, 142 S. Ct. 2888, 213 L. Ed. 2d 1103 (2022) the Eight Circuit held that the publication of floor plans of a house in a real estate listing was not protected from claims of copyright infringement.
Design Basics, LLC v. Signature Constr., Inc., involved a plaintiff that the court described as holding registered copyrights in thousands of floor plans for suburban, single-family homes that are basic schematic designs, largely conceptual in nature, and depict layouts for one- and two-story single-family homes that include the typical rooms: a kitchen, a dining area, a great room, a few bedrooms, bathrooms, a laundry area, a garage, stairs, assorted closets, etc. The court described the plaintiff as a “copyright troll” and noted that litigation proceeds had become the principal revenue stream for the plaintiff. The plaintiff sued a contractor and related businesses contending hat the defendants had infringed plaintiff’s copyrighted floor plans.
Read the court decisionRead the full story...Reprinted courtesy of
Stu Richeson, PhelpsMr. Richeson may be contacted at
stuart.richeson@phelps.com
What Should Business Owners Do If a Customer Won’t Pay
January 02, 2024 —
Scott L. Baker - Los Angeles Litigation BlogIt should be simple: you provide a service, and your customer pays you for that service. Unfortunately, it is not always so simple.
Not getting paid for your work can be one of the most frustrating issues, especially for small businesses. It also does not take much for money matters to
lead to larger disputes. So, what should small business owners do in these cases?
1. Start with a reminder notice
Most sources, including the
U.S. Chamber of Commerce, agree that business owners should not begin by escalating the situation. Take time to review and fully understand the circumstances of this individual case. Then, begin with resending the invoice or sending reminders to pay.
Read the court decisionRead the full story...Reprinted courtesy of
Scott L. Baker, Baker & AssociatesMr. Baker may be contacted at
slb@bakerslaw.com
St Louis County Approves Settlement in Wrongful Death Suit
August 13, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to the StarTribune, the St Louis County Board agreed to pay $100,000 to settle with the family of a teenager who had been killed in a car crash. The family purported that “an improperly placed road construction sign contributed to the accident that caused her death.”
Defendants in the suit included the county, Benchmark Engineering, and Jola & Sopp Excavating. The county board settled, but denied liability.
Read the court decisionRead the full story...Reprinted courtesy of
The OFCCP’s November 2019 Updated Technical Assistance Guide: What Every Federal Construction Contractor Should Know
March 23, 2020 —
Sarah K. Carpenter - Smith CurrieThe Department of Labor (“DOL”) Office of Federal Contract Compliance Programs (“OFCCP”) issued its 148-page Updated Construction Contractor Technical Assistance Guide (the “Guide”) on November 13, 2019. A complete copy of the Guide can be found
here, but the below provides a summary of what every Federal Construction Contractor should know regarding the OFCCP’s November 2019 update to its prior 2006 publication.
The DOL has identified the Guide as a “self-assessment tool” to assist contractors in meeting “their legal requirements and responsibilities for equal employment opportunity by preventing violations before they occur.” However, the Guide does not create or impose new requirements for Federal Construction Contractors. Instead, the Guide provides an overview of anti-discrimination and affirmative action requirements and obligations under existing laws and regulations, and suggests best practices and guidance. Specifically, the Guide provides:
- A concise summary of Federal Construction Contractors’ legal obligations under the three main laws enforced by the OFCCP: Executive Order 11246, Section 503 of the Rehabilitation Act of 1973, and the Vietnam Era Veterans’ Readjustment Assistance Act of 1974;
- A detailed explanation of requirements for written Affirmative Action Plans;
- A clear schedule of Standard Federal Equal Employment Opportunity Construction Contract Specifications;
- A reorganized recap of the sixteen affirmative action steps Federal Construction Contractors are required to implement in good-faith; and
- A user-friendly roadmap of what to expect during an OFCCP audit, including a discussion of record keeping requirements.
Read the court decisionRead the full story...Reprinted courtesy of
Sarah K. Carpenter, Smith CurrieMs. Carpenter may be contacted at
skcarpenter@smithcurrie.com
Preliminary Notices: Common Avoidable But Fatal Mistakes
August 26, 2019 —
William L. Porter - Porter Law GroupIn the California building and construction industry, service of a “Preliminary Notice” is a prerequisite for Subcontractor and Supplier claims for payment through the Mechanics Lien, Stop Payment Notice and Payment Bond Claim process. Without proper drafting and service of a Preliminary Notice, these extremely valuable claims cannot be protected. Unfortunately, despite the vital importance of the Preliminary Notice, Subcontractors and Suppliers often make common self-defeating mistakes that make their Preliminary Notice efforts completely ineffective, resulting in loss of their claims rights. The purpose of this article is to list some of these common mistakes in the hope that the reader will avoid such mistakes, preserve the integrity of the Preliminary Notice, and protect the claims rights it makes available:
Not Sending out the Preliminary Notice Within 20 Days After Supplying Labor or Materials:
The protection of a Preliminary Notice begins 20 days before it sent out. This means that if a Subcontractor or Supplier claimant delivered $100,000 in materials on February 1, that same claimant must serve the Preliminary Notice on or before February 21 (the sooner the better), or the claimant will not be able to pursue an enforceable Mechanics Lien, Stop Payment Notice or Payment Bond claim for that $100,000. There are very few exceptions. Best practice: A Subcontractor or Supplier must send out the Preliminary Notice as soon as an agreement to provide work or materials to a California construction project is in place (See California Civil Code 8204).
Read the court decisionRead the full story...Reprinted courtesy of
William L. Porter, Porter Law GroupMr. Porter may be contacted at
bporter@porterlaw.com
Insurers Subrogating in Arkansas Must Expend Energy to Prove That Their Insureds Have Been Made Whole
August 06, 2019 —
Michael J. Ciamaichelo - The Subrogation StrategistArkansas employs the “made whole” doctrine, which requires an insured to be fully compensated for damages (i.e., to be “made whole”) before the insurer is entitled to recover in subrogation.[1] As the Riley court established, an insurer cannot unilaterally determine that its insured has been made whole (in order to establish a right of subrogation). Rather, in Arkansas, an insurer must establish that the insured has been made whole in one of two ways. First, the insurer and insured can reach an agreement that the insured has been made whole. Second, if the insurer and insured disagree on the issue, the insurer can ask a court to make a legal determination that the insured has been made whole.[2] If an insured has been made whole, the insurer is the real party in interest and must file the subrogation action in its own name.[3] However, when both the insured and an insurer have claims against the same tortfeasor (i.e., when there are both uninsured damages and subrogation damages), the insured is the real party in interest.[4]
In EMC Ins. Cos. v. Entergy Ark., Inc., 2019 U.S. App. LEXIS 14251 (8th Cir. May 14, 2019), EMC Insurance Companies (EMC) filed a subrogation action in the District Court for the Western District of Arkansas alleging that its insureds’ home was damaged by a fire caused by an electric company’s equipment. EMC never obtained an agreement from the insureds or a judicial determination that its insureds had been made whole. In addition, EMC did not allege in the complaint that its insureds had been made whole and did not present any evidence or testimony at trial that its insureds had been made whole. After EMC presented its case-in-chief, the District Court ruled that EMC lacked standing to pursue its subrogation claim because “EMC failed to obtain a legal determination that its insureds had been made whole . . . prior to initiating this subrogation action.” Thus, the District Court granted Entergy Ark., Inc.’s motion for judgment as a matter of law and EMC appealed the decision.
Read the court decisionRead the full story...Reprinted courtesy of
Michael J. Ciamaichelo, White and Williams LLPMr. Ciamaichelo may be contacted at
ciamaichelom@whiteandwilliams.com